23.3 MINING
In addition to the standard analysis and design elements essential for a FS Mine design, the following mining activities are recommended:
- Mine Equipment Selection:
o Conventional equipment selection
Detailed quotes from vendors
Continuous Miner Evaluation:
o Examination of the use of Wirtgen to
reduce blasting needs
size material to potentially reduce crushing capital for sulfide material
potential increase in recovery with smaller material for ROM heap leach facilities
Blasting Analysis:
o Detailed blasting analysis for areas adjacent to existing infrastructure
- Waste Rock Storage Facility Optimization:
o Optimizing the design of waste storage facilities.
- Contract Mining Comparison:
o Conducting a comprehensive assessment of contract mining options suitable for each pit area
The cost of mining analysis and optimization is estimated to be $0.50 million during the FS.