A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 25, 2026

CPK$140.28-1.0%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-26.

0001628280-25-008213

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-25.

0001628280-26-011753

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 254 previous paragraphs and 248 current paragraphs.

149 unchanged; 70 reworded; 23 added; 30 removed; 5 previous and 6 current paragraphs rearranged.

Tables are not compared: 22 previous and 22 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (23)

Current report

(2) Refer to Major Projects and Initiatives table for additional information.

Current report

(3)Reflects the impact of common shares issued under the DRIP and ATM program.

Current report

For the year ended December 31, 2025, these projects generated additional adjusted gross margin of $2.3 million.

Current report

In June 2025, Eastern Shore filed a limited amended application with the FERC requesting revised initial transportation rates for the project. The revised rates reflected increased capital costs associated with unanticipated changes in global markets and supply chains, including the availability of skilled laborers with the requisite certifications to work on this project. Eastern Shore requested expedited action by the FERC in relation to this matter and an approved order was issued in July 2025. Construction is underway and the project is expected to be placed into service in mid-2026. The project generated adjusted

Current report

Chesapeake Utilities Corporation 2025 Form 10-K Page 36 gross margin of $0.3 million for the year ended December 31, 2025, and is expected to contribute adjusted gross margin of approximately $10.6 million in 2026 and $17.1 million thereafter.

Current report

In September 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of the Transportation Service Agreement with FCG for a series of projects that will enhance gas infrastructure in Miami-Dade County. The proposed expansion consists of the development of several pipeline projects to support growth and FCG's distribution system, as well as enhance FCG's access to gas from various points in the Miami-Dade County area. The expansion was approved in February 2025 and interim services began in August 2025 with permanent facilities expected to be in service by the second quarter of 2026. The project generated adjusted gross margin of $2.8 million for the year ended December 31, 2025, and is expected to contribute adjusted gross margin of approximately $7.6 million in 2026 and thereafter.

Current report

In July 2025, Aspire Energy Express entered into an agreement with American Electric Power to construct and operate an intrastate natural gas pipeline in central Ohio to serve a new fuel-cell facility, which will provide on-site electric power to a data center. This new transmission infrastructure is expected to be in service in the first half of 2027 and is expected to contribute adjusted gross margin of approximately $1.5 million in 2027.

Current report

In October 2025, FPU and FCG filed a joint petition for approval to establish a recovery surcharge for actual, estimated and projected relocation costs pursuant to the Florida Administrative Code which enables companies to recover the costs associated with relocating or reconstructing facilities that have been required by governmental entities. The projected revenue requirement for 2026 is $0.5 million for FPU and $1.0 million for FCG. The Florida PSC approved the petition in February 2026, with the surcharge effective in March 2026.

Current report

In February 2026, FCG provided notice to the Florida PSC of its intent to file a petition seeking a general rate base increase based on a 2027 projected test year. The rate case filing is expected to be submitted in April 2026 and the outcome of the application will be subject to review and approval by the Florida PSC.

Current report

The increase in adjusted gross margin resulting from customer growth is provided in the following table:

Current report

(2) Includes the absence of an RSAM adjustment from FCG which represented a $15.5 million benefit during the year ended December 31, 2024.

Current report

Chesapeake Utilities Corporation 2025 Form 10-K Page 43 program, FPU Electric's SPP, and Eastern Shore's Capital Cost Surcharge program. Refer to Note 17, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.

Current report

Customer consumption, inclusive of weather-related consumption, increased adjusted gross margin by $2.4 million for the year ended December 31, 2025.

Current report

In November 2024, we established a new ATM program under which we may sell shares of our common stock up to an aggregate offering price of $100.0 million. This current ATM program is active through November 2027. For the year ended December 31, 2025 and 2024, we received net proceeds of $123.2 million and $72.5 million, respectively, associated with shares issued under the DRIP and our ATM program.

Current report

•Net changes in assets and liabilities resulted in a use of cash of $39.5 million mainly due to an increase in net receivables, accrued revenue and regulatory assets.
Removed paragraphs (30)

Previous report

*** Reflects the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG and shares also issued in 2024.

Previous report

(1) Includes adjusted gross margin during 2023 comprised of both interim rates and permanent base rates which became effective in March 2023.

Previous report

(2) Rate case application and depreciation study filed with the Maryland PSC in January 2024. See additional information provided below.

Previous report

Eastern Shore installed a new natural gas driven compressor skid unit at its existing Bridgeville, Delaware compressor station that provides 7,300 Dts of incremental firm transportation pipeline capacity. The project was placed in service in the fourth quarter of 2023. The project generated additional adjusted gross margin of $1.7 million for the year ended December 31, 2024, and is expected to produce adjusted gross margin of approximately $2.3 million in 2025 and thereafter.

Previous report

In June 2021, Peninsula Pipeline and FCG entered into a Transportation Service Agreement for an incremental 10,176 Dts/d of firm service in Indian River County, Florida, to support FCG's growth along the Indian River's barrier island. As part of this agreement, Peninsula Pipeline constructed approximately 11.3 miles of pipeline from its existing pipeline in the Sebastian, Florida. The project went into service in April 2023. Subsequent to the acquisition of FCG, the agreement is now an affiliate agreement. The project generated additional adjusted gross margin of $0.6 million for the year ended December 31, 2024, and is expected to produce adjusted gross margin of approximately $2.4 million in 2025 and thereafter.

Previous report

In February 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 9,000 Dts/d of firm service in the Lake Wales, Florida area. The PSC approved the petition in April 2023 and Peninsula Pipeline completed the acquisition of an existing pipeline in May 2023 that is being utilized to serve both current and new natural gas customers. The project generated additional adjusted gross margin of $0.2 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $0.5 million in 2025 and thereafter.

Previous report

In March 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of Firm Transportation Service Agreements with both FCG and FPU for a project that will support greater supply growth of natural gas service in southeast Florida. The project consists of the transfer of a pipeline asset from FCG to Peninsula Pipeline. Peninsula Pipeline will proceed to provide transportation service to both FCG and FPU using the pipeline asset, which supports continued customer growth and system reinforcement of these distribution systems. The Florida PSC approved the petition in July 2024 and the project was completed in September 2024.

Previous report

In May 2022, our legacy natural gas distribution businesses in Florida filed a consolidated natural gas rate case with the Florida PSC. The application included a request for the following: (i) permanent rate relief of approximately $24.1 million, effective January 1, 2023, (ii) a depreciation study also submitted with the filing; (iii) authorization to make certain changes to tariffs to include the consolidation of rates and rate structure across the businesses and to unify the Florida Natural Gas distribution business under FPU; (iv) authorization to retain the acquisition adjustment recorded at the time of the FPU merger in our revenue requirement; and (v) authorization to establish an environmental remediation surcharge for the purposes of addressing future expected remediation costs for FPU MGP sites. In August 2022, interim rates were approved by the Florida PSC in the amount of approximately $7.7 million on an annualized basis, effective for all meter readings in September 2022. In January 2023, the Florida PSC approved the application for consolidation and permanent rate relief of approximately $17.2 million on an annual basis. Actual rates were approved by the Florida PSC in February 2023 with an effective date of March 1, 2023. The proceeding is expected to generate $17.2 million of total adjusted gross margin in 2025 and thereafter.

Previous report

(1)Includes growth amounts for our legacy Florida operations, but excludes the effects of FCG.

Previous report

FCG contributed incremental adjusted gross margin of $88.6 million for the year ended December 31, 2024.

Previous report

Rate Changes Associated with the Florida Natural Gas Base Rate Proceeding

Previous report

Permanent rates associated with the Florida Natural Gas base rate proceeding, effective on March 1, 2023, contributed additional adjusted gross margin of $1.6 million for the year ended December 31, 2024. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.

Previous report

Expiration of Regulatory Recovery for Pandemic Related Costs

Previous report

The expiration of regulatory recovery for pandemic related costs offset adjusted gross margin by $1.2 million for the year ended December 31, 2024.

Previous report

•Contributions from acquisition- Adjusted gross margin increased by $1.0 million from the acquisition of J.T. Lee and Son's that was completed in December 2023.

Previous report

•Increase in gathering charges -Adjusted gross margin increased by $1.6 million primarily due to increased gathering charges associated with a large commercial customer.

Previous report

For the year ended December 31, 2024, we received net proceeds of $72.5 million associated with shares issued under the direct stock purchase and waiver components of the DRIP. During 2023, there were no issuances under the DRIP.

Previous report

On March 14, 2023, we issued 5.43 percent Senior Notes due in March 2038 in the aggregate principal amount of $80.0 million and used the proceeds received from the issuances of the Senior Notes to reduce short-term borrowings under our Revolver and to fund capital expenditures. These Senior Notes have similar covenants and default provisions as our other Senior Notes, and have an annual principal amortization payment beginning in the sixth year after the issuance.

Previous report

•Net borrowings under the Revolver of $14.1 million; partially offset by

Previous report

(2) See Item 8, Financial Statements and Supplementary Data, Note 14, Leases, for additional information.
Reworded paragraphs (70)

Previous wording

On November 30, 2023, we completed the acquisition of FCG for $922.8 million in cash, including working capital adjustments as defined in the agreement that were settled during the first quarter of 2024, pursuant to the stock purchase agreement with Florida Power & Light Company. Upon completion of the acquisition, FCG became a wholly-owned subsidiary of the Company and is included within our Regulated Energy segment. FCG serves approximately 123,000 residential and commercial natural gas customers across eight counties in Florida, including Miami-Dade, Broward, Brevard, Palm Beach, Hendry, Martin, St. Lucie and Indian River. Its natural gas system includes approximately 3,982 miles of distribution main and 80 miles of transmission pipe. Results for FCG are included within our consolidated results from the acquisition date.

Current wording

On November 30, 2023, we completed the acquisition of FCG for $922.8 million in cash, including working capital adjustments as defined in the agreement that were settled during the first quarter of 2024, pursuant to the stock purchase agreement with Florida Power & Light Company. Upon completion of the acquisition, FCG became a wholly-owned subsidiary of the Company and is included within our Regulated Energy segment. FCG currently serves approximately 125,000 residential and commercial natural gas customers across eight counties in Florida, including Miami-Dade, Broward, Brevard, Palm Beach, Hendry, Martin, St. Lucie and Indian River. Results for FCG are included within our consolidated results from the acquisition date.

Previous wording

In June 2023, FCG received approval from the Florida PSC for a $23.3 million total increase in base revenue in connection with its May 2022 rate case filing. The new rates, which became effective as of May 1, 2023, included the transfer of its SAFE program provisions from a rider clause to base rates, an increase in rates associated with a liquefied natural gas facility, and approval of FCG's proposed reserve surplus amortization mechanism ("RSAM") with a $25.0 million reserve amount. The RSAM is recorded as either an increase or decrease to accrued removal costs on the balance sheet, with a corresponding increase or decrease to depreciation and amortization expense. At December 31, 2024, the RSAM reserve had been completely utilized.

Current wording

In June 2023, FCG received approval from the Florida PSC for a $23.3 million total increase in base revenue in connection with its May 2022 rate case filing. The new rates, which became effective as of May 1, 2023, included the transfer of its SAFE program provisions from a rider clause to base rates, an increase in rates associated with a liquefied natural gas facility, and approval of FCG's proposed RSAM with a $25.0 million reserve amount. The RSAM was recorded as either an increase or decrease to accrued removal costs on the balance sheet, with a corresponding increase or decrease to depreciation and amortization expense. At December 31, 2024, the RSAM reserve had been completely utilized.

Previous wording

In February 2025, FCG filed a depreciation study with the Florida PSC. The application is requesting approval of revised annual depreciation rates, as well as a reduction related to a reserve imbalance that would be amortized over a two-year period. The outcome of the application is subject to review and approval by the Florida PSC.

Current wording

In February 2025, FCG filed a depreciation study with the Florida PSC. The application is requesting approval of revised annual depreciation rates, as well as a reduction related to a reserve imbalance that would be amortized over a two-year period. The outcome of the application was subject to review and approval by the Florida PSC. In February 2026, the Florida PSC approved a $6.8 million reserve imbalance to be amortized over the remaining life of the assets, with the revised depreciation rates effective as of January 1, 2025.

Previous wording

We calculate Adjusted Gross Margin by deducting the purchased cost of natural gas, propane and electricity and the cost of labor spent on direct revenue-producing activities from operating revenues. The costs included in Adjusted Gross Margin exclude depreciation and amortization and certain costs presented in operations and maintenance expenses in accordance with regulatory requirements. We calculate Adjusted Net Income and Adjusted EPS by deducting non-recurring costs and expenses associated with significant acquisitions that may affect the comparison of period-over-period results. These non-GAAP financial measures are not in accordance with, or an alternative to, GAAP and should be considered in addition to, and not as a substitute for, the comparable GAAP measures. We believe that these non-GAAP financial measures are useful and meaningful to investors as a basis for making investment decisions, and provide investors with information that demonstrates the profitability achieved by the Company under allowed rates for regulated energy operations and under the Company's competitive pricing structures for unregulated energy operations. The Company's management uses these non-GAAP financial measures in assessing a business unit's and the overall Company performance. Other companies may calculate these non-GAAP financial measures in a different manner.

Current wording

We calculate Adjusted Gross Margin by deducting the purchased cost of natural gas, propane and electricity and the cost of labor spent on direct revenue-producing activities from operating revenues. The costs included in Adjusted Gross Margin exclude depreciation and amortization and certain costs presented in operations and maintenance expenses in accordance with regulatory requirements. We calculate Adjusted Net Income and Adjusted EPS by deducting non-recurring costs and expenses associated with significant acquisitions that may affect the comparison of period-over-period results. These non-GAAP financial measures are not in accordance with, or an alternative to, GAAP and should be considered in addition to, and not as a substitute for, the comparable GAAP measures. We believe that these non-GAAP financial measures are useful and meaningful to investors as a basis for making investment decisions, and provide investors with information that demonstrates the profitability achieved by the Company under allowed rates for regulated energy operations and under the Company's competitive pricing structures for unregulated energy operations. The Company's management uses these non-GAAP financial

Previous wording

Gross Margin (GAAP) for the Regulated Energy segment for 2024 was $341.8 million, an increase of $83.9 million, or 32.5 percent, compared to 2023. Higher gross margin reflects contributions attributable to the acquisition of FCG, incremental margin from regulatory initiatives and infrastructure programs, natural gas organic growth and pipeline expansion projects.

Current wording

Gross Margin (GAAP) for the Regulated Energy segment for 2025 was $368.4 million, an increase of $26.6 million, or 7.8 percent, compared to 2024. Higher gross margin largely reflects incremental margin from regulatory initiatives and infrastructure programs, pipeline expansion projects and natural gas organic growth.

Previous wording

Gross Margin (GAAP) for the Unregulated Energy segment for 2024 was $78.2 million, an increase of $6.4 million, or 8.9 percent, compared to 2023. Higher gross margin resulted from increased levels of virtual pipeline services and increased propane consumption, margins and service fees.

Current wording

Gross Margin (GAAP) for the Unregulated Energy segment for 2025 was $84.7 million, an increase of $6.5 million, or 8.3 percent, compared to 2024. Higher gross margin resulted primarily from increased CNG, RNG and LNG services, and increased customer consumption.

Previous wording

(2)Weighted average shares reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG. See Notes 4 and 15 for additional details on the acquisition and related equity offering.

Current wording

(2)Weighted average shares reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG. See Notes 4 and 14 for additional details on the acquisition and related equity offering.

Previous wording

Net income (GAAP) for the year ended December 31, 2024 was $118.6 million, or $5.26 per share, compared to $87.2 million, or $4.73 per share in 2023. Net income for the years ended December 31, 2024 and 2023 included $2.9 million and $10.6 million, respectively, of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $23.7 million or 24.2 percent compared to the prior year.

Current wording

Net income (GAAP) for the year ended December 31, 2025 was $140.3 million, or $5.97 per share, compared to $118.6 million, or $5.26 per share in 2024. Net income for the years ended December 31, 2025 and 2024 included $0.8 million and $2.9 million, respectively, of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $19.6 million.

Previous wording

** Transaction and transition-related expenses attributable to the acquisition and integration of FCG have been excluded from the Company’s non-GAAP

Current wording

(1) Transaction and transition-related expenses attributable to the acquisition and integration of FCG have been excluded from the Company’s non-GAAP measures of adjusted net income and adjusted EPS. See reconciliations above for a detailed comparison to the related GAAP measures.

Previous wording

(3) Includes adjusted gross margin attributable to interim rates during 2024. See additional information provided below.

Current wording

(1) Includes adjusted gross margin attributable to interim rates during 2024 and 2025. See additional information provided below.

Previous wording

In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dts/d of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. This project was placed into service in July 2023 and generated additional adjusted gross margin of $0.3 million for the year ended December 31, 2024. We expect this extension to generate annual adjusted gross margin of $0.6 million in 2025 and thereafter.

Current wording

In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dts/d of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. We expect this extension to generate annual adjusted gross margin of $0.6 million in 2026 and thereafter.

Previous wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of an amendment to its Transportation Service Agreement with FPU for a project that will support additional supply to communities in the St. Cloud, Florida area. The project is driven by the need to expand gas service to future communities that are expected in that area. Peninsula Pipeline will construct pipeline expansions that will allow FPU to serve the expected new growth. The expansion will provide FPU with an additional 10,000 Dts/d. The Florida PSC approved the project in May 2024, and it is expected to be complete in the fourth quarter of 2025. We expect this expansion to generate approximately $2.2 million of adjusted gross margin in 2025 and $3.2 million thereafter.

Current wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of an amendment to its Transportation Service Agreement with FPU for a project that will support additional supply to communities in the St. Cloud, Florida area. The project is driven by the need to expand gas service to future communities that are expected in that area. Peninsula Pipeline will construct pipeline expansions that will allow FPU to serve the expected new growth. The expansion will provide FPU with an additional 10,000 Dts/d. The Florida PSC approved the project in May 2024, and it is expected to be complete in the second quarter of 2026. We expect this expansion to generate approximately $3.2 million of adjusted gross margin in 2026 and thereafter.

Previous wording

In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement enables us to construct the project during the build-out of the community and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. The petition was approved by the Florida PSC in November 2022. The various phases of the project commenced in the first quarter of 2023, with construction on the overall project continuing through 2025. The project generated additional adjusted gross margin of $1.0 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $3.0 million in 2025 and $4.3 million thereafter.

Current wording

In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement enables us to construct the project during the build-out of the community and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. The petition was approved by the Florida PSC in November 2022. The various phases of the project commenced in the first quarter of 2023, and construction was completed in 2025. The project generated additional adjusted gross margin of $1.1 million for the year ended December 31, 2025, and is expected to contribute adjusted gross margin of approximately $4.3 million in 2026 and thereafter.

Previous wording

In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dts/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of existing Company owned propane community gas systems in Newberry was made in November 2023. The Florida PSC approved it in April 2024, and conversions of the community gas systems commenced in the second quarter of 2024. The project generated adjusted gross margin of $1.4 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $2.6 million in 2025 and thereafter.

Current wording

In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dts/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of existing Company owned propane community gas systems in Newberry was made in November 2023. The Florida PSC approved it in April 2024. Conversions of the community gas systems commenced in the second quarter of 2024 and are projected to be complete in the first quarter of 2026. The project generated additional adjusted gross margin of $1.2 million for the year ended December 31, 2025, and is expected to contribute adjusted gross margin of approximately $2.6 million in 2026 and thereafter.

Previous wording

In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. In January 2025, the FERC approved the project, and construction is expected to be complete in the third quarter of 2025. The project is expected to contribute adjusted gross margin of approximately $3.0 million in 2025 and $13.7 million thereafter.

Current wording

In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. In January 2025, the FERC approved the project.

Previous wording

In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that have experienced an increase in population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/d and 3,400 Dts/d, respectively. The Florida PSC approved the projects in March 2024. Construction is projected to be complete in the second and fourth quarters of 2025 for New Smyrna Beach and Boynton Beach, respectively. The projects are expected to contribute adjusted gross margin of approximately $4.8 million in 2025 and $6.0 million in 2026 and thereafter.

Current wording

In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that have experienced an increase in population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/d and 3,400 Dts/d, respectively. The Florida PSC approved the projects in March 2024. New Smyrna Beach was placed into service during May 2025 and construction is projected to be complete for Boynton Beach in the second quarter of 2026. The projects generated adjusted gross margin of $4.6 million for the year ended December 31, 2025, and are expected to contribute adjusted gross margin of approximately $6.0 million in 2026 and thereafter.

Previous wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Plant City and Lake Mattie with an additional 5,000 Dts/d and 8,700 Dts/d, respectively. The Florida PSC approved the projects in May 2024. The Plant City project was completed in the fourth quarter of 2024, and the Lake Mattie project is projected to be completed during the fourth quarter of 2025. The completed project generated adjusted gross margin of $0.1 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $2.0 million in 2025 and $4.3 million thereafter.

Current wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that are experiencing significant population growth. Peninsula Pipeline's extensions support FPU’s distribution system around the Plant City and Lake Mattie area's of Florida with an additional 5,000 Dts/d and 8,700 Dts/d, respectively. The Florida PSC approved the projects in May 2024. The Plant City project was completed in the fourth quarter of 2024, and the Lake Mattie project went into service in July 2025. The projects generated additional adjusted gross margin of $2.5 million for the year ended December 31, 2025, and are expected to contribute adjusted gross margin of approximately $4.3 million in 2026 and thereafter.

Previous wording

In July 2024, we announced plans to extend Eastern Shore's transmission deliverability by constructing an additional 4.4 miles of six inch steel pipeline. The project will reinforce the supply and growth for our Delaware division distribution system and expand natural gas service further into Maryland for anticipated future growth. This project was placed into service during the fourth quarter of 2024, generated adjusted gross margin of $0.4 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $1.9 million in 2025 and thereafter.

Current wording

In July 2024, we announced plans to extend Eastern Shore's transmission deliverability by constructing an additional 4.4 miles of six inch steel pipeline. The project will reinforce the supply and growth for our Delaware division distribution system and expand natural gas service further into Maryland for anticipated future growth. This project was placed into service during the fourth quarter of 2024, generated additional adjusted gross margin of $1.5 million for the year ended December 31, 2025, and is expected to contribute adjusted gross margin of approximately $1.9 million in 2026 and thereafter.

Previous wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of its Transportation Service Agreements with FCG for projects that will support the transportation of additional renewable energy supply to FCG. The projects, located in Florida’s Brevard, Indian River and Miami-Dade counties, will bring renewable natural gas produced from local landfills into FCG’s natural gas distribution system. Peninsula Pipeline will construct several pipeline extensions which

Current wording

In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of Transportation Service Agreements with FCG for projects that will support the transportation of additional renewable energy supply to FCG. The projects, located in Florida’s Brevard, Indian River and Miami-Dade counties, will bring renewable natural gas produced from local landfills into FCG’s natural gas distribution system. Peninsula Pipeline will construct several pipeline extensions which will support FCG's distribution system in Brevard County, Indian River County, and Miami-Dade County. Benefits of these projects include increased gas supply to serve expected FCG growth, strengthened system reliability and additional system flexibility. The Florida PSC approved the petition at its July 2024 meeting. In October 2025, the Florida PSC approved amendments to the Transportation Service Agreements that were filed to include Peninsula Pipeline as a party to the related interconnection agreements. The projects are underway and are estimated to be completed in the second half of 2026. These three renewable projects generated adjusted gross margin of $2.5 million for the year ended December 31, 2025, and are projected to generate total adjusted gross margin of approximately $5.4 million in 2026 and $6.4 million thereafter.

Previous wording

For the year ended December 31, 2024, we generated $5.3 million in additional adjusted gross margin including the margin attributable to the Full Circle Dairy and Noble Road projects described below. We estimate annual adjusted gross margin of approximately $20.0 million in 2025, and $20.7 million in 2026 for these transportation related services, with potential for additional growth in future years.

Current wording

For the year ended December 31, 2025, we generated $10.9 million in additional adjusted gross margin including the margin attributable to the Full Circle Dairy and Noble Road projects described below. We estimate annual adjusted gross margin of approximately $28.5 million in 2026, and $29.7 million in 2027 for these transportation related services, with potential for additional growth in future years.

Previous wording

In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205 million of capital expenditures projected to be spent over a 10-year period. For the year ended December 31, 2024, there was $3.2 million of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $6.3 million of adjusted gross margin in 2025 and $8.8 million in 2026.

Current wording

In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205.0 million of capital expenditures projected to be spent over a 10-year period. For the year ended December 31, 2025, there was $3.5 million of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $10.1 million of adjusted gross margin in 2026 and $13.0 million in 2027.

Previous wording

In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Commission approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205 million over a 10-year period. For the year ended December 31, 2024, there was $3.8 million of adjusted gross margin generated pursuant to the program. The program is expected to generate $8.3 million of adjusted gross margin in 2025 and $10.9 million in 2026.

Current wording

In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Florida PSC approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205.0 million over a 10-year period. For the year ended December 31, 2025, there was $4.6 million of additional adjusted gross margin generated pursuant to the program. The program is expected to generate $12.7 million of adjusted gross margin in 2026 and $16.4 million in 2027.

Previous wording

In April 2024, FCG filed a petition with the Florida PSC to more closely align the SAFE Program with FPU's GUARD program. Specifically, the requested modifications will enable FCG to accelerate remediation related to problematic pipe and facilities consisting of obsolete and exposed pipe. These efforts will serve to improve the safety and reliability of service to FCG's customers, and the modifications will result in an estimated additional $50.0 million in capital expenditures associated with the SAFE Program which would increase the total projected capital expenditures to approximately $255.0 million over a 10-year period. The Florida PSC approved the modifications in September 2024.

Current wording

In April 2024, FCG filed a petition with the Florida PSC to more closely align the SAFE Program with FPU's GUARD program. Specifically, the requested modifications will enable FCG to accelerate remediation related to problematic pipe and facilities consisting of obsolete and exposed pipe. These efforts will serve to improve the safety and reliability of service to FCG's customers, and the modifications will result in an estimated additional$50.0 million in capital expenditures associated with the SAFE Program which would increase the total projected capital expenditures to approximately$255.0 million over a 10-year period. The Florida PSC approved the modifications in September 2024.

Previous wording

In December 2024, Eastern Shore submitted a filing with the FERC regarding a capital cost surcharge to recover capital costs associated with the replacement of existing Eastern Shore facilities because of mandated highway relocation projects as well as compliance with a PHMSA regulation. The capital cost surcharge mechanism was approved in Eastern Shore's last rate case. In conjunction with the filing of this surcharge, a cumulative adjustment to the existing surcharge to reflect additional depreciation was included. The FERC issued an order approving the surcharge as filed in December 2024. The combined revised surcharge became effective January 1, 2025. For the year ended December 31, 2024, there was$0.4 million of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately$5.3 million in 2025 and$6.7 million in 2026 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.

Current wording

In December 2025, Eastern Shore submitted a filing with the FERC regarding a capital cost surcharge to recover capital costs associated with the replacement of existing Eastern Shore facilities because of mandated highway relocation projects as well as compliance with PHMSA regulation. The capital cost surcharge mechanism was approved in Eastern Shore's last rate case. In conjunction with the filing of this surcharge, a cumulative adjustment to the existing surcharge to reflect additional depreciation was included. The FERC issued an order approving the surcharge as filed in December 2025. The combined revised surcharge became effective January 1, 2026. For the year ended December 31, 2025, there was$2.5 million of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately$9.0 million in 2026 and$10.1 million in 2027 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.

Previous wording

In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed during the first quarter of 2022 and approved in the fourth quarter of 2022, with modifications, by the Florida PSC. In October 2024, the Florida PSC approved the Company's projected 2025 SPP costs for both capital and operating expenses. For the year ended December 31, 2024, this initiative generated incremental adjusted gross margin of $1.9 million, and is expected to generate$5.6 million in 2025 and 2026. We expect continued investment under the SPP going forward.

Current wording

In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed and approved in 2022, with modifications, by the Florida PSC. Rates associated with this initiative were effective in January 2023. In October 2024, the Florida PSC approved the Company's projected 2025 SPP costs of $20.4 million for both capital and operating expenses. Our Florida electric distribution operations filed an updated SPP plan in January 2025 which was approved in June 2025, with modifications by the Florida PSC. For the year ended December 31, 2025, this initiative generated incremental adjusted gross margin of $3.2 million, and is expected to generate$9.1 million in 2026. We expect continued investment under the SPP going forward.

Previous wording

In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we sought approval of the following: (i) permanent rate relief of approximately $6.9 million with an ROE of 11.5 percent; (ii)authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses which we anticipate will be called Chesapeake Utilities of Maryland, Inc.; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. In August 2024, the Maryland natural gas distribution businesses, the Maryland Office of Peoples' Counsel ("OPC") and PSC Staff reached a settlement agreement which provided for, among other things, an increase in annual base rates of $2.6 million. In September 2024, the Maryland Public Utility Judge issued an order approving the settlement agreement in part. The $2.6 million increase in annual base rates was approved and the Company filed the Phase II filing in November 2024 to determine rate design across the Maryland natural gas distribution businesses, consolidation of the applicable tariffs and recovery of technology costs. The hearing has been scheduled for March 2025 and the outcome of the application is subject to review and approval by the Maryland PSC.

Current wording

In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, the “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we sought approval of the following: (i) permanent rate relief of approximately $6.9 million with a ROE of 11.5 percent; (ii) authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. In August 2024, the Maryland natural gas distribution businesses, the Maryland OPC and PSC staff reached a settlement which provided for, among other things, an increase in annual base rates of $2.6 million. In September 2024, the Maryland Public Utility Judge issued an order approving the related settlement agreement in part. The $2.6 million increase in annual base rates was approved, and the Company filed a Phase II filing in November 2024 to determine rate design across the Maryland natural gas distribution businesses, consolidation of the applicable tariffs and recovery of technology costs. The hearing was held in March 2025, during which Phase II was approved, including an additional $0.9 million in revenue requirement, for a total cumulative increase of $3.5 million. A final order was issued in April 2025 and included approval of the consolidation of the operations and the assets of CUC-Maryland Division, Sandpiper Energy, and Elkton Gas into one entity which was renamed and operates as Chesapeake Utilities of Maryland, Inc. For the year ended December 31, 2025, there was $1.5 million of adjusted gross margin generated pursuant to the program. The program is expected to generate $3.5 million of adjusted gross margin in 2026 and in 2027.

Previous wording

In January 2024, our Maryland natural gas distribution businesses filed a joint petition for approval of their proposed unified depreciation rates with the Maryland PSC. A settlement agreement between the Company, PSC staff and the OPC was reached and the final order approving the settlement agreement went into effect in July 2024, with new depreciation rates effective as of

Current wording

In January 2024, our Maryland natural gas distribution businesses filed a joint petition for approval of their proposed unified depreciation rates with the Maryland PSC. A settlement agreement between the Company, PSC staff and the OPC was reached and the final order approving the settlement agreement went into effect in July 2024, with new depreciation rates effective as of January 1, 2023. The approved depreciation rates resulted in an annual reduction in depreciation expense of approximately$1.2 million.

Previous wording

In August 2024, our Delaware natural gas division filed an application for a natural gas rate case with the Delaware PSC. In connection with the application, we are seeking approval of the following: (i) permanent rate relief of approximately $12.1 million with a ROE of 11.5 percent; (ii) proposed changes to depreciation rates which were part of a depreciation study also submitted with the filing; and (iii) authorization to make certain changes to tariffs. Annualized interim rates were approved by the Delaware PSC in the amount of $2.5 million and became effective October 2024. The hearing for the proceeding has been scheduled for May 2025, and the outcome of the application is subject to review and approval by the Delaware PSC.

Current wording

In August 2024, our Delaware natural gas division filed an application for a natural gas rate case with the Delaware PSC seeking approval of the following: (i) permanent rate relief of approximately $12.1 million with a ROE of 11.5 percent; (ii) proposed changes to depreciation rates which were part of a depreciation study also submitted with the filing; and (iii) authorization to make certain changes to tariffs. Annualized interim rates were approved by the Delaware PSC in the amount of $2.5 million and became effective in October 2024. A settlement among the Company, PSC staff and the Delaware Division of the Public Advocate was reached and approved by the Delaware PSC in June 2025 providing an annual revenue increase of $6.1 million, as well as dividing the rate case into two phases. Rates set to recover the approved components of the increase were effective in March 2025. In October 2025, a settlement was reached for Phase II of the rate case addressing tariff-related changes including rate design and approved by the Delaware Public Service Commission with rates effective as of October 15, 2025. For the year ended December 31, 2025, there was $4.1 million of additional adjusted gross margin generated and final rates are expected to generate approximately $6.1 million of adjusted gross margin in 2026 and in 2027.

Previous wording

In August 2024, our Florida Electric division filed a petition with the Florida PSC seeking a general base rate increase of $12.6 million with a ROE of 11.3 percent based on a 2025 projected test year. Annualized interim rates of approximately $1.8 million were approved with an effective date of November 1, 2024. The outcome of the application is subject to review and approval by the Florida PSC. The hearings for the approval of the revenue requirement and rates are scheduled to occur in March 2025.

Current wording

In August 2024, our Florida Electric division filed a petition with the Florida PSC seeking a general base rate increase of $12.6 million with a ROE of 11.3 percent based on a 2025 projected test year. Annualized interim rates of approximately $1.8 million were approved with an effective date of November 1, 2024. In March 2025, the Florida PSC approved the permanent rate increase, but the order was subsequently protested. In May 2025, the Company reached a settlement agreement with the interested parties to resolve all outstanding issues. This settlement which was approved by the Florida PSC in July 2025, provides for a total base rate increase of approximately $8.6 million on an annual basis, with $1.0 million of the increase deferred from the first year's base rate increase and recovered over three years. A step-up rate increase was also approved for up to $0.7 million, upon completion of the purchase and refurbishment of certain substations, which is expected to be completed in December 2026. For the year ended December 31, 2025, there was $7.0 million of additional adjusted gross margin generated and final rates are expected to generate approximately $8.6 million of adjusted gross margin in 2026 and $9.1 million in 2027.

Previous wording

In 2024, higher consumption which includes the effects of colder weather compared to the prior year resulted in a $0.3 million increase in adjusted gross margin. While temperatures in our Delmarva service territories were colder than the prior year, our Ohio service territories experienced warmer temperatures compared to 2023. In addition, temperatures in the Delmarva and Ohio service territories in 2024 were both approximately 10 percent warmer compared to normal temperatures. The following table summarizes HDD and CDD variances from the 10-year average HDD/CDD ("Normal") for the years ended 2024 compared to 2023, and 2023 compared to 2022.

Current wording

In 2025, increased customer consumption, which includes the effects of colder weather, largely in the Company's Ohio, Delmarva and Florida service areas, compared to the prior year resulted in a $9.5 million increase in adjusted gross margin. The following table summarizes HDD and CDD variances from the 10-year average HDD/CDD ("Normal") for the years ended 2025 compared to 2024, and 2024 compared to 2023.

Previous wording

The average number of residential customers served on the Delmarva Peninsula and our legacy Florida Natural Gas distribution business increased by approximately 4.0 percent and 3.9 percent, respectively, during 2024.

Current wording

The average number of residential customers served on the Delmarva Peninsula, by FPU and by FCG increased by approximately 4.1 percent, 3.6 percent and 2.2 percent, respectively, during 2025.

Previous wording

Operating income for the Regulated Energy segment for 2024 was $196.2 million, an increase of $70.0 million or 55.5 percent compared to 2023. Excluding transaction and transition-related expenses associated with the acquisition of FCG, operating income increased $63.6 million or 46.6 percent compared to the prior year. Higher operating income reflects incremental contributions from the acquisition of FCG, incremental margin from our regulatory initiatives and infrastructure programs, and organic growth in our natural gas distribution businesses and pipeline expansion projects. Excluding the transaction and transition-related expenses described above, operating expenses increased by $42.0 million compared to the prior year primarily attributable to increased FCG operating expenses, higher depreciation, amortization and property taxes and increased facilities expenses, maintenance costs and outside services. Increases in depreciation, amortization and property taxes attributable to growth projects and FCG were offset by lower depreciation rates that were approved as part of the rate filings for our Florida electric operations and Maryland natural gas utilities and a $10.4 million increase in the RSAM adjustment from FCG in 2024 compared to the prior year.

Current wording

Operating income for the Regulated Energy segment for 2025 was $222.0 million, an increase of $25.8 million compared to 2024. Excluding transaction and transition-related expenses associated with the acquisition of FCG, operating income increased $23.0 million or 11.5 percent compared to the prior year. Higher operating income reflects incremental margin from our regulatory initiatives and infrastructure programs, pipeline expansion projects and organic growth in our natural gas distribution businesses. Excluding the transaction and transition-related expenses described above, operating expenses increased by $31.8 million compared to the prior year primarily attributable to higher depreciation, amortization and property taxes and increased facilities expenses, maintenance costs and outside services. Increases in depreciation are attributable to growth projects and the absence of an RSAM adjustment from FCG which represented a $15.5 million benefit compared to the prior year.

Previous wording

(1)Includes adjusted gross margin contributions from permanent base rates that became effective in March 2023.

Current wording

(1)Includes adjusted gross margin contributions from both interim and permanent base rates. Refer to Major Projects discussion for additional information.

Previous wording

We generated increased adjusted gross margin of $5.2 million for the year ended December 31, 2024 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.

Current wording

We generated increased adjusted gross margin of $18.8 million for the year ended December 31, 2025 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.

Previous wording

Regulated infrastructure programs generated incremental adjusted gross margin of $6.2 million for the year ended December 31, 2024. The increase in adjusted gross margin was primarily related to Florida's GUARD program and FPU Electric's SPP. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.

Current wording

Regulated infrastructure programs generated incremental adjusted gross margin of $13.8 million for the year ended December 31, 2025. The increase in adjusted gross margin was primarily related to FCG's SAFE program, Florida's GUARD

Previous wording

Interim rates associated with the Delaware natural gas rate case and Florida Electric base rate case contributed additional adjusted gross margin of $0.9 million for the year ended December 31, 2024. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.

Current wording

Rate changes associated with the Delaware and Maryland natural gas rate cases and Florida Electric base rate case contributed additional adjusted gross margin of $12.6 million for the year ended December 31, 2025. Refer to Note 17, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.

Previous wording

We generated additional adjusted gross margin of $5.8 million from natural gas customer growth. Adjusted gross margin increased by $3.7 million for our Florida Natural Gas distribution business and $2.1 million on the Delmarva Peninsula compared to 2023, due primarily to residential customer growth of 3.9 percent and 4.0 percent in Florida and on the Delmarva Peninsula, respectively.

Current wording

We generated additional adjusted gross margin of $7.4 million from natural gas customer growth. Adjusted gross margin increased by $5.6 million for our Florida natural gas distribution businesses and $1.8 million on the Delmarva Peninsula compared to 2024, due primarily to residential customer growth of 2.8 percent and 4.1 percent in Florida and on the Delmarva Peninsula, respectively.

Previous wording

Operating income for the Unregulated Energy segment for 2024 increased by $7.3 million or 29.9 percent compared to 2023. Adjusted gross margin in the Unregulated Energy segment increased primarily due to increased levels of virtual pipeline services, increased propane consumption including the impact of the December 2023 acquisition, and increased gathering fees and rate changes at Aspire. These increases were partially offset by reduced customer consumption at Aspire primarily from agricultural customers and reduced propane margins and service fees. The increase in operating expenses included higher vehicle expenses and insurance costs which were largely offset by lower payroll, benefits and other employee-related expenses compared to the prior year.

Current wording

Operating income for the Unregulated Energy segment for 2025 increased by $1.9 million or 6.0 percent compared to 2024. Adjusted gross margin in the Unregulated Energy segment increased primarily due to increased levels of virtual pipeline services and increased customer consumption in our propane operations and at Aspire. These increases were partially offset by a change in propane margin and service fees. The increase in operating expenses included higher payroll, benefits and other employee-related expenses, increased facilities, maintenance and outside services costs, and higher depreciation and vehicle expenses compared to the prior year.

Previous wording

•Increased propane customer consumption - Adjusted gross margin was positively impacted by $1.8 million as a result of increased customer consumption driven by colder weather experienced in our Mid-Atlantic and North Carolina service areas during the fourth quarter of 2024.

Current wording

•Increased propane customer consumption - Adjusted gross margin was positively impacted by $4.5 million as a result of increased customer consumption driven by colder weather experienced in our Mid-Atlantic and North Carolina service areas during the fourth quarter of 2025.

Showing the first 40 of 70 pairs. Open the source sections for the rest.

Rearranged current paragraphs (6)

Current report — wording carried from elsewhere

Chesapeake Utilities Corporation 2025 Form 10-K Page 29 measures in assessing a business unit's and the overall Company performance. Other companies may calculate these non-GAAP financial measures in a different manner.

Current report — wording carried from elsewhere

Central Florida Reinforcement Projects (Plant City and Lake Mattie)

Current report — wording carried from elsewhere

In February 2025, FCG filed a depreciation study with the Florida PSC. The application requested approval of revised annual depreciation rates, as well as a reduction related to a reserve imbalance that would be amortized over a two-year period. The outcome of the application was subject to review and approval by the Florida PSC. In February 2026, the Florida PSC approved a $6.8 million reserve imbalance to be amortized over the remaining life of the assets, with the revised depreciation rates effective as of January 1, 2025.

Current report — wording carried from elsewhere

(4) Operating results for FCG are included from the acquisition date (November 30, 2023).

Current report — wording carried from elsewhere

(2) See Item 8, Financial Statements and Supplementary Data, Note 2, Summary of Significant Accounting Policies, for additional information.

Current report — wording carried from elsewhere

Chesapeake Utilities Corporation 2025 Form 10-K Page 53 other pertinent factors, including the expected lives of the plans and the availability of the lump-sum payment option. A 25 basis point increase or decrease in the discount rate would not have a material impact on our pension and postretirement liabilities and related costs.
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

measures of adjusted net income and adjusted EPS. See reconciliations above for a detailed comparison to the related GAAP measures.

Previous report — wording carried elsewhere

Chesapeake Utilities Corporation 2024 Form 10-K Page 37 will support FCG's distribution system in Brevard County, Indian River County, and Miami-Dade County. Benefits of these projects include increased gas supply to serve expected FCG growth, strengthened system reliability and additional system flexibility. The Florida PSC approved the petition in July 2024 with the projects estimated to be completed in the first half of 2025. These three renewable projects are projected to generate total adjusted gross margin of approximately $5.7 million in 2025 and $6.7 million thereafter.

Previous report — wording carried elsewhere

January 1, 2023. The approved depreciation rates resulted in an annual reduction in depreciation expense of approximately $1.2 million.

Previous report — wording carried elsewhere

Chesapeake Utilities Corporation 2024 Form 10-K Page 51

Previous report — wording carried elsewhere