View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Feb 25, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-03-03.
0001820721-25-000023
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2025-12-31; filed 2026-02-25.
0001820721-26-000008
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 145 previous paragraphs and 176 current paragraphs.
65 unchanged; 57 reworded; 51 added; 22 removed; 1 previous and 3 current paragraphs rearranged.
Tables are not compared: 4 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (51)
Current report
With the APA Acquisition in August 2025, we added a portfolio of fixed-tilt and foundation solutions, including the APA Titan and APA Titan Duo™ racking systems and the APA A-Frame™ Interface foundation. These products deliver adaptable designs for utility-scale projects, offering flexibility for challenging terrain, high snow loads, and large-format modules while streamlining installation and reducing material costs.
Current report
Acquisition of APA Solar
Current report
On the Closing Date, our wholly owned subsidiary STINorland USA, Inc., a California corporation, the Buyer, completed the APA Acquisition, pursuant to the terms of the Purchase Agreement. The cash paid as of the Closing Date was $159.9 million, net of $10.1 million in preliminary and customary purchase price adjustments, which includes $6.2 million to retire debt. For U.S. GAAP purposes, the aggregate cash consideration paid was approximately $166.1 million, subject to final post-closing adjustment. We expect to finalize customary post-closing adjustments by June 2026. The Purchase Agreement also includes an earnout provision estimated to have a fair value of approximately $19.3 million as of the Closing Date (the “Earnout Consideration”), which is included in the purchase consideration, under which the Seller may receive shares of Company common stock, or equivalent cash value at the Buyer’s discretion, based upon APA’s achievement of certain financial performance targets during the three-year period ending on September 30, 2028. As a result, the purchase consideration for the APA Acquisition totaled approximately $185.4 million. Subject to the terms and conditions set forth in the Purchase Agreement, the Company has also agreed to pay aggregate deferred consideration of approximately $40.0 million payable in three installments over a two-year period based on service within five business days after the first and second anniversaries from the Closing Date and as set forth in Note 3 - Acquisition (the “Deferred Consideration”). For further discussion of the Earnout Consideration and Deferred Consideration, see “—APA Acquisition Earnout Consideration and Deferred Consideration” below.
Current report
The amounts recorded as of December 31, 2025 are preliminary, as the Company is finalizing working capital, post-closing, and other customary adjustments. These preliminary estimates are subject to change within the measurement period (defined as the twelve months following the Closing Date) and related accounting adjustments may be materially different, as the Company obtains additional information on these matters and as additional information is made known during the post-acquisition measurement period. As a result of further refining its estimates and assumptions since the date of the acquisition, the Company recorded measurement period adjustments to the initial opening balance sheet. There were no measurement period adjustments materially impacting earnings that would have been recorded in previous reporting periods if the adjustments had been recognized as of the acquisition date.
Current report
In connection with the APA Acquisition, the Company has lease agreements for offices, manufacturing facilities and warehouses located in Ohio and Connecticut. Of these lease agreements, five are with related parties owned by certain members of APA's management team.
Current report
Expenses related to these operating lease agreements are allocated based on usage to Cost of product and service revenue or General and administrative expenses in the consolidated statements of operations. Total costs related to these operating lease agreements were $1.2 million for the year ended December 31, 2025.
Current report
APA designs, engineers, and manufactures solar racking, mounting and foundation systems. Integrating such systems into our business model through the acquisition of APA expands our product portfolio to better serve the evolving needs of the solar industry and our customers.
Current report
2.875% Convertible Senior Notes due 2031
Current report
On June 27, 2025, we completed a private placement of $345 million in aggregate principal amount of the 2031 Convertible Notes, resulting in net proceeds of $334.6 million after deducting initial purchasers’ discounts and offering expenses. The 2031 Convertible Notes were issued pursuant to an indenture, dated June 27, 2025, between the Company and U.S. Bank Trust Company, National Association, as trustee.
Current report
The 2031 Convertible Notes are senior unsecured obligations of the Company and will mature on July 1, 2031, unless earlier converted redeemed or repurchased. Interest is payable semiannually in arrears at a rate of 2.875% per year on January 1 and July 1 of each year, beginning on January 1, 2026.
Current report
•The U.S. interest rate environment. We have had customers delay planned installations or look to renegotiate power purchase agreements (“PPAs”) to improve project returns based on various rate environments. For example, in anticipation of interest rate reductions and more favorable project financing conditions later in 2024, some customers delayed installations. While the Federal Reserve began lowering interest rates in the second half of 2024, the timing and impact of subsequent rate adjustments during 2025 continued to create additional considerations for our customers, and there are varying outlooks on whether additional rate cuts may occur. Customers must weigh this uncertainty in conjunction with other macroeconomic factors when assessing the returns and timing for relevant projects.
Current report
It is uncertain what impact new or existing tariffs, trade restrictions or retaliatory actions may have on us, the solar industry and our customers. An escalation in trade tensions or the implementation of broader tariffs, trade restrictions or retaliatory measures on our products or components originating from countries outside the U.S. could adversely impact our ability to source necessary components, manufacture products at competitive cost, or sell our products at prices customers are willing to pay. Any such developments could materially and adversely affect our business operations, results of operations and cash flows.
Current report
Impact of OBBB
Current report
On July 7, 2025, President Trump issued an executive order instructing Treasury to issue updated guidance, including on commencement of construction, within 45 days. On August 15, 2025, Treasury and the IRS issued Notice 2025-42 consistent with the executive order, which eliminates the 5% safe harbor for utility-scale solar projects and only allows the physical work test to determine when a project begins construction. If solar developers are unable to satisfy the physical work test, our business, financial condition, and results of operations could be adversely affected.
Current report
The Company expects certain tax provisions of the OBBB, including the reinstatement of 100% bonus depreciation for qualified property and the immediate expensing of U.S.-based R&D activities, to reduce our 2025 taxable income. These accelerated deductions are expected to lower current‑year cash taxes and improve near-term operating cash flows. The favorable impact primarily represents a timing difference. As assets subject to bonus depreciation become fully depreciated and as expensed R&D activities normalize, we expect cash taxes to increase in future periods. The Company continues to evaluate additional guidance expected to be issued by Treasury related to the OBBB.
Current report
The OBBB did not modify the phase-out of the section 45X credit or the definitions of eligible components relating to solar trackers; however, the OBBB did impose foreign entity of concern limitations on taxpayers claiming the section 45X credit. Specifically, taxpayers cannot claim the credit in taxable years beginning after enactment of the OBBB if they are prohibited foreign entities (which are generally entities that are formed in or controlled by covered nations, including China, Russia, Iran, and North Korea, as well as entities determined to be under effective control as a result of contracts entered into with such entities). The credit is also disallowed in taxable years beginning after enactment of the OBBB for eligible components that receive material assistance from a prohibited foreign entity. On February 13, 2026, Treasury guidance was released that further clarified methods for calculating material assistance and included a request for comments by March 30. We anticipate forthcoming Treasury proposed rule will further clarify the potential impact of the foreign entity of concern limitations may have for credits claimed in 2026 and future years.
Current report
The OBBB increased the domestic content threshold for solar facilities that begin construction after June 16, 2025 to claim the domestic content bonus credit, however, the OBBB did not otherwise amend the requirements for claiming a domestic content bonus credit or the guidance previously issued by the government. As domestic content guidance is not a final rule, it could be further modified by the Trump Administration.
Current report
Impact of the Ongoing Russia-Ukraine War
Current report
Additionally, in October 2023, a coalition of U.S. aluminum extruders and a labor union filed AD/CVD cases on
Current report
aluminum extrusions from fifteen countries. The USDOC has initiated investigations based on the petitions. Certain components in our trackers, including certain clamps, U-joints, and bearing housings are made using extruded aluminum. In September 2024, the USDOC released its final determination from their investigations against aluminum extrusions from multiple countries. On October 30, 2024, USITC voted to find no injury in its pending AD/CVD investigation, meaning that the USDOC’s AD/CVD orders will not go into effect. The coalition of petitioners may still appeal the USITC’s decision, and we will continue to monitor developments in the appeal process. If the USITC’s decision is overturned on appeal, the imposition of AD/CVD orders could
Current report
negatively impact our business, financial condition, and results of operations.
Current report
On April 24, 2024, the American Alliance for Solar Manufacturing Trade Committee, an ad hoc coalition of domestic producers of CSPV cells and modules, filed a petition with the USDOC and the USITC seeking the imposition of AD/CVD tariffs on imports of CSPV cells and modules from Cambodia, Malaysia, Thailand and Vietnam. On May 20, 2025, the USITC made a final determination that U.S. industry had been materially injured by imports of CSPV cells, whether or not assembled into modules, from Malaysia and Vietnam and threatened with material injury by such imports from Cambodia and Thailand. On June 24, 2025, the USDOC issued AD/CVD orders that took effect on June 24, 2025. The rates under the AD/CVD orders vary from below 1% to more than 3,400%, depending on the relevant company.
Current report
On July 17, 2025, the Alliance for American Solar Manufacturing and Trade, a coalition of U.S.-based solar manufacturers, filed a petition with the USDOC and USITC seeking the imposition of AD/CVD tariffs on imports of CSPV cells and modules from India, Indonesia, and Laos. The petition alleges dumping margins of 213.96% for India, 89.65% for Indonesia, and 245.79% to 249.09% for Laos. The final determinations by the USDOC are expected sometime in the summer of 2026.
Current report
On April 2, 2025, President Trump introduced a baseline reciprocal tariff rate of 10% on most countries and individualized rates on some countries of up to 50%. On April 9, 2025, President Trump increased tariffs for Chinese goods to 125% (making the tariff rate for certain products up to 145% due to the “stacking” nature of the relevant tariffs), while also issuing an executive order that the reciprocal tariffs that had been announced on April 2, 2025 for other countries would be reduced to a baseline rate of 10% for a period of 90 days starting on April 10, 2025. On July 7, 2025, President Trump extended the initial 90-day pause on the reciprocal tariffs (except for those relating to China) and maintained the 10% baseline rate until August 1, 2025. On July 31, 2025, President Trump announced via an executive order reciprocal tariffs above the 10% baseline rate for a number of countries; these rates became effective as of August 7, 2025. In November 2025, the Supreme Court heard arguments in a case challenging tariffs imposed under the IEEPA. In February 2026, the Supreme Court issued a ruling that IEEPA does not authorize the imposition of tariffs. Although the ruling has been issued, its implications for trade policy and related administrative actions remain uncertain. The Company is reviewing the decision and will evaluate its potential impact, including with respect to any potential refunds, as further information becomes available.
Current report
President Trump also launched a new Section 301 investigation into Brazil’s alleged unreasonable or discriminatory trade practices; initiated a new Section 232 investigation into imports of polysilicon and its derivatives and a new Section 232 investigation into imports of unmanned aircraft systems and their parts and components, among other Section 232 investigations; and announced a 50% tariff on imports of copper following the conclusion of a Section 232 investigation, effective August 1, 2025.
Current report
Our customer base consists primarily of solar developers, independent power producers, utilities and EPCs. We do not require collateral on our accounts receivable.
Current report
Revenue from Array Legacy Operations, inclusive of contributions from APA, increased by $408.8 million, or 62%, for the year ended December 31, 2025 compared to the year ended December 31, 2024, primarily driven by an increase of approximately 62% in volume.
Current report
Consolidated cost of revenue increased by $367.5 million, or 59%, for the year ended December 31, 2025 compared to the year ended December 31, 2024, in line with higher volume.
Current report
Array Legacy Operations gross profit, inclusive of contributions from APA, increased by $30.0 million, or 11%, for the year ended December 31, 2025 compared to the year ended December 31, 2024. Gross margin decreased to 28% from 41% for the years ended December 31, 2025 and 2024, respectively. The decrease in gross margin was driven by a 22% increase in CPW, attributable to 13% higher tariffs, 6% from reduction in 45x amortization, and 3% from inflationary cost pressures. In addition, gross margin during the year ended December 31, 2024, included a one-time benefit of $4.0 million related to a settlement with a supplier, which was recorded as a reduction to Cost of product and service revenue.
Current report
Consolidated general and administrative expenses, inclusive of APA, increased by $38.0 million, or 24%, for the year ended December 31, 2025 compared to the year ended December 31, 2024. The increase was primarily due to a $17.7 million increase in total compensation costs during the year ended December 31, 2025, the absence of $3.0 million in favorable one-time variable compensation adjustments recorded during the year ended December 31, 2024, $16.9 million in acquisition-related expenses and deferred compensation, and a $0.4 million increase in other costs.
Current report
Consolidated depreciation and amortization expense, inclusive of APA, for the year ended December 31, 2025 decreased $9.9 million, or 27%, primarily due to certain assets acquired becoming fully amortized or fully impaired at December 31, 2024, partially offset by $3.5 million of incremental depreciation and amortization related to fixed and intangible assets acquired in the APA Acquisition.
Current report
Foreign Currency (Gain) Loss
Current report
Consolidated interest expense for the year ended December 31, 2025 decreased by $7.5 million, or 22%, compared to the year ended December 31, 2024, primarily due to refinancing with lower interest debt and changes in interest rates on our variable rate obligations.
Current report
Consolidated income tax expense for the year ended December 31, 2025 increased by $33.2 million, or 326%, compared to the year ended December 31, 2024, shifting from an income tax benefit of $10.2 million in 2024 to income tax expense of $23.0 million in 2025. The increase in tax expense was primarily due to a decrease in our pre-tax loss, as we recorded a pre-tax loss of $29.2 million in 2025, compared to a pre-tax loss of $250.6 million in 2024.
Current report
An impairment charge of $102.6 million in 2025 for goodwill was reversed for tax purposes resulting in positive taxable income. The impairment reversal resulted in additional tax expense of approximately $22.3 million. A $10.2 million valuation allowance related to the inventory valuation charge and debt restructuring charge was accrued for Brazil. The APA acquisition added new state tax filing requirements and increased the Company’s apportioned income in existing states. Other book-tax basis differences attributed to the increased tax expense as well.
Current report
Senior Secured Credit Facility
Current report
On October 14, 2020, the Company entered into a credit agreement (as amended, the “Credit Agreement”) governing the Company’s senior secured credit facility, consisting of: (i) a $575 million senior secured seven-year term loan facility (the “Term Loan Facility”); and (ii) a $200 million senior secured five-year revolving credit facility (the “Revolving Credit Facility” and, together with the Term Loan Facility, the “Senior Secured Credit Facility”). The Credit Agreement was amended on February 23, 2021, February 26, 2021, March 2, 2023, and May 1, 2025 (the “Fourth Amendment”). The Fourth Amendment, among other things: (y) refinanced the Revolving Credit Facility with new revolving commitments and loans thereunder, reducing the total commitments to $166 million and extending the maturity date to October 14, 2028; and (z) revised the Consolidated First Lien Secured Leverage Ratio as applicable under Section 7.09 (Financial Covenant) of the Credit Agreement from 7.10:1.00 to 5.50:1.00.
Current report
On February 18, 2026, Array Tech, Inc. (f/k/a Array Technologies, Inc.) (the “Borrower”), a New Mexico corporation and wholly-owned subsidiary of the Company, entered into that certain Amendment No. 5 to Credit Agreement (the “Fifth Amendment”), by and among the Borrower, the Company’s wholly-owned subsidiary ATI Investment Sub, Inc., as holdings (“Holdings”), Goldman Sachs Bank USA, as administrative agent and collateral agent (“Goldman Sachs”), and the Lenders (as defined in the Fifth Amendment), to the Credit Agreement. The Fifth Amendment: (i) increases the revolving credit facility commitments under the original Credit Agreement from $166,000,000 to $370,000,000; (ii) extends the maturity of the revolving credit facility from October 14, 2028 to February 18, 2031; (iii) removes the credit spread adjustment with respect to Term SOFR (as defined in the Credit Agreement); and (iv) expands the number of currencies under which the Borrower can request revolving credit loans and letters of credit.
Current report
As amended by the Fourth Amendment, the Revolving Credit Facility had total commitments of $166.0 million at December 31, 2025 and a maturity date of October 14, 2028.
Current report
On June 27, 2025, we completed a private placement of $345 million in aggregate principal amount of 2031 Convertible Notes, resulting in net proceeds of $334.6 million, after deducting initial purchasers’ discounts and offering expenses. The proceeds were used to repay in full our Term Loan Facility and to repurchase $100.0 million aggregate principal amount of the 2028 Convertible Notes. The repurchased 2028 Convertible Notes had a net carrying value of $98.5 million, inclusive of unamortized debt discount, resulting in a gain on extinguishment of debt of approximately $20.1 million.
Showing the first 40 of 51 passages. Open the source sections for the rest.
Removed paragraphs (22)
Previous report
Acquisition of STI Norland
Previous report
On January 11, 2022, we completed our acquisition of STI, which resulted in the Company owning 100% of the equity interests in STI.
Previous report
Similar to Array Legacy Operations, the STI Operations generate revenue through the design, manufacture and sale of utility-scale solar tracker systems to customers in global markets that include Spain, Brazil, the U.S. and South Africa. The integration of STI has allowed us to accelerate our international expansion and better address rising global demand for utility-scale solar projects, particularly in developing countries in Latin America and Africa.
Previous report
•The interest rate environment. As interest rates rose in 2022 and 2023, we saw customers looking to renegotiate power purchase agreements to improve project returns. Any unexpected or protracted negotiation can cause installation delays and delay our ability to recognize revenue relating to the relevant projects. In addition, we had customers delay planned installations in anticipation of interest reductions and more favorable project financing conditions later in 2024. While the Federal Reserve made the decision to lower the target interest rate by 0.5% in October 2024 the timing of any positive impact the lower rate may have on project timing remains uncertain, particularly in light of the Federal Reserve’s decision not to lower the target interest rate further in January 2025.
Previous report
Impact of IRA
Previous report
Impact of the Ongoing Russian-Ukraine War
Previous report
STI Operations revenue for the year ended December 31, 2024 decreased by $149.5 million, or 37%, compared to the year ended December 31, 2023. The decrease was primarily driven by a decrease of 12% in volume shipped, a decrease of approximately 24% in average selling prices and a foreign currency impact of approximately 4%.
Previous report
Consolidated cost of revenue decreased by $542.9 million, or 47%, for the year ended December 31, 2024 compared to the year ended December 31, 2023, in line with lower revenue, partially offset by lower input cost per watt, resulting from supply chain and engineering cost control initiatives and the realization of 45X benefits associated with torque tubes and structural fasteners by Legacy Array Operations. 45X benefits realized for the year ended December 31, 2024 were $137.8 million compared to $9.3 million for the year ended December 31, 2023.
Previous report
Array Legacy Operations gross profit decreased by $47.6 million, or 15%, for the year ended December 31, 2024 compared to the year ended December 31, 2023. Gross margin increased to 41% from 27% for the years ended December 31, 2024 and 2023, respectively. The increase in gross margin was driven the realization of 45X benefits associated with torque tubes and structural fasteners during the fiscal year. 45X benefits realized for the year ended December 31, 2024 were $137.8 million compared to $9.3 million for the year ended December 31, 2023.
Previous report
Consolidated general and administrative expense for the year ended December 31, 2024 increased by $1.0 million compared to the same period in the prior year, primarily as a result of higher legal and professional fees of $6.3 million and an increase in facility and infrastructure costs of $0.9 million, partially offset by lower personnel expenses of $6.2 million as a result of lower stock-based compensation and headcount.
Previous report
Consolidated depreciation and amortization expense decreased $2.8 million, or 7%, due to the decrease in the amortization of intangibles, as the Backlog intangible recognized as part of the STI Acquisition had a one-year life and was fully amortized as of the first quarter of 2023.
Previous report
Legal Settlement
Previous report
Legal settlement income in 2022 resulted from the settlement of litigation related to trade secret misappropriation, for which we received a $42.8 million settlement. The settlement is related to Nextracker’s acknowledgment that an Array employee was hired in violation of his non-compete agreement, certain Array confidential information was improperly obtained, and Nextracker’s behavior was wrongful. The parties concluded the matter and plan to continue their shared missions of mainstreaming clean energy worldwide. As part of the settlement, the parties agreed to treat the settlement terms as confidential except to the extent required or necessitated by law, regulation, or the corporate parties’ shareholder disclosure standards.
Previous report
Foreign Currency Loss
Previous report
Consolidated interest expense for the year ended December 31, 2024 decreased by $9.4 million, or 21%, compared to the prior year period, primarily due to the impact of the $4.3 million and $74.3 million principal pay downs on our Term Loan Facility during 2024 and 2023, respectively. These pay downs were the result of focused efforts to decrease our outstanding debt balance with free cash flows from operations.
Previous report
Consolidated income tax expense (benefit) decreased by $50.1 million, or (126)%, We recorded income tax benefit of $10.2 million and an expense of $39.9 million for the years ended December 31, 2024 and 2023, respectively. The decrease in the tax expense is mostly related to the decrease in pre-tax income, which includes an impairment charge of $91.9 million for acquired intangibles and PP&E. The impairment resulted in a benefit of $31.2 million, offset by a valuation allowance against deferred tax assets of $7.2 million. In addition, the income tax expense for the year ended December 31, 2024, was favorably impacted by losses in non-U.S. jurisdictions which have higher tax rates than the U.S., additional tax credits, and reduced state income tax expense, partially offset by benefits related to excess equity-based compensation deductions and non-deductible expense. The tax expense for the year ended December 31, 2023, was favorably impacted by losses in non-U.S. jurisdictions which have higher tax rates than the U.S. and benefit from a non-US tax incentive, partially offset by non-deductible expenses.
Previous report
For the year ended December 31, 2024, net cash used in financing activities was $11.8 million, driven by a $4.4 million net reduction of other debt and a $4.3 million payments on our Term Loan Facility, as well as $1.4 million in TRA payments issued during the year ended December 31, 2024.
Previous report
Contractual Obligations and Commitments
Previous report
The following table summarizes our commitments to settle contractual obligations as of December 31, 2024 (in thousands):
Previous report
(1) Represents commitments under our non-cancelable office and facility leases. The lease for our new facility in Albuquerque, New Mexico, is currently expected to commence during the fourth quarter of 2025. For further information see Note 19 – Leases. Future minimum lease payments for this facility for the initial term of the lease and the one term consecutive extension of the lease for an additional ten years are approximately $105.0 million, which have been excluded from the table above.
Previous report
(2) Purchase obligations primarily relate to commitments with certain suppliers under firm purchase orders or supply agreements to purchase raw materials or parts.
Previous report
(3) Other obligations represent a commitment of the Company to invest an additional $2.0 million in future SAFEs with a technology company upon the achievement of defined milestones.
Reworded paragraphs (57)
Previous wording
This Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with our financial statements and the related notes and other financial information included in this Annual Report on Form 10-K. In addition to historical financial information, the following discussion and analysis contains forward-looking statements that involve risks, uncertainties and assumptions. Our actual results and timing of selected events may differ materially from those anticipated in these forward-looking statements as a result of many factors, including those discussed under the sections of this Form 10-K captioned “Forward-Looking Statements” and “Risk Factors.”
Current wording
This Management’s Discussion and Analysis of Financial Condition and Results of Operations should be read in conjunction with our financial statements and the related notes and other financial information included in this Annual Report on Form 10-K. In addition to historical financial information, the following discussion and analysis contains forward-looking statements that involve risks, uncertainties and assumptions. Our actual results and timing of selected events may differ materially from those anticipated in these forward-looking statements as a result of many factors, including those discussed under the sections of this Annual Report on Form 10-K captioned “Forward-Looking Statements” and “Risk Factors.”
Previous wording
We are a leading global provider of solar tracking technology to utility-scale and distributed generation customers, who construct, develop and operate solar PV sites. With solutions engineered to withstand the harshest weather conditions, ARRAY’s high-quality solar trackers, software platforms and field services combine to maximize energy production and deliver value to our customers for the entire lifecycle of a project.
Current wording
We are a leading global provider of solar tracking technology and fixed-tilt systems to utility-scale and distributed generation customers who construct, develop, and operate solar PV sites. With solutions engineered to withstand harsh weather conditions, Array’s high-quality solar trackers, fixed-tilt systems, software platforms, foundation solutions, and field services combine to optimize energy production and deliver value to our customers for the entire lifecycle of a project.
Previous wording
Trackers move solar panels throughout the day to maintain an optimal orientation to the sun, which significantly increases their energy production. Solar energy projects that use trackers typically generate more energy and deliver a lower LCOE than projects that use “fixed tilt” mounting systems, which do not move. The vast majority of ground mounted solar systems in the U.S. use trackers.
Current wording
Trackers move solar panels throughout the day to maintain an optimal orientation to the sun, which significantly increases energy production. Solar energy projects that use trackers typically generate more energy and deliver a lower LCOE than projects that use “fixed tilt” mounting systems, which do not move. Hybrid sites utilizing trackers and fixed-tilt can be utilized to optimize productivity based on the topography, geography, and environment. The vast majority of ground mounted solar systems in the U.S. use trackers.
Previous wording
Our flagship tracker uses a patented design that allows one motor to drive multiple rows of solar panels through articulated driveline joints. To avoid infringing on our U.S. patent, our competitors must use designs that we believe are inherently less efficient and reliable. For example, our largest competitor’s design requires one motor for each row of solar panels. As a result, we believe our products have greater reliability, lower installation costs, reduced maintenance requirements and competitive manufacturing costs. Our core U.S. patent is on a linked-row, single-driving apparatus that rotates a plurality of tracker rows connected by an articulating drive shaft. This patent does not expire until February 5, 2030.
Current wording
Our flagship tracker, DuraTrack®, uses a patented design that allows one motor to drive multiple rows of solar panels through articulated driveline joints. To avoid infringing on our U.S. patent, our competitors must use designs that we believe are inherently less efficient and reliable. For example, our largest competitor’s design requires one motor for each row of solar panels. As a result, we believe our products have greater reliability, lower installation costs, reduced maintenance requirements and competitive manufacturing costs. Our core U.S. patent is on a linked-row, single-driving apparatus that rotates multiple tracker rows connected by an articulating drive shaft. This patent does not expire until February 5, 2030.
Previous wording
With our acquisition of STI in January 2022, we added a dual-row tracker design to our product portfolio. This tracker uses one motor to drive two connected rows and is ideally suited for sites with irregular and highly angled boundaries or fragmented project areas. To offer a comprehensive set of solutions to the growing market, in September of 2022, we also introduced a third tracker product, OmniTrack, which requires significantly less grading and civil works permitting prior to installation in addition to accommodating uneven terrain. This suite of products extends our target applications and ability to deliver the best utility-scale solar tracker solutions to the market.
Current wording
With our acquisition of STI in January 2022, we added a dual-row tracker design to our product portfolio, the Array STI H250. This tracker uses one motor to drive two connected rows and is ideally suited for sites with irregular and highly angled boundaries or fragmented project areas.
Previous wording
We sell our products to EPCs that build solar energy projects and to large solar developers, independent power producers and utilities, often under master supply agreements or multi-year procurement contracts. During the year ended December 31, 2024, we derived 70% and 30% of our revenues from customers in the U.S. and the rest of the world, respectively. As of December 31, 2024, we had shipped approximately 83 gigawatts of trackers to customers worldwide.
Current wording
We sell our products to solar developers, independent power producers, utilities, and EPCs that build solar energy projects, often under master supply agreements or multi-year procurement contracts. During the year ended December 31, 2025, we derived 81% and 19% of our revenues from customers in the U.S. and the rest of the world, respectively. From the founding of Array through December 31, 2025, we had shipped approximately 96 gigawatts of trackers to customers worldwide.
Previous wording
We incur R&D costs during the process of researching and developing new products and significant enhancements to existing products. R&D costs are a subset of our total engineering spend and consist primarily of personnel-related costs associated with our team of internal engineers, third-party consultants, materials and overhead. We expense these costs as incurred prior to a respective product being ready for commercial production. Total engineering expense was $17.0 million, $16.7 million and $11.8 million during the years ended December 31, 2024, 2023 and 2022, respectively, of which $6.7 million, $8.5 million and $4.2 million were related to R&D activities we performed during the same period, respectively.
Current wording
R&D costs are included within General and administrative expenses in the accompanying consolidated statements of operations. We incur R&D costs during the process of researching and developing new products and significant enhancements to existing products. R&D costs are a subset of our total engineering spend and consist primarily of personnel-related costs associated with our team of internal engineers, third-party consultants, materials and overhead. We expense these costs as incurred. Total engineering expense was $18.7 million, $17.0 million and $16.7 million during the years ended December 31, 2025, 2024 and 2023, respectively, of which $9.9 million, $6.7 million and $8.5 million were related to R&D activities we performed during the same period, respectively.
Previous wording
•Availability of necessary equipment. We have a broad portfolio of customer relationships including presence with most Tier 1 utilities in the U.S. Each utility has unique specifications for access to its grid, which is generally not consistent across the industry. As the supply of renewables projects has increased, severe shortages and long lead-times in the supply of switches, transformers and high-voltage breakers used in the interconnection of utility scale solar power plants to the grid, has affected the timing and completion of these projects, including for some of our customers.
Current wording
•Availability of necessary equipment. We have a broad portfolio of customer relationships including presence with most Tier 1 utilities in the U.S. Each utility has unique specifications for access to its grid, which are generally not consistent across the industry. As the supply of renewables projects has increased, shortages and long lead-times in the supply of switches, transformers and high-voltage breakers used in the interconnection of utility scale solar power plants to the grid, has historically affected the timing and completion of these projects, including for some of our customers.
Previous wording
•Macroeconomic factors. There has been a rapid depreciation of the Brazilian Real in conjunction with existing pricing pressures on energy in the Brazilian market. Due to these dynamics, the economic cases for the power purchase agreements, or PPAs, for many solar projects have become less attractive for our customers. Many of the developers in Brazil of these projects are continuing signaling delays as they renegotiate the pricing of these PPAs. In addition, our results will also be impacted by tax incentives we can recognize, for example the Brazil value-added tax benefit, Imposto sobre Circulação de Mercadorias e Servicos (“ICMS”), which will discontinue in 2033.
Current wording
•Macroeconomic factors. There has been a rapid depreciation of the Brazilian real in conjunction with existing pricing pressures on energy in the Brazilian market. Due to these dynamics, the economic cases for the PPAs, for many solar projects have become less attractive for our customers. Many of the developers in Brazil of these projects continue to signal delays as they renegotiate the pricing of these PPAs. In addition, our results will also be impacted by tax incentives we can recognize, for example the Brazil value-added tax benefit, Imposto sobre Circulação de Mercadorias e Servicos (“ICMS”), which will be fully phased out in 2033. As a result, we are focused on reducing costs and better aligning our organization, including the size thereof, in Brazil with the current market conditions.
Previous wording
While solar power is cost-competitive with conventional forms of generation in many U.S. states even without the ITC, we believe step-downs in the ITC have influenced the timing and quantity of some customers’ orders. With the passage of the IRA in August 2022, the ITC was raised to 30% with no step downs before 2032. Accordingly, we do not anticipate the ITC rate to impact our seasonality during that timeframe.
Current wording
While solar power is cost-competitive with conventional forms of generation in many U.S. states even without the ITC, we believe previous step-downs in the ITC in past years have influenced the timing and quantity of some customers’ orders. On July 4, 2025, President Trump signed into law the OBBB, which included changes to the energy tax credits. Specifically, the solar ITC now terminates for facilities that are placed in service after December 31, 2027, but that termination does not apply if the taxpayer begins construction on the facility before July 4, 2026. In addition, the OBBB imposes new foreign entity of concern limitations on the ITC before it expires, which could impact the ability of solar facilities to claim the ITC. Specifically, taxpayers cannot claim the credit in taxable years beginning after enactment of the OBBB if they are prohibited foreign entities (which are generally entities that are formed in or controlled by covered nations, including China, Russia, Iran, and North Korea, as well as entities determined to be under effective control as a result of contracts entered into with such entities). The credit is also disallowed for solar facilities that begin construction after December 31, 2025 that receive material assistance from a prohibited foreign entity. On February 13, 2026, Treasury guidance was released clarifying methods for calculating material assistance from a prohibited foreign entity and requesting comments.
Previous wording
After a period of uncertainty, on October 24, 2024, U.S. Department of Treasury and the IRS issued final regulations on the section 45X manufacturing tax credit that largely adopted the statutory definitions of torque tube and structural fasteners, which we have determined apply to our components. Beginning in late 2023 and continuing through 2024 and into 2025, we have successfully negotiated, and we continue to successfully negotiate, agreements with key suppliers around sharing the economic benefits of section 45X credits associated with torque tube and structural fasteners. We continue to pursue additional agreements for splitting the economic benefits of section 45X with suppliers for parts we do not manufacture internally. In addition, during the second quarter of 2024, we concluded that certain parts manufactured by the Company qualify for the section 45X advanced production credits. Refer to Note 2 – Summary of Significant Accounting Policies in the accompanying notes to our consolidated financial statements included in this Annual Report on Form 10-K for a discussion on how we account for these incentives and amounts recognized for the periods presented.
Current wording
The section 45X advanced manufacturing production tax credit was established as part of the IRA. The section 45X credit is a per-unit tax credit that is earned over time for each clean energy component domestically produced and sold by a manufacturer. The section 45X manufacturing production tax credit applies to eligible components, including torque tube and structural fasteners. Beginning in late 2023 and continuing through 2024 and 2025, we have successfully negotiated, and we continue to successfully negotiate, agreements with key suppliers around sharing the economic benefits of section 45X credits associated with torque tube and structural fasteners. We continue to pursue additional agreements for splitting the economic benefits of section 45X with suppliers for parts we do not manufacture internally. In addition, during the second quarter of 2024, we concluded that certain parts manufactured by the Company qualify for the section 45X advanced production credits. Refer to Note 2 – Summary of Significant Accounting Policies in the accompanying notes to our consolidated financial statements included in this Annual Report on Form 10-K for a discussion on how we account for these incentives and amounts recognized for the periods presented.
Previous wording
The IRS issued Notice 2023-38 in May of 2023 setting forth guidance on the domestic content bonus tax credits under the IRA. Uncertainties still exist under this guidance, like whose costs would be used (the manufacturer’s cost, a vendor’s cost to acquire, etc.) and how to define manufactured product components associated with trackers. In May of 2024, the IRS issued Notice 2024-41 setting forth further guidance on the domestic content bonus tax credits, including a safe harbor method for calculating domestic content percentages. On January 16, 2025, the IRS released Notice 2025-08, modifying Notice 2023-38 and Notice 2024-41 as well as introducing an updated elective safe harbor method for use in lieu of provisions of the adjusted percentage rule provided in Notice 2023-38 for calculating the domestic content bonus credit amounts applicable for certain qualified facilities and energy projects. Notice 2024-41 and Notice 2025-08 and the updated definitions described therein have clarified some pre-existing uncertainty in the industry, but they have also introduced uncertainties of their own. These uncertainties have and could continue to cause our customers to delay projects as they navigate the existing guidance in qualifying for the tax credit and possibly wait for further clarity.
Current wording
The IRS issued Notice 2023-38 in May 2023 setting forth guidance on the domestic content bonus tax credits under the IRA. Uncertainties existed under this guidance, like whose costs would be used (the manufacturer’s cost, a vendor’s cost to acquire, etc.) and how to define manufactured product components associated with trackers. In May 2024, the IRS issued Notice 2024-41 setting forth further guidance on the domestic content bonus tax credits, including a safe harbor method for calculating domestic content percentages. On January 16, 2025, the IRS released Notice 2025-08, which modified Notice 2023-38 and Notice 2024-41, as well as introduced an updated elective safe harbor method for use in lieu of provisions of the adjusted percentage rule provided in Notice 2023-38 for calculating the domestic content bonus credit amounts applicable for certain qualified facilities and energy projects. Notice 2024-41 and Notice 2025-08 and the updated definitions described therein clarified certain pre-existing uncertainty in the industry, but also introduced new uncertainties. These uncertainties have and could continue to cause our customers to delay projects as they navigate the existing guidance in qualifying for the tax credit and possibly wait for further clarity. If these financial benefits vary significantly from our assumptions, our business, financial condition, and results of operations could be adversely affected.
Previous wording
The ongoing Russian-Ukraine war has reduced the availability of material that can be sourced in Europe and, as a result, increased logistics costs for the procurement of certain inputs and materials used in our products. We do not know the ultimate severity or duration of the conflict, but we continue to monitor the situation and evaluate our procurement strategy and supply chain as to reduce any negative impact on our business, financial condition, and results of operations.
Current wording
The ongoing Russia-Ukraine war has reduced the availability of material that can be sourced in Europe and, as a result, increased logistics costs for the procurement of certain inputs and materials used in our products. We do not know the ultimate severity or duration of the conflict, but we continue to monitor the situation and evaluate our procurement strategy and supply chain to reduce any negative impact on our business, financial condition, and results of operations.
Previous wording
Impact of Disruption of Key Shipping Lines, i.e. Attacks on Shipping in the Red Sea
Current wording
Impact of Disruption of Key Shipping Lanes
Previous wording
The disruption of container shipping traffic through the Red Sea has created port congestion, especially in Asia, affecting transit times, capacity, and shipping costs for routes connecting the rest of the world with Asia. Many shipping companies have paused shipments through the Suez Canal and the Red Sea causing rerouting of commercial vessels. To address the challenges arising from prolonged transit times, we have increased our local sourcing efforts where feasible within certain regions. These measures aim to reduce delays to get the product to project sites on time. There is still uncertainty on how long these disruptions and the severity of their impact on our operations will last, but we continue to monitor the situation and evaluate our procurement and supply chain strategies, as to reduce any negative impact on our business, financial condition, and results of operations.
Current wording
In the recent past, we have seen disruptions of container shipping traffic through the Red Sea create port congestion, especially in Asia, and cause many shipping companies to pause shipments through the Suez Canal and the Red Sea as a result of attacks against commercial vessels in the area, affecting transit times, capacity, and shipping costs for routes connecting the rest of the world with Asia. To address the persisting challenges arising from prolonged transit times, we have increased our local sourcing efforts where feasible within certain regions. These measures aim to reduce delays to get the product to project sites on time. There is still uncertainty on how long disruptions and the severity of their impact on our operations may last, but we continue to monitor such situations and evaluate our procurement and supply chain strategies, to reduce any negative impact on our business, financial condition, and results of operations.
Previous wording
Inflationary pressure may continue to negatively impact our results of operations in the near-term. To mitigate the inflationary pressures on our business, despite our ASPs decreasing due to the current deflationary environment for commodities like steel, we have continued to accelerate our productivity initiatives, expanded our supplier base, and continued to execute on our overhead cost containment practices.
Current wording
Inflationary pressure may continue to negatively impact our results of operations in the near-term. To mitigate these pressures on our business, and the volatility in steel and aluminum prices, we have continued to accelerate our productivity initiatives, expand our supplier base, and execute on our overhead cost-containment practices.
Previous wording
On August 18, 2023, the U.S. Department of Commerce issued final affirmative determinations of circumvention with respect to certain CSPV cells and modules produced in Cambodia, Malaysia, Thailand and Vietnam using parts and components from China. As a result, certain CSPV cells and modules from Cambodia, Malaysia, Thailand and Vietnam are now subject to AD/CVD orders on CSPV cells and modules from China that have been in place since 2012. Subject to certain certification and utilization conditions, imports of CSPV cells and modules covered by the circumvention determinations that entered the U.S. during the two-year period prior to June 6, 2024 were not subject to AD/CVD cash deposit or duty requirements. Imports of CSPV cells and modules from the four Southeast Asian countries covered by the circumvention determination that entered the U.S. on or after June 6, 2024 are subject to AD/CVD cash deposit requirements of the China AD/CVD orders and, possibly, final AD/CVD duty liability. Cash deposit rates for CSPV modules covered by the China AD/CVD orders vary significantly depending on the producer and exporter of the modules and may amount to over 250% of the entered value of the imported merchandise.
Current wording
On August 18, 2023, the USDOC issued final affirmative determinations of circumvention with respect to certain CSPV cells and modules produced in Cambodia, Malaysia, Thailand and Vietnam using parts and components from China. As a result, certain CSPV cells and modules from Cambodia, Malaysia, Thailand and Vietnam are now subject to AD/CVD orders on CSPV cells and modules from China that have been in place since 2012. Subject to certain certification and utilization conditions, imports of CSPV cells and modules covered by the circumvention determinations that entered the U.S. during the two-year period prior to June 6, 2024—which had been authorized by the former President Biden on June 2022—were not subject to AD/CVD cash deposit or duty requirements. Imports of CSPV cells and modules from the four Southeast Asian countries covered by the circumvention determination that entered the U.S. on or after June 6, 2024 are subject to AD/CVD cash deposit requirements of the China AD/CVD orders and, possibly, final AD/CVD duty liability. Cash deposit rates for CSPV modules covered by the China AD/CVD orders vary significantly depending on the producer and exporter of the modules and may amount to over 250% of the entered value of the imported merchandise.
Previous wording
While we do not sell solar modules, the degree of our exposure is dependent on, among other things, the impact of the AD/CVD orders on the projects that are also intended to use our products, with such impact being largely out of our control. We have seen a number of projects in our order book delayed as a result of the USDOC investigation, and effective enforcement of the AD/CVD orders could negatively impact our results of operations.
Current wording
While we do not sell solar modules, the degree of our exposure is dependent on, among other things, the impact of the AD/CVD orders on the projects that are also intended to use our products, with such impact being largely out of our control. We have seen a number of projects in our order book delayed as a result of the USDOC investigations, and effective enforcement of the AD/CVD orders could negatively impact our results of operations.
Previous wording
On February 1, 2025, the President Trump issued three executive orders directing the U.S. to impose new tariffs on imports from Canada, Mexico, and China, to take effect on February 4, 2025, and on February 3,
Current wording
On February 1, 2025, President Trump issued executive orders directing the U.S. to impose new tariffs on imports from Canada, Mexico, and China, to take effect on February 4, 2025. On February 3, 2025, President Trump announced his intention to pause these tariffs on Canada and Mexico for a 30-day period. The tariffs impose an additional 25%ad valorem rate of duty on all imports from Canada and Mexico (other than imports of Canadian energy resources, which are subject to a 10%ad valorem rate of duty) and an additional 10% ad valorem rate of duty on all imports from China. On March 4, 2025, the previously announced 25% tariff on Canadian and Mexican goods took effect and the tariff on Chinese goods was doubled to 20%. On June 4, 2025 tariffs on steel and aluminum increased from 25% to 50% on all steel and aluminum coming from Canada. Further, on July 31, 2025, President Trump issued an executive order increasing the ad valorem rate on imports from Canada to 35%. President Trump also has threatened a 30% ad valorem rate on imports from Mexico, though those are not currently in effect.
Previous wording
2025, President Trump announced his intention to pause these tariffs on Canada and Mexico for a one-month period. The tariffs impose an additional 25%ad valorem rate of duty on all imports from Canada and Mexico (other than imports of Canadian energy resources exports, which are subject to a 10%ad valorem rate of duty) and an additional 10% ad valorem rate of duty on all imports from China. We are currently evaluating the potential impact of the imposition of the announced tariffs to our business and financial condition. While we do not believe that the tariffs announced by the U.S. on February 1, 2025 will have a material adverse effect upon our results of operations, financial condition, or liquidity, the actual impact of the new tariffs is subject to a number of factors including the effective date and duration of such tariffs, changes in the amount, scope and nature of the tariffs in the future, any countermeasures that the target countries may take and any mitigating actions that may become available.
Current wording
We are continuing to evaluate the potential impact of the imposition of the announced tariffs, the effect of the Supreme Court decision on tariffs described above, and any additional or retaliatory tariffs, to our business and financial condition. While we do not believe that the tariffs announced by the U.S. in 2025 and through the date of filing this Form 10-K in 2026 will have a material adverse effect upon our results of operations, financial condition, or liquidity, the actual impact of new tariffs is subject to a number of factors, including the effective date and duration of such tariffs, changes in the amount, scope and nature of the tariffs in the future, any countermeasures that the target countries may take and any mitigating actions that may become available.
Previous wording
At December 31, 2024, our largest customer and five largest customers accounted for 9.0% and 31.0%, respectively, of total accounts receivable. At December 31, 2023, our largest and five largest customers constituted 2.7% and 29.6% of trade accounts receivable, respectively.
Current wording
At December 31, 2025, our largest customer and five largest customers accounted for 13.4% and 29.8%, respectively, of total accounts receivable. At December 31, 2024, our largest and five largest customers constituted 9.0% and 31.0%, respectively, of total accounts receivable.
Previous wording
During the year ended December 31, 2024, two customers accounted for 15.6% and 11.9%, respectively, of total revenue. During the year ended December 31, 2023, one customer accounted for 13.4% of total revenue. During the year ended December 31, 2022, two customers accounted for 11.8% and 10.6%, respectively, of total revenue.
Current wording
During the year ended December 31, 2025, our two largest customers accounted for approximately 13.7% and 12.2%, respectively, of total revenue. During the year ended December 31, 2024, our two largest customers accounted for approximately 15.6% and 11.9%, respectively, of total revenue. During the year ended December 31, 2023, our largest customer accounted for approximately 13.4% of total revenue.
Previous wording
In managing our business and assessing financial performance, we supplement the information provided by the financial statements with other operating metrics. These operating metrics are utilized by our management to evaluate our business, measure our performance, identify trends affecting our business and formulate projections. The primary operating metric we use to evaluate our sales performance and to track market acceptance of our products is megawatts (“MWs”) shipped, and specifically the change in MWs shipped from period to period. MWs are measured for each individual project and are calculated based on the respective projects’ expected megawatt output once installed and fully operational.
Current wording
In managing our business and assessing financial performance, we supplement the information provided by the financial statements with other operating metrics. These operating metrics are utilized by our management to evaluate our business, measure our performance, identify trends affecting our business and formulate projections. The primary operating metric we use to evaluate our sales performance and to track market acceptance of our products is MWs shipped, and specifically the change in MWs shipped from period to period.
Previous wording
We generate revenue from the sale of solar tracking systems, parts, software and services. Our customers include EPCs, utilities, solar developers and independent power producers. For each individual solar project, we enter into a contract with our customers covering the price, specifications, delivery dates and warranty for the products being purchased, among other things. Our contractual delivery period for the tracker system and parts can vary from days to several months. Contracts can range in value from hundreds of thousands to tens of millions of dollars.
Current wording
We generate revenue from the sale of solar tracking and fixed-tilt systems, foundation solutions, parts, software and services. Our customers include solar developers, independent power producers, utilities, and EPCs. For each individual solar project, we enter into a contract with our customers covering the price, specifications, delivery dates and warranty for the products being purchased, among other things. Our contractual delivery period for the tracker system, fixed-tilt system, foundation solution, and parts can vary from days to several months. Contracts can range in value from hundreds of thousands to tens of millions of dollars.
Previous wording
Our revenue growth is dependent on continued growth in the size and number of solar energy projects installed each year as well as our ability to maintain market share in each geography in which we compete, expand our global footprint to new and evolving markets, grow our production capabilities to satisfy demand and continue to develop and introduce new and innovative products that integrate emerging technologies and the performance requirements of our customers.
Current wording
Our revenue growth is dependent on continued growth in the size and number of solar energy projects installed each year as well as our ability to grow or maintain market share in each geography in which we compete, expand our global footprint to new and evolving markets, grow our supply chain network and production capabilities to satisfy demand and continue to develop and introduce new and innovative products that integrate emerging technologies and meet the performance requirements of our customers.
Previous wording
A majority of our revenue is recognized over time as work progresses, and for single performance obligations, we use an input measure, the cost-to-cost method, to determine progress. We review and update the contract related estimates on an ongoing basis and recognize adjustments for any project specific facts and circumstances that could impact the measurement of the extent of progress, such as the total costs to complete the contracts, under the cumulative catch-up method. Due to the relatively short duration of our outstanding performance obligations, and our ability to estimate the remaining costs to be incurred, which are substantially all material costs covered under our material supply agreements with our suppliers, we have not recorded any material catch-up adjustments for the periods presented that would have impacted revenues or EPS related to revisions in our measurement of remaining progress of our performance obligations.
Current wording
A majority of our revenue is recognized over time as work progresses. For single performance obligations, we use an input measure, the cost-to-cost method, to determine progress. We review and update the contract related estimates on an ongoing basis and recognize adjustments for any project specific facts and circumstances that could impact the measurement of the extent of progress, such as the total costs to complete the contracts, under the cumulative catch-up method. Due to the relatively short duration of our outstanding performance obligations, and our ability to estimate the remaining costs to be incurred, which are substantially all material costs covered under our material supply agreements with our suppliers, we have not recorded any material catch-up adjustments for the periods presented that would have impacted revenues or EPS related to revisions in our measurement of remaining progress of our performance obligations.
Previous wording
Cost of product and service revenue consists primarily of product costs, including raw materials, purchased components, net of any incentives or rebates earned from our suppliers, salaries, wages and benefits of manufacturing personnel, freight, tariffs, customer support, product warranty, amortization of developed technology, and depreciation of manufacturing and testing equipment. Our product costs are affected by (i) the underlying cost of raw materials, including steel and aluminum, (ii) component costs, including electric motors and gearboxes, (iii) technological innovation, and (iv) economies of scale and improvements in production processes and automation. We may experience disruptions to our supply chain and increased material and freight costs like those experienced in 2021 and 2022 during the COVID-19 pandemic. When possible, we modify our production schedules and processes to mitigate the impact of these disruptions and cost increases on our margins. We do not currently hedge against changes in the price of our raw materials.
Current wording
Cost of product and service revenue consists primarily of product costs, including raw materials, purchased components, net of any incentives or rebates earned from our suppliers, salaries, wages and benefits of manufacturing personnel, freight, tariffs, customer support, product warranty, amortization of developed technology, and depreciation of manufacturing and testing equipment. Our product costs are affected by: (i) the underlying cost of raw materials, including steel and aluminum; (ii) component costs, including electric motors and gearboxes; (iii) technological innovation; and (iv) economies of scale and improvements in production processes and automation. We may experience disruptions to our supply chain and increased material and freight costs. When possible, we modify our production schedules and processes to mitigate the impact of these disruptions and cost increases on our margins. We do not currently hedge against changes in the price of our raw materials.
Previous wording
General and administrative expense consists primarily of salaries, benefits, and equity-based compensation related to our executive, sales, engineering, finance, human resources, information technology, and legal personnel, as well as travel, facility costs, marketing, bad debt provision, and professional fees. The majority of our sales in 2024, 2023, and 2022, were in the U.S.; however, in January 2022, we expanded our international operations with the STI Acquisition. We currently have a sales presence in the U.S., Spain, Brazil, South Africa and Australia. We intend to continue to expand our sales presence and marketing efforts to additional countries.
Current wording
General and administrative expense consists primarily of salaries, benefits, and equity-based compensation related to our executive, sales, R&D costs, finance, human resources, information technology, and legal personnel, as well as travel, facility costs, marketing, credit loss provision, and professional fees. We currently have a sales presence in the U.S. and across North America, Latin America, Europe, the Middle East, Asia and Australia, with the majority of our sales in the U.S. We intend to continue to expand our sales presence and marketing efforts to additional countries.
Previous wording
Contingent consideration consists of the changes in fair value of the tax receivable agreement (“TRA”) entered into with a former indirect stockholder, concurrent with the acquisition of Patent LLC by Former Parent. The TRA liability was recorded at fair value as of July 8, 2016 (the “Patent Acquisition Date”) and subsequent changes in the fair value are recognized in earnings. For discussion and analysis of the TRA see Note 16 – Commitments and Contingencies.
Current wording
Contingent consideration consists of the changes in fair value of the tax receivable agreement (“TRA”) entered into with a former indirect stockholder, concurrent with the acquisition of Array Technologies Patent Holdings Co., LLC by Former Parent, as well as the Earnout Consideration associated with the APA Purchase Agreement. The TRA liability and Earnout Consideration were recorded and subsequent changes in the fair value are recognized in earnings. See Note 15 – Commitments and Contingencies for discussion and analysis of the TRA and Earnout Consideration.
Previous wording
Amortization consists of the expense recognized over the expected period of use of our customer relationships, contractual backlog, and the STI trade name intangible assets. Amortization related to certain acquired intangible assets is recorded as Total cost of revenue under the caption “Amortization of developed technology.”
Current wording
Amortization consists of the expense recognized over the expected period of use of our developed technology, computer software, customer relationships, contractual backlog, and the STI and APA trade name intangible assets. Amortization related to certain acquired intangible assets is recorded as Total cost of revenue under the caption “Amortization of developed technology.”
Previous wording
Interest expense consists of interest and other charges paid in connection with our Senior Secured Credit Facility, the Convertible Notes, and Other debt held by our STI Operations.
Current wording
Interest expense consists of interest and other charges paid in connection with our Senior Secured Credit Facility, the Convertible Notes, and other debt held by our operations outside of the U.S.
Previous wording
Subsequent to the acquisition of STI, we began reporting our results of operations in two segments; the Array legacy operating segment (“Array Legacy Operations”) and the STI Operations operating segment (“STI Operations”) pertaining to legacy STI operations. The segment amounts included in this Item 7. Management’s Discussion and Analysis are presented on a basis consistent with our internal management reporting.
Current wording
We report our results of operations in two segments; the Array legacy operating segment (“Array Legacy Operations”) and the legacy STI operating segment (“STI Operations”). The segment amounts included in this Item 7. Management’s Discussion and Analysis are presented on a basis consistent with our internal management reporting. Additional information on our reportable segments is contained in Note 21 – Segment and Geographic Information in the accompanying notes to the consolidated financial statements.
Previous wording
The following table sets forth our consolidated statement of operations (in thousands):
Current wording
The following table sets forth our consolidated statements of operations (in thousands):
Previous wording
Consolidated revenue for the year ended December 31, 2024 decreased by $660.7 million, or 42%, compared to the year ended December 31, 2023, primarily driven by lower revenue from Array Legacy Operations of 44% and STI Operations of 37%.
Current wording
Consolidated revenue for the year ended December 31, 2025 increased by $368.3 million, or 40%, compared to the year ended December 31, 2024, primarily driven by higher revenue from Array Legacy Operations of 62%, partially offset by a 16% decline in STI Operations revenue.
Previous wording
Array Legacy Operations revenue for the year ended December 31, 2024 decreased by $511.2 million, or 44%, compared to the year ended December 31, 2023. The decrease was primarily driven by approximately 39% decrease in volume shipped and a decrease of approximately 8% in average selling prices.
Current wording
Revenue from STI Operations decreased by $40.5 million, or 16%, for the year ended December 31, 2025 compared to the year ended December 31, 2024. The decrease was primarily driven by a decrease of approximately 20% in volume, partially offset by a 5% increase in ASP.
Previous wording
Consolidated gross profit decreased by $117.9 million, or 28%, for the year ended December 31, 2024 compared to the year ended December 31, 2023. Consolidated gross margin increased to 33% for the year ended December 31, 2024, as compared to 26% during the same period in the prior year.
Current wording
Consolidated gross profit increased by $0.9 million, or 0.3%, for the year ended December 31, 2025 compared to the year ended December 31, 2024. Consolidated gross margin decreased to 23% for the year ended December 31, 2025, as compared to 33% during the same period in the prior year.
Previous wording
STI Operations gross profit decreased by $70.3 million, or 72%, for the year ended December 31, 2024 compared to the year ended December 31, 2023. Gross margin for STI Operations decreased to 11% from 24% for the years ended December 31, 2024 and 2023, respectively, driven by a decline in average selling prices of 24%, reduction in volume of 12%, partially offset by lower costs from operational efficiencies and lower input costs.
Current wording
STI Operations gross profit decreased by $29.1 million, or 105%, for the year ended December 31, 2025 compared to the year ended December 31, 2024. Gross margin for STI Operations decreased to (1)% from 11% for the years ended December 31, 2025 and 2024, driven primarily by a 5% increase in ASP that was more than offset by a 16% increase in CPW from a one-time inventory valuation charge of $29.5 million and a 3% increase in CPW from inflationary cost pressures.
Previous wording
Change in the fair value of contingent consideration resulted in a gain of $0.1 million for the year ended December 31, 2024, due to the fair value remeasurement of the TRA liability, primarily driven by a decrease in the discount rates used in the valuation.
Current wording
Change in the fair value of contingent consideration, inclusive of APA, resulted in a loss of $0.2 million for the year ended December 31, 2025, driven by a $0.4 million increase in the fair value of the TRA liability, partially offset by a $0.2 million decrease in the fair value of the Earnout Consideration.
Previous wording
During the year ended December 31, 2024, the Company identified certain indicators of impairment, which resulted in an impairment of goodwill and long-lived assets of $327.9 million.
Current wording
During the years ended December 31, 2025 and 2024, the Company identified certain indicators of impairment related to the STI Operations reporting unit, which resulted in an impairment of goodwill and long-lived assets of $102.6 million and $327.9 million, respectively.
Previous wording
Other expense was $1.0 million for both years ended December 31, 2024 and 2023. Other expense primarily consists of certain other non-income taxes and miscellaneous income/expense.
Current wording
Other expense was $1.0 million for both years ended December 31, 2025 and 2024. Other expense primarily consists of miscellaneous income and expense items.
Showing the first 40 of 57 pairs. Open the source sections for the rest.
Rearranged current paragraphs (3)
Current report — wording carried from elsewhere
Our third tracker product, OmniTrack, which was introduced in September 2022, requires significantly less grading and civil works permitting prior to installation in addition to accommodating uneven terrain.
Current report — wording carried from elsewhere
MWs are measured for each individual project and are calculated based on the respective projects’ expected MW output once installed and fully operational.
Current report — wording carried from elsewhere
The estimated fair value of the Array Legacy Operations reporting unit was significantly higher than the carrying balance of the reporting unit as of each of the testing dates. The fair value of the Array Legacy Operations and STI Operations reporting units were determined using the income approach and then compared to the GPC marketplace EBITDA multiples to corroborate the fair value of the reporting unit. As a result of these tests, the Company recorded impairments to goodwill totaling $102.6 million and $236.0 million during years ended December 31, 2025 and 2024, respectively, related to STI Operations reporting unit. Subsequent to recording the impairment of goodwill, the Company reconciled the overall market capitalization of the Company, within a reasonable range, to the sum of the estimated fair values of both of the Company’s reporting units.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
Additional information on our reportable segments is contained in Note 20 – Segment and Geographic Information in the accompanying notes to the consolidated financial statements.