Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-25.
0001819989-25-000005
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 168 previous paragraphs and 166 current paragraphs.
92 unchanged; 44 reworded; 28 added; 32 removed; 0 previous and 2 current paragraphs rearranged.
Tables are not compared: 5 previous and 5 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (28)
Current report
We develop and operate industrial-scale data centers. Our active portfolio and development pipeline is expected to consist of more than 3.0 GW of capacity across 11 sites. We currently operate four bitcoin mining data centers and have a pipeline of seven additional sites in Texas, including one site expected to energize in May 2025. As we develop the sites in our pipeline and source future sites, we evaluate their suitability for either bitcoin mining or HPC. For further details on our data centers, see “Business—Data Center Portfolio.”
Current report
We currently operate 327 MW of facilities across four bitcoin mining data centers in Texas, including one wholly-owned data center and three partially-owned data centers that we acquired through investments in joint ventures. We also have a pipeline of approximately 2.8 GW across seven additional sites in Texas, including one site that we expect to energize in May 2025. We will continue to evaluate other sites, locations and partnerships to expand our data center operations, selecting sites that are suitable for bitcoin mining and HPC data centers.
Current report
As of January 31, 2025, we operated an aggregate hashrate capacity of approximately 15.7 exahash per second (“EH/s”), deploying approximately 327 megawatts (“MW”) of electricity, of which we owned an aggregate hashrate capacity of approximately 13.5 EH/s, deploying approximately 266 MW of electricity. As further discussed in “—Our Strategy”, we plan to deploy an additional approximately 150 MW for a total of approximately 477 MW of electrical capacity by the end of 2025, and a corresponding hashrate of at least approximately 25.2 EH/s, of which we expect to own approximately 23.0 EH/s, with the remainder being owned by WindHQ, our JV partner. For further details on our joint ventures, see “Business—Business Agreements—Joint Ventures.”
Current report
Recent Developments
Current report
On January 30, 2025, we entered into a subscription agreement with Star Beacon LLC, a wholly owned subsidiary of SoftBank Group Corp. (“SoftBank”), pursuant to which, among other things, SoftBank agreed to subscribe for and purchase from us, and we agreed to issue and sell to SoftBank, an aggregate of approximately 10,438,413 newly issued shares of our common stock, par value $0.001, at a per share purchase price of $4.79 for an aggregate purchase price of approximately $50 million. As part of this transaction, we agreed prior to February 28, 2025, we would not enter into binding definitive documentation with respect to the sale, transfer, divestiture or encumbrance of the Barber Lake property with any person other than SoftBank and its affiliates.
Current report
On January 31, 2025, we executed our option as part of the Amendment Agreement, further described in Note 6. Deposits on equipment, with Bitmain to obtain Antminer S21 XP miners for delivery between May and June 2025. We intend to use these machines at the Black Pearl Facility. As of February 25, 2025, we owe $139 million remaining for these machine purchases.
Current report
Competition.
Current report
As the regulatory and legal environment evolves, we may become subject to new laws and further regulation by the SEC, CFTC, other federal agencies and state and local governments, which may affect our mining and other activities. For example, on January 23, 2025, the Trump Administration signed an executive order titled “Strengthening American Leadership in Digital Financial Technology,” which introduces new dynamics to the regulatory landscape. This order emphasizes the importance of the digital asset industry in U.S. innovation and economic development, outlining policies to support the growth and use of digital assets and blockchain technology. Key policies outlined in the executive order include ensuring access to open public blockchain networks for lawful purposes, promoting the U.S. dollar's sovereignty through lawful dollar-backed stablecoins, and providing regulatory clarity with technology-neutral regulations. The establishment of a new working group within the National Economic Council to propose a federal regulatory framework for digital assets could lead to significant changes in market structure, oversight, consumer protection, and risk management. The evolving regulatory environment may pose challenges to our operations, particularly if new regulations introduce additional compliance costs or restrict certain activities. Additionally, various bills have been proposed in the U.S. Congress related to our business, which may be adopted and have an impact on us, and governmental agencies and regulatory authorities, such as the SEC, the CFTC, the FTC and FinCEN, may also enact regulations related to our business, which may have an impact on us.
Current report
On a state level, there have been several recent legislative efforts to manage power consumption and support grid reliability, which affects our business, as an operator of industrial-scale data centers. In 2025, the Texas legislature introduced legislation to support ERCOT’s grid reliability by proposing minimum transmission rates on certain large loads and removing phantom loads from its interconnection queue to enhance accuracy of actual future load growth. Such regulation may increase the costs of running our current data centers and sourcing new potential sites in Texas. In 2025, the PUCT also required operators of large virtual currency mining operations connected to register their facilities with the PUCT. For additional discussion regarding our belief about the potential risks existing and future regulation pose to our business, see “Risk Factors—Risks Related to Regulatory Framework.”
Current report
Compensation and benefits
Current report
Compensation and benefits for the year ended December 31, 2024 was $60.8 million, an increase of $3.4 million compared to $57.4 million for the year ended December 31, 2023. The increase was primarily due to an increase in headcount year-over-year.
Current report
General and administrative expenses for the year ended December 31, 2024 was $32.7 million, an increase of $4.9 million compared to $27.8 million for the year ended December 31, 2023. The increase was primarily driven by an increase in legal fees related to strategic initiatives, and professional fees related to SOX 404 compliance as a result of losing Emerging Growth Company status in 2024.
Current report
Depreciation and amortization
Current report
Depreciation and amortization for the year ended December 31, 2024 was $102.4 million, an increase of $43.3 million compared to Depreciation and amortization of $59.1 million for the year ended December 31, 2023. The increase was primarily due to increased miners, and mining equipment at the Odessa Facility, as well as the change in the estimated useful life of our miners from five years to three years.
Current report
Unrealized gains on fair value of bitcoin totaled $11.3 million and $3.3 million for the year ended December 31, 2024, and 2023, respectively. The increase in the current period was primarily due to the increase in our bitcoin treasury compared to the prior period, as well as the increase in bitcoin price in the current year compared to the prior year.
Current report
Realized gains on sale of bitcoin
Current report
Realized gains on sale of bitcoin totaled $51.5 million and $7.7 million for the year ended December 31, 2024, and 2023, respectively. The increase in the current period was primarily related to gains recognized on bitcoin sales used to fund construction and site acquisitions in the current period.
Current report
Other expense
Current report
Other income totaled $0.6 million for the year ended December 31, 2024, compared to $2.1 million of Other expense for the year ended December 31, 2023. The decrease was primarily related to interest income on excess cash held in interest bearing accounts in the current year period.
Current report
Provision for (benefit from) income taxes
Current report
We had cash flows from operations of $87.5 million for the year ended December 31, 2024. As of December 31, 2024, we had cash and cash equivalents of $5.6 million, total stockholders’ equity of $682.0 million and an accumulated deficit of $181.4 million. We fund operations primarily through a combination of at-the-market stock issuances and bitcoin sales.
Current report
On December 13, 2024, we entered into an agreement with Luxor Technology Corporation (“Luxor”) to borrow 98.57 bitcoin for a 95 day period, which we were able to use as a source of short-term financing.
Current report
Net cash used in operating activities decreased by $6.7 million to $87.5 million for the year ended December 31, 2024 from $94.2 million for the year ended December 31, 2023. We incurred a net loss of $44.6 million for the year ended December 31, 2024, compared to a net loss of $25.8 million for the year ended December 31, 2023, representing an increase of $18.9 million. Cash flows from operating activities was impacted by a $3.5 million increase in non-cash items, primarily driven by a $25.0 million increase in bitcoin received as payment from our mining pool operator, $34.8 million loss on our derivative asset, and a $43.8 million increase in gains on the fair value of bitcoin. Additionally, changes in assets and liabilities resulted in an increase in cash used of $29.1 million between the years ended December 31, 2024 and 2023.
Current report
On December 17, 2021, we entered into a lease agreement for office space, amended in the second quarter of 2024, with a term through May 2029. Monthly rent payments associated with the amended lease are approximately $0.2 million.
Current report
The following is a reconciliation of our Adjusted Earnings (Loss) per share - diluted to the most directly comparable GAAP measure for the periods indicated:
Current report
Asset retirement obligations
Current report
Short-term borrowings
Current report
Short-term borrowings includes debt with maturity dates less than one year. We elected the fair value option for debt denominated in bitcoin. The change in fair value for bitcoin denominated debt is recorded in Other income (expense).
Removed paragraphs (32)
Previous report
We are an emerging technology company that develops and operates industrial scale bitcoin mining data centers. Cipher Mining Inc., through itself and its consolidated subsidiaries, including CMTI, currently operates four bitcoin mining data centers in Texas. Bitcoin mining is our principal revenue generating business activity.
Previous report
Our key mission is to expand and strengthen the Bitcoin network’s critical infrastructure. As of February 29, 2024, we operated approximately 80,000 miners, with an aggregate hashrate capacity of approximately 8.4 EH/s, deploying approximately 267 MW of electricity, of which we owned approximately 70,000 miners, with an aggregate hashrate capacity of approximately 7.4 EH/s, deploying approximately 236 MW of electricity.
Previous report
We currently operate four bitcoin mining data centers in Texas, including one wholly-owned and three partially-owned data centers acquired through investments in joint ventures. Our largest data center is the Odessa Facility which is our wholly-owned 207 MW facility located in Odessa, Texas. We also operate our Alborz, Bear and Chief facilities in different sites across Texas pursuant to a joint venture with WindHQ where we have a 49% membership interest in each facility. Our fifth data center, which is wholly-owned, is expected to commence operations in 2025.
Previous report
All of our miners are housed in air-cooled containers and we do not currently have any immersion miners. This means we cannot increase the clock rate to speed up performance of, or “over-clock,” our miners, and it is possible that our miners will experience greater wear-and-tear due to environmental factors, including temperature changes and dust, than might other miners housed in immersion cooling containers. See “Risk Factors—Risks Related to Our Business, Industry and Operations—Bitcoin miners and other necessary hardware are subject to malfunction, technological obsolescence and physical degradation.”
Previous report
Additionally, our strategy involves curtailing our mining operations, meaning we turn the miners on and off, for a variety of contractual, economic, weather related, business or other reasons. We do not know how that cycling on and off process will affect the efficiency of our miners over time or whether they will age faster than machines that are not turned on and off as frequently. See “Risk Factors—Risks Related to Our Business, Industry and Operations—Bitcoin miners and other necessary hardware are subject to malfunction, technological obsolescence and physical degradation.”
Previous report
Competition and Network Hashrate.
Previous report
Recently, on January 10, 2024, the SEC approved the listing and trading of spot bitcoin ETPs, the shares of which can be sold in public offerings and are traded on U.S. national securities exchanges. The approved ETPs commenced trading directly to the public on January 11, 2024, with a trading volume of $4.6 billion on the first trading day. It is unclear how the approval of spot bitcoin ETPs will affect the price of bitcoin going forward. Regulations may substantially change in the future and it is presently not possible to know how regulations will apply to our businesses, or when they will be effective. As the regulatory and legal environment evolves, we may become subject to new laws and further regulation by the SEC and other agencies, which may affect our mining and other activities. For instance, various bills have been proposed in the U.S. Congress related to our business, which may be adopted and have an impact on us. Additionally, governmental agencies and regulatory authorities, such as the SEC, the Commodity Futures Trading Commission, the Federal Trade Commission and the Financial Crimes Enforcement Network of the U.S. Department of the Treasury, may also enact regulations related to our business, which may have an impact on us. For additional discussion regarding our belief about the potential risks existing and future regulation pose to our business, see “Risk Factors—Risks Related to Regulatory Framework.”
Previous report
Comparison of the Year Ended December 31, 2023 and the Year Ended December 31, 2022
Previous report
General and administrative expenses increased by $14.4 million to $85.2 million during the year ended December 31, 2023 from $70.8 million for the year ended December 31, 2022. The increase was primarily driven by an increase of $14.4 million for compensation and benefits for employees due to increasing headcount from 23 to 36, as well as a $2.0 million accrual related to our legal settlement with Luminant. See additional information in“—Note 14 Commitments and Contingencies.”
Previous report
Depreciation
Previous report
Depreciation for the year ended December 31, 2023 was $59.1 million, an increase of $54.7 million compared to depreciation expense of $4.4 million for the year ended December 31, 2022. The increase was primarily due to miners, mining equipment and leasehold improvements at the Odessa Facility being in service for a full year in 2023 compared to less than two months in the prior year.
Previous report
Pursuant to the adoption of ASC 2023-08, which we adopted as of January 1, 2023, crypto assets are required to be presented at fair value on the balance sheet, with changes in fair value recorded to the statement of operations. On January 1, 2023, upon adoption of ASC 2023-08, we recorded an opening retained earnings adjustment of $0.2 million, which represents the difference between the carrying value (presented as cost less impairment prior to the adoption of ASC 2023-08) and the fair value of our bitcoin holdings. During the year ended December 31, 2023, we recognized a total of $11.0 million of gains on bitcoin earned from our mining activities and received as distributions from our equity investees.
Previous report
Other income (expense)
Previous report
Other expense totaled $2.1 million for the year ended December 31, 2023, compared to $0.2 million of Other income for the year ended December 31, 2022. The increase is primarily related to interest expense on finance leases during the year ended December 31, 2023 related to the Odessa Facility.
Previous report
Provision for income taxes
Previous report
We incurred a net loss of $25.8 million and negative cash flows from operations of $94.2 million for the year ended December 31, 2023. As of December 31, 2023, we had cash and cash equivalents of $86.1 million, 780 bitcoin with a fair value of $33.0 million, total stockholders’ equity of $491.3 million and an accumulated deficit of $136.8 million. To date, we have relied in large part on proceeds from the consummation of our business combination with GWAC (the “Business Combination”), as well as liquidating our bitcoin inventory, to fund our operations. During the year ended December 31, 2023, we paid approximately $33.9 million as deposits on equipment, primarily for miners, and had $30.8 million of deposits on equipment still on our consolidated balance sheet as of December 31, 2023. We currently have purchase commitments for miners of $98.8 million primarily related to the Black Pearl Facility that will require resources beyond our existing financial resources as of December 31, 2023. Management intends to continue with the infrastructure buildout at the Black Pearl Facility to get the site to full capacity in support of our current business plans. Our management believes that our existing financial resources, combined with projected cash and bitcoin inflows from its data centers and our intent and ability to sell bitcoin received or earned, will be sufficient to enable us to meet our operating and capital requirements for at least 12 months from the date these consolidated financial statements are issued.
Previous report
On September 21, 2022, we filed the Registration Statement with the SEC. In connection with the filing of the Registration Statement, we also entered into an at-the market offering agreement (the “Prior Sales Agreement”) with H.C. Wainwright & Co., LLC (the “Prior Agent”), under which we may, from time to time, sell shares of our Common Stock having an aggregate offering price of up to $250.0 million in “at-the-market” offerings through the Agent, which is included in the $500.0 million of securities that may be offered pursuant to the Registration Statement. Effective August 1, 2023, the Company terminated the Prior Sales Agreement.
Previous report
Net cash used in operating activities increased by $73.3 million to $94.2 million for the year ended December 31, 2023 compared to $20.9 million for the year ended December 31, 2022. This was primarily driven by a $68.2 million change in non-cash items year-over-year, specifically a $57.7 million negative impact of non-cash adjustments in 2023 compared to a $10.5 million positive impact in 2022. The negative impact of non-cash adjustments in 2023 consisted primarily of $126.3 million of bitcoin received as payment for services, representing a $123.4 million increase over the prior year due to increased operations at the Odessa Facility, where we began mining in November 2022, as well as a decrease of $34.4 million of equity in losses of equity investees which was comprised mainly of the $33.4 million of losses recognized upon our contributions of equipment during the prior year. These negative non-cash adjustments were partially offset by the positive impact of $54.6 million of additional depreciation and a $46.6 million decrease in the unrealized gain resulting from the revaluation of our derivative asset. Additionally, changes in assets and liabilities resulted in a $18.4 million increase in cash used in operating activities, including a $13.2 million decrease in accounts payable and accounts payable, related party.
Previous report
Limited Business History; Need for Additional Capital
Previous report
There is limited historical financial information about the Company upon which to base an evaluation of our performance. Our business is subject to risks inherent in the establishment of a new business enterprise, including limited capital resources, possible delays in exploration and/or development, and possible cost overruns due to price and cost increases in services. We have no current intention of entering into a merger or acquisition within the next 12 months. We may require additional capital to pursue certain business opportunities or respond to technological advancements, competitive dynamics or technologies, customer demands, challenges, acquisitions or unforeseen circumstances. Additionally, we have incurred and expect to continue to incur significant costs related to being a public company. Accordingly, we may in engage in equity or debt financings or enter into credit facilities for the above-mentioned or other reasons; however, we may not be able to timely secure additional debt or equity financings on favorable terms, if at all. If we raise additional funds through equity financing, our existing stockholders could experience significant dilution. Furthermore, any debt financing obtained by us in the future could involve restrictive covenants relating to our capital raising activities and other financial and operational matters, which may make it more difficult for us to obtain additional capital and to pursue business opportunities. If we are unable to obtain adequate financing on terms that are satisfactory to us, when we require it, our ability to continue to grow or support the business and to respond to business challenges could be significantly limited, which may adversely affect our business plan. For risks associated with this, see “Risks Factors—Risks Related to Our Business, Industry and Operations—We mayneed to raise additional capital, which may not be available on terms acceptable to us, or at all.”
Previous report
On December 17, 2021, we entered into a lease agreement for executive office space, with an effective term commencing on February 1, 2022 and monthly rent payments of approximately $0.1 million commencing on June 1, 2022. The initial lease term is for a period of five years and four months.
Previous report
Financing for use of the land and substation is provided by Luminant affiliates, with monthly installments of principal and interest due over a five-year period starting upon transfer of legal title of the substation to us (estimated total undiscounted principal payments of $15.0 million).
Previous report
On December 8, 2023, we entered into an agreement with Trinity Mining Group, Inc. (“Trinity”) to assume a lease for a 70 acre plot of land in Winkler County, Texas, for the purpose of constructing a data center, and ancillary infrastructure to construct the Black Pearl Facility. The initial term of the lease is ten years, and includes four consecutive renewal provisions.
Previous report
Mining and Mining Equipment
Previous report
At December 31, 2023, we had the following contractual obligations and other commitments for miners and other mining equipment (in thousands):
Previous report
On October 4, 2023, the we entered into an agreement with Bitmain to purchase 1.2 EH/s worth of Bitmain’s new HASH Super Computing Servers (Antminer S21-200.0T model) for a total purchase price of $24.0 million to be paid in cash and coupons, or $16.8 million in cash after applying coupons. We expect to make periodic payments in accordance with the payment schedule under this agreement, with the final payment expected to occur one year after the delivery of the last batch of miners. Related to this agreement, we have made installment payments of $7.6 million, which is included in deposits on equipment as of December 31, 2023. Batches of the Antminer S21 miners are expected to be delivered between January and June 2024.
Previous report
On December 18, 2023, we entered into a second agreement with Bitmain to purchase 37,396 units of the latest generation Antminer T21 miners to be delivered in the first half of 2025. We paid a deposit of $9.9 million upon execution of the agreement. The agreement has an option to purchase an additional 45,706 miners in 2024. We paid an additional $12.2 million as a deposit, which can be used towards purchases under this option.
Previous report
Asset retirement obligation
Previous report
Leases
Previous report
The mining pool operator calculates block rewards under the FPPS approach described above and may charge a pool fee for maintenance of the pool that reduces the amount of block rewards to which we are entitled. Foundry did not claim a fee for any block rewards earned by us in 2023. After every 24-hour contract term, we receive a payout and the pool transfers the bitcoin consideration to our designated bitcoin wallet.
Previous report
Emerging Growth Company
Previous report
We are an “emerging growth company,” as defined in the Jumpstart Our Business Startups Act of 2012 (the “JOBS Act”). Under the JOBS Act, emerging growth companies can delay adopting new or revised accounting standards issued subsequent to the enactment of the JOBS Act until such time as those standards apply to private companies. We have elected to use this extended transition period to enable us to comply with new or revised accounting standards that have different effective dates for public and private companies until the earlier of the date we (i) are no longer an emerging growth company or (ii) affirmatively and irrevocably opt out of the extended transition period provided in the JOBS Act. As a result, our unaudited condensed consolidated financial statements may not be comparable to companies that comply with new or revised accounting pronouncements as of public company effective dates.
Reworded paragraphs (44)
Previous wording
Our current intention is to continue to expand our bitcoin mining business by developing additional data centers, expanding capacity at our current data centers and entering into other arrangements, such as joint ventures or data center hosting agreements.
Current wording
Our current intention is to continue expanding our business by developing and operating industrial-scale data centers for bitcoin mining and HPC, expanding capacity at our current data centers, developing our treasury management platform and entering into other strategic arrangements, such as joint ventures, data center hosting and leasing agreements, or software licensing arrangements. We aim to be a market leader in innovation, including in bitcoin mining growth, data center construction and as a hosting partner to HPC companies.
Previous wording
Our revenues are directly impacted by changes in the market value of bitcoin. For example, the average bitcoin price for 2021 and 2022 was $47,385 and $16,526, respectively. Bitcoin price generally increased throughout 2023. As at December 31, 2023, the price of bitcoin was $42,288. Furthermore, block rewards are fixed and the Bitcoin network is designed to periodically reduce them through halving. Currently the block rewards are fixed at 6.25 bitcoin per block, and it is estimated that it will halve again to 3.125 bitcoin per block in April 2024. The halving events happen without any regard to ongoing demand, meaning that if the ongoing demand remains the same after a halving event, whatever demand was being met by new supply will be restricted, which may necessitate an adjustment of the price of bitcoin, though there is no definitive evidence of a causal link between bitcoin’s programmatic decrease in supply and broadening demand. Once the halving occurs, we expect that it could have a negative impact on our revenues as the reward for each bitcoin mined will be reduced.
Current wording
Our revenues are directly impacted by changes in the market value of bitcoin. For example, the market price of one bitcoin in our principal market ranged from approximately $38,501 to $108,389 during the fiscal year ended December 31, 2024 and $16,490 to $45,000 during the fiscal year ended December 31, 2023. Furthermore, block rewards are fixed and the Bitcoin network is designed to periodically reduce them through halving. Currently the block rewards are fixed at 3.125 bitcoin per block after the latest halving in April 2024. The halving events happen without any regard to ongoing demand, meaning that if the ongoing demand remains the same after a halving event, whatever demand was being met by new supply will be restricted, which may necessitate an adjustment of the price of bitcoin, though there is no definitive evidence of a causal link between bitcoin’s programmatic decrease in supply and broadening demand.
Previous wording
Bitcoin miners also collect transaction fees for each transaction they confirm. Miners validate unconfirmed transactions by adding the previously unconfirmed transactions to new blocks in the blockchain. Miners are not forced to confirm any specific transaction, but they are economically incentivized to confirm valid transactions as a means of collecting fees. Miners have historically accepted relatively low transaction confirmation fees, because miners have a very low marginal cost of validating unconfirmed transactions; however, unlike the fixed block rewards, transaction fees may vary, depending on the consensus set within the network.
Current wording
Bitcoin miners also collect transaction fees for each transaction they confirm. Miners validate unconfirmed transactions by adding the previously unconfirmed transactions to new blocks in the blockchain. Miners are not forced to confirm any specific transaction, but they are economically incentivized to confirm valid transactions as a means of collecting fees. Miners have historically accepted relatively low transaction confirmation fees, but transaction fees vary and it is difficult to predict what transaction fees will be in the future.
Previous wording
Because the number of bitcoin mined is directly related to the size and efficiency of a bitcoin mining company’s fleet of miners, we believe miners need to deploy increasingly sophisticated miners in ever greater quantities to remain competitive. To remain competitive, we will need to increase our hashing power to maintain market share as the overall hashrate and difficulty of the Bitcoin network increases.
Current wording
Because the number of bitcoin mined is directly related to the size and efficiency of a bitcoin mining company’s fleet of miners, we believe we need to deploy increasingly sophisticated miners in ever greater quantities to remain competitive as the overall hashrate and difficulty of the Bitcoin network increases.
Previous wording
We believe that our commitment to cost and mining efficiency remains our competitive advantage. The majority of our capital expenditures have been directed towards the latest models of mining machines and technology featuring industry-leading capacity, speed and efficiency. We believe that we operate one of the most efficient mining rig fleets in the global market. In some periods, the industry has experienced, and we expect may experience again in the future, a scarcity of advanced mining rigs. We believe that to maintain our competitive advantage over the long term, we must develop and maintain strong relationships across the mining rig supply chain, and strategically invest in state-of-the art miners at attractive prices, while effectively managing our fleet as it ages along the obsolescence curve.
Current wording
We believe that our commitment to cost and mining efficiency remains our competitive advantage. The majority of our capital expenditures have been directed towards the latest models of mining machines and technology featuring industry-leading capacity, speed and efficiency. We believe that we operate one of the most efficient mining rig fleets in the global market. We believe that to maintain our competitive advantage over the long term, we must develop and maintain strong relationships across the mining rig supply chain, and strategically invest in state-of-the art miners at attractive prices, while effectively managing our fleet as it ages along the obsolescence curve.
Previous wording
Mining bitcoin is a highly power-intensive process, with large amounts of electrical power required to operate the mining rigs. We believe that cost efficiency, and particularly, maintaining cost of power efficiency in bitcoin mining over the long term, will be necessary for success. We currently have a portfolio of competitively priced electrical power. However, there is no guarantee that we will be able to negotiate additional power agreements on similar terms, or at all. See “Risk Factors—Risks Related to Our Business, Industry and Operations—We may be affected by price fluctuations in the wholesale and retail power markets” and “—Risks Related to Bitcoin Mining—We may not adequately respond to price fluctuations and rapidly changing technology, which may negatively affect our business.” Our four data centers are all located in west Texas and the Texas Panhandle, which are areas that we believe have site development potential with access to competitively priced electrical power, whether through grid connection, through solar and wind generation facilities, or otherwise. Where we can, we anticipate that we will, either directly, or through our power providers, participate in demand response programs offered by ERCOT. We believe these strategic investments will generate long-term returns in the form of controlled access to low cost, responsible sources of power and differentiate us from our competitors. However, after the initial terms of our current power purchase arrangements end, we may not be able to secure similarly competitively priced access to the electrical power needed for out data centers to mine bitcoin profitably.
Current wording
Mining bitcoin is a highly power-intensive process, with large amounts of electrical power required to operate the mining rigs. We believe that cost efficiency, and particularly, maintaining cost of power efficiency in bitcoin mining over the long term, are necessary for success. We currently have a portfolio of competitively priced electrical power. However, there is no guarantee that we will be able to negotiate additional power agreements on similar terms, or at all. See “Risk Factors—Risks Related to Our Business, Industry and Operations—We may be affected by price fluctuations in the wholesale and retail power markets.” Our four currently operational data centers are all located in west Texas and the Texas Panhandle, which are areas that we believe have site development potential with access to competitively priced electrical power, whether through grid connection, through solar and wind generation facilities, or otherwise. We believe these strategic investments will generate long-term returns in the form of controlled access to low cost, responsible sources of power and differentiate us from our competitors. However, after the initial terms of our current power purchase arrangements end, we may not be able to secure similarly competitively priced access to the electrical power needed for our data centers to mine bitcoin profitably.
Previous wording
Our business environment is constantly evolving, and bitcoin miners can range from individual enthusiasts to professional mining operations with dedicated mining facilities. We compete with other companies that focus all or a portion of their activities on mining activities at scale. In the past few years there have been many new entrants and existing competitors in the space and a general increase in the competition for industrial scale bitcoin mining companies.
Current wording
Our business environment is constantly evolving. In the past few years there have been many new entrants and existing competitors in the bitcoin mining space and a general increase in the competition for industrial-scale bitcoin mining companies with whom we compete over aspects of our industry, such as hashrate and power capacity. Additionally, there have been new entrants in the data center space, such as HPC companies, with whom we may compete over power availability. As thecompetition for power capacity and data center locations continues to increase, we have been able to capitalize on our commitment to innovation and flexibility by expanding our business to include data center construction for industries beyond bitcoin mining, such as HPC hosting.
Previous wording
The operations of our facilities, including the development of the Black Pearl Facility and our other expansion plans, require specialized equipment, large quantities of construction materials and other component parts that can be difficult to source. We may experience disruptions to our business operations resulting from delays in construction and obtaining necessary equipment in a timely fashion due to global supply chain delays caused by geopolitical unrest, global pandemics like COVID-19 or other factors. Global supply logistics have caused delays across all channels of distribution, and we have also experienced delays in certain of our miner delivery schedules. Additionally, the global supply chain for data center construction equipment, such as transformers and substations, is presently further constrained due to unprecedented demand. Based on our current assessments, we do not expect any material impact on long-term development, operations, or liquidity. However, we continue to monitor developments in the global supply chain and assess their potential impact on our operations and expansion plans. For further discussion, see “Risk Factors — Risks Related to Our Business, Industry and Operations — We are exposed to risks related to disruptions or other failures in the supply chain for bitcoin mining hardware and related data center hardware, and difficulties in obtaining new hardware.
Current wording
The operations of our facilities and our other expansion plans, require specialized equipment, large quantities of construction materials and other component parts that can be difficult to source. We may experience disruptions to our business operations resulting from delays in construction and obtaining necessary equipment in a timely fashion due to global supply chain delays caused by geopolitical unrest, global pandemics, or other factors. Global supply logistics have caused delays across all channels of distribution, and we have also experienced delays in certain of our miner delivery schedules. Additionally, the global supply chain for data center construction equipment, such as transformers and substations, is presently further constrained due to unprecedented demand. Based on our current assessments, we do not expect any material impact on long-term development, operations, or liquidity. However, we continue to monitor developments in the global supply chain and assess their potential impact on our operations and expansion plans.
Previous wording
We operate in a complex and rapidly evolving regulatory environment and we are subject to a wide range of laws and regulations enacted by U.S. federal, state and local governments, governmental agencies and regulatory authorities, including the SEC, the Commodity Futures Trading Commission, the Federal Trade Commission and the Financial Crimes Enforcement Network of the U.S. Department of the Treasury, as well as similar entities in other countries. Other regulatory bodies, governmental or semi-governmental, have shown an interest in regulating or investigating companies engaged in the blockchain or cryptocurrency businesses.
Current wording
As a company operating at the intersection of data center, bitcoin mining and HPC hosting services, we are committed to maintaining a proactive and adaptive approach to regulatory compliance. We closely monitor legislative and regulatory developments and engage in dialogue with relevant stakeholders to ensure our business practices align with the evolving legal and regulatory framework. Despite uncertainties posed by a changing regulatory landscape, we remain committed to maintaining innovative and responsible business practices in data center, bitcoin mining and HPC hosting markets. We operate in a complex and rapidly evolving regulatory environment and we are subject to a wide range of laws and regulations enacted by U.S. federal, state and local governments, governmental agencies and regulatory authorities, including the SEC, the CFTC, the FTC and FinCEN, as well as similar entities in other countries. Other regulatory bodies, governmental or semi-governmental, have shown an interest in regulating or investigating companies engaged in the blockchain or cryptocurrency businesses.
Previous wording
Furthermore, because we may strategically expand our operations, see “Business—Our Strategy— Retain flexibility in considering strategically adjacent opportunities complimentary to our business model,” we may become subject to additional regulatory requirements.
Current wording
Furthermore, because we may strategically expand our operations into new areas, see “Business—Our Strategy— Commitment to growth, innovation and retaining flexibility to consider strategically adjacent opportunities to expand our business model,” we may become subject to additional regulatory requirements.
Previous wording
The following table presents information about our Bitcoin mining activities, including bitcoin production and sales of bitcoin (dollar amounts in thousands):
Current wording
The following table presents information about our Bitcoin mining activities for the year ended December 31, 2024, including bitcoin production and sales of bitcoin (dollar amounts in thousands):
Previous wording
Our revenue consists of bitcoin earned through mining activities at the Odessa Facility. We currently participate in third-party mining pools, including Foundry and Luxor, to mine bitcoin. The provision of computing power in accordance with the mining pool operator’s terms of service is the only performance obligation in our contract with the mining pool operator. We are entitled to a fractional share of the fixed cryptocurrency award from the mining pool operator (referred to as a “block reward”) and potentially transaction fees generated from blockchain users and distributed to individual miners by the mining pool operator.
Current wording
Our revenue consists of bitcoin earned through mining activities at the Odessa Facility. We currently participate in third-party mining pools to mine bitcoin. The provision of computing power in accordance with the mining pool operator’s terms of service is the only performance obligation in our contract with the mining pool operator. We are entitled to a fractional share of the fixed cryptocurrency award from the mining pool operator (referred to as a “block reward”) and potentially transaction fees generated from blockchain users and distributed to individual miners by the mining pool operator.
Previous wording
Cost of revenue consists primarily of direct production costs of bitcoin mining operations, consisting mainly of electricity expenses, as well as other facilities costs associated with our wholly-owned Odessa Facility, but excludes depreciation which is separately stated.
Current wording
Cost of revenue consists of direct production costs of bitcoin mining operations, primarily electricity expenses, as well as other facilities costs associated with our wholly-owned Odessa Facility, but excludes depreciation which is separately stated.
Previous wording
General and administrative expenses represent salary and other employee costs including stock-based compensation, insurance expense, rent expense for non-mining locations, professional fees, including accounting and audit, consulting, legal, public relations and/or investor relations expenses, non-income taxes and licenses, travel, and other expenses. We expect our administrative fees to remain high as we incur the ongoing costs of operating as a public company, including increased director and officer insurance costs, potential increases in the number of employees at the Company, and increased travel and conference participation expenses.
Current wording
General and administrative expenses represent insurance expense, rent expense, professional fees, including accounting and audit, consulting, legal, public relations and/or investor relations expenses, non-income taxes and licenses, travel, and other expenses. We expect our administrative fees to remain high as we incur the ongoing costs of operating as a public company, including increased director and officer insurance costs, and increased travel and conference participation expenses.
Previous wording
Our depreciation expense consists mainly of depreciation for our miners and mining equipment, as well as depreciation associated with leasehold improvements and other capitalized assets associated with the Odessa Facility. It also includes an immaterial amount of depreciation for other property and equipment not directly associated with our mining activities. We capitalize the cost of our mining machines and record depreciation expense on a straight-line basis over the estimated useful life of the machines, which is generally 5 years. Leasehold improvements include capitalized asset retirement costs, which are amortized over the estimated useful life of the related asset. All other leasehold improvements are depreciated over the lesser of the estimated useful life of the asset or the remaining life of the related lease.
Current wording
Our depreciation expense consists mainly of depreciation for our miners and mining equipment, as well as depreciation associated with leasehold improvements and other capitalized assets. We capitalize the cost of our mining machines and record depreciation expense on a straight-line basis over the estimated useful life of the machines, which is generally 3 years. Leasehold improvements include capitalized asset retirement costs, which are amortized over the estimated useful life of the related asset. All other leasehold improvements are depreciated over the lesser of the estimated useful life of the asset or the remaining life of the related lease.
Previous wording
The change in fair value of derivative asset primarily represents the initial fair value recorded for the derivative asset related to the Luminant Power Agreement on July 1, 2022, and includes the subsequent changes in fair value recorded during the reporting period.
Current wording
The change in fair value of derivative asset represents the changes in fair value of the Luminant Power Agreement recorded during the reporting period.
Previous wording
Equity in losses of equity investees includes our share of the losses recorded by Alborz LLC, Bear LLC and Chief LLC. Additionally, it includes the losses that we recognized upon our contributions of miners to these equity investees, due to the miners having a lower fair value at the time of the contributions than our costs paid to obtain them, which resulted in basis differences between the cost of the investments on our consolidated balance sheet and the amount of our underlying equity in the net assets of the investee attributed to the miners. We are accreting these basis differences and recognizing the accretion as a reduction to our share of the losses recognized by Alborz LLC, Bear LLC and Chief LLC within the equity in losses of equity investees on the consolidated statement of operations over the depreciation period for the miners.
Current wording
Equity in losses of equity investees includes our share of the losses recorded by Alborz LLC, Bear LLC and Chief Mountain LLC. Additionally, it includes the losses that we recognized upon our contributions of miners to these equity investees, due to the miners having a lower fair value at the time of the contributions than our costs paid to obtain them, which resulted in basis differences between the cost of the investments on our consolidated balance sheet and the amount of our underlying equity in the net assets of the investee attributed to the miners. We are accreting these basis differences and recognizing the accretion as a reduction to our share of the losses recognized by Alborz LLC, Bear LLC and Chief Mountain LLC within the equity in losses of equity investees on the consolidated statement of operations over the depreciation period for the miners.
Previous wording
During 2023, we mined bitcoin and received bitcoin as distributions-in-kind from our equity investees, Alborz LLC, Bear LLC and Chief LLC. All of our bitcoin is recorded as a current asset on our consolidated balance sheet as we expect to begin regularly exchanging our bitcoin held for fiat currency to fund our operating expenses. We adopted of ASU 2023-08 effective January 1, 2023, which requires cryptocurrencies to be measured at fair value each reporting period with changes in fair value being reported in net income. Prior to adoption of this ASU, our bitcoin were accounted for as intangible assets with indefinite useful lives, and as such assessed for impairment on a daily basis. Impairment was recognized when the carrying amount of bitcoin exceeded its fair value, which was determined based on the lowest daily trading price of bitcoin based on quoted prices on the active trading platform that management has determined is our principal market for bitcoin.
Current wording
All of our bitcoin is recorded as a current asset on our consolidated balance sheet as we expect to begin regularly exchanging our bitcoin held for fiat currency to fund our operating expenses. We adopted ASU 2023-08 effective January 1, 2023, which requires cryptocurrencies to be measured at fair value each reporting period with changes in fair value being reported in net income.
Previous wording
The following table sets forth our results of operations for the periods indicated (in thousands):
Current wording
The following table presents sets forth our results of operations for the periods indicated (in thousands):
Previous wording
Revenue for the year ended December 31, 2023 was $126.8 million and was generated entirely from bitcoin mining operations at the Odessa Facility, which began mining for bitcoin on November 22, 2022. The increase year over year was primarily driven by 2023 being a full year of mining, coupled with the overall increase in bitcoin price. For the period from November 22, 2022 through December 31, 2022, we recognized revenue of $3.0 million.
Current wording
Revenue for the year ended December 31, 2024 was $151.3 million, compared to $126.8 million for the year ended December 31, 2023, and was generated entirely from bitcoin mining operations at the Odessa Facility. The increase year over year was primarily driven by an overall increase in bitcoin price in the current year, partially offset by the halving in April 2024 which reduced the bitcoin reward per block from 6.25 to 3.125.
Previous wording
Cost of revenue for the year ended December 31, 2023 was $50.3 million, compared with $0.7 million for the year ended December 31, 2022, and consisted primarily of power costs at the Odessa Facility under the Luminant Power Agreement, which began operations in November, 2022. The Odessa Facility operated for the full year in 2023, compared to less than two months in the prior year.
Current wording
Cost of revenue for the year ended December 31, 2024 was $62.4 million, compared with $50.3 million for the year ended December 31, 2023, and consisted primarily of power costs at the Odessa Facility. The increase in the current year period was primarily due to expenses incurred related to the fleet upgrade at the Odessa Facility, in addition to drawing power from the grid at Odessa when our power provider curtailed us under our Power Purchase Agreement.
Previous wording
Change in fair value of derivative asset was $26.8 million for the year ended December 31, 2023 and was driven by the fair value of the Luminant Power Agreement. The estimated fair value of our derivative asset was derived from Level 2 and Level 3 inputs, and, due to a lack of quoted prices for similar type assets, is classified in Level 3 of the fair value hierarchy. Specifically, the discounted cash flow estimation models contain quoted spot and forward prices for electricity, as well as estimated usage rates consistent with the terms of the Luminant Power Agreement, the initial term of which is five years.
Current wording
Change in fair value of derivative asset was a $7.9 million decrease for the year ended December 31, 2024 and was driven by the fair value of the Luminant Power Agreement. The estimated fair value of our derivative asset was derived from Level 2 and Level 3 inputs, and, due to a lack of quoted prices for similar type assets, is classified in Level 3 of the fair value hierarchy. Specifically, the discounted cash flow estimation models contain quoted spot and forward prices for electricity, as well as estimated usage rates consistent with the terms of the Luminant Power Agreement, the initial term of which is five years.
Previous wording
After the start of mining operations at the Odessa Facility on November 22, 2022, we sold excess electricity that was available under the Luminant Power Agreement, but not needed in our mining operations at the Odessa Facility, back to the ERCOT market through Luminant. We sold power for proceeds of $9.9 million and $0.5 million for the years ended December 31, 2023, and December 31, 2022, respectively. Power sales increased in 2023 because that year had a full year of operations at the Odessa Facility compared to under two months of operations in the prior year.
Current wording
At our Odessa Facility, we sell excess electricity that was available under the Luminant Power Agreement, but not needed in our mining operations, back to the ERCOT market through Luminant. We sold power for proceeds of $5.4 million and $9.9 million for the year ended December 31, 2024, and 2023, respectively. Power sales fluctuate each period based on power and bitcoin prices which are volatile.
Previous wording
Equity in losses of equity investees totaled $2.5 million for the year ended December 31, 2023 compared to $37.0 million for the year ended December 31, 2022. Equity in losses of equity investees for the year ended December 31, 2022 primarily consisted of losses totaling $33.4 million recognized by us in relation to miners contributed between June 2022 and October 2022 to Alborz LLC, Bear LLC and Chief LLC that had fair values at the time of the contributions that were less than the costs we paid to obtain the miners. These losses created basis differences in our investments in the equity investees, which we are accreting over the five-year useful life of the miners. There was no loss on contribution for the year ended December 31, 2023.
Current wording
Equity in losses of equity investees totaled $0.4 million for the year ended December 31, 2024 compared to losses of $2.5 million for the year ended December 31, 2023. Equity in losses of equity investees consists of our 49% share in the earnings (losses) generated by our three partially-owned mining sites, and the accretion of the basis differences in our investments in the equity investees that resulted from contributions of miners during the year ended December 31, 2022. We are accreting these basis differences over the five-year useful life of the miners.
Previous wording
Gains on fair value of bitcoin
Current wording
Unrealized gains on fair value of bitcoin
Previous wording
For the year ended December 31, 2023, we recorded a provision for income taxes of $3.6 million primarily driven by an increase in the valuation allowance resulting from an increase in net operating loss carryforwards generated in the current period. For the year ended December 31, 2022, we recorded a provision for income taxes of $1.8 million.
Current wording
For the year ended December 31, 2024, we recorded a provision for income taxes of $0.3 million as a result of projected income for the current year in the jurisdictions which we operate. For the year ended December 31, 2023, we recorded a benefit for income taxes of $3.6 million.
Previous wording
On August 3, 2023, the Company entered into a Controlled Equity Offering SM Sales Agreement (the “Sales Agreement”) with Cantor Fitzgerald & Co., Canaccord Genuity LLC, Needham & Company, LLC and Compass Point Research & Trading, LLC (each, an “Agent” and, together, the “Agents”), pursuant to which the Company may offer and sell, from time to time through or to the Agents, shares of its Common Stock, for aggregate gross proceeds of up to $250.0 million. As of December 31, 2023, we received gross proceeds on sales of 37,433,923 shares of common stock under the Prior Sales Agreement and the Sales Agreement of approximately $135.8 million at a weighted average price of $3.79.
Current wording
We have established an at-the-market sales agreement with Cantor Fitzgerald & Co., Canaccord Genuity LLC, Needham & Company, LLC, Compass Point Research & Trading, LLC, Keefe, Bruyette & Woods, Inc., Virtu Americas LLC, and BTIG, LLC (each, an “Agent” and, together, the “Agents”), pursuant to which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $725.7 million. For the year ended December 31, 2024, we received net proceeds on sales of 52.8 million shares of common stock under the Amended and Restated Sales Agreement of approximately $221.7 million (net of commissions and expenses) at an average net selling price of $4.20 per share. For more information on our at-the-market sales agreement and our at-the-market offerings, see “Note 15, Stockholders’ Equity — At-the-Market Sales Agreement.”
Previous wording
On August 14, 2023, we entered into a master loan agreement with Coinbase Credit, Inc., as lender, and Coinbase, Inc., as lending service provider. Pursuant to the master loan agreement, we established a secured line of credit up to $10.0 million (the “Credit Facility”). We will not incur commitment fees for unused portions of the Credit Facility. The borrowing rate on amounts drawn against the Credit Facility is determined on the basis of the Federal Funds Target Rate - Upper Bound, plus 2.5%, calculated daily based on a 365-day year and payable monthly for the duration of the loan. Borrowings under the Credit Facility are available on demand, open term, and collateralized by bitcoin transferred to the lending service provider’s platform. As of December 31, 2023, we have not drawn upon the Credit Facility.
Current wording
On August 14, 2023, we entered into a master loan agreement with Coinbase Credit, Inc., as lender, and Coinbase, Inc., as lending service provider. Pursuant to the master loan agreement, we currently have a secured line of credit up to $25.0 million (the “Coinbase Overnight Credit Facility”). We will not incur commitment fees for unused portions of the Coinbase Overnight Credit Facility. The borrowing rate on amounts drawn against the Coinbase Overnight Credit Facility is determined on the basis of the Federal Funds Target Rate - Upper Bound, plus 2.5%, calculated daily based on a 365-day year and payable monthly for the duration of the loan. Borrowings under the Coinbase Overnight Credit Facility are available on demand, open term, and collateralized by bitcoin transferred to the lending service provider’s platform. As of December 31, 2024 we had $25.0 million drawn from the Coinbase Overnight Credit Facility, $15 million of which was repaid prior to February 25, 2025. Additionally, we established a term loan facility with Coinbase with a limit of $35.0 million and maximum period of one year (the “Term Loan Facility”). Coinbase has the right to terminate loans under the Term Loan Facility if the price of bitcoin falls below $40,000. As of December 31, 2024, we were in compliance with the covenants under the Coinbase Overnight Credit Facility.
Previous wording
Management believes that our existing financial resources, combined with projected cash and bitcoin inflows from our data centers and our intent and ability to sell bitcoin received or earned, will be sufficient to enable us to meet our operating and capital requirements for at least 12 months from the date these unaudited condensed consolidated financial statements are issued.
Current wording
Management believes that our existing financial resources, combined with projected cash and bitcoin inflows from our data centers, our intent and ability to sell bitcoin received or earned, and our intent and ability to sell common stock through at-the-market offerings will be sufficient to enable us to meet our operating and capital requirements for at least 12 months from the date the consolidated financial statements included in this Annual Report are issued and the foreseeable future.
Previous wording
Net cash provided by investing activities increased by $226.7 million to $52.8 million for the year ended December 31, 2023 compared to net cash used in investing activities of $173.9 million for the year ended December 31, 2022. This was primarily due to a decrease of $154.0 million of deposits paid for miners and mining equipment, and an increase of $111.2 million in proceeds from sale of bitcoin, partially offset by a decrease of $50.2 million of capital distributions from equity investees.
Current wording
Cash flows used in investing activities increased by $245 million to $192.1 million of net cash used in investing activities for the year ended December 31, 2024 compared to $52.8 million of net cash provided by investing activities for the year ended December 31, 2023. This change primarily related to $129.1 million of deposits primarily related to new miner purchases, and a $33.6 million increase in contributions to equity investees related to capital expenditures and operations at the Bear and Chief facilities, partially offset by a $119.0 million increase in purchases of property and equipment related to building out the Black Pearl facility, and acquisition of the Barber Lake Facility.
Previous wording
Net cash provided by financing activities increased by $118.8 million to $115.7 million for the year ended December 31, 2023 from net cash used in financing activities of $3.1 million for the year ended December 31, 2022. The increase was primarily due to the cash proceeds from common stock issuances in the year ended December 31, 2023.
Current wording
Cash flows provided by financing activities increased by $97.8 million to $213.5 million net cash provided by financing activities for the year ended December 31, 2024 from $115.7 million net cash used in financing activities for the year ended December 31, 2023. This change was primarily driven by $89.3 million increase in proceeds from the issuance of common stock during the year ended December 31, 2024.
Previous wording
We also entered into a series of agreements with affiliates of Luminant, including the Lease Agreement dated June 29, 2021, with amendment and restatement on July 9, 2021, with amendment and restatement on July 9, 2021 and August 23, 2023 (as amended and restated, the “Luminant Lease Agreement”). The Luminant Lease Agreement leases a plot of land to us where our data center, ancillary infrastructure and electrical system (the “Interconnection Electrical Facilities” or “substation”) have been set up for the Odessa Facility. We entered into the Luminant Lease Agreement and the Luminant Purchase and Sale Agreement to build the infrastructure necessary to support our planned operations. Management determined that the Luminant Lease Agreement and the Luminant Purchase and Sale Agreement should be combined for accounting purposes under ASC 842 (collectively, the “Combined Luminant Lease Agreement”) and that amounts exchanged under the combined contract should be allocated to the various components of the overall transaction based on relative fair values.
Current wording
We also entered into a series of agreements with affiliates of Luminant ET Services Company LLC ( “Luminant”), including the Lease Agreement dated June 29, 2021, with amendment and restatement on July 9, 2021 (as amended and restated, the “Luminant Lease Agreement”). The Luminant Lease Agreement leases a plot of land to us where our data center, ancillary infrastructure and electrical system (the “Interconnection Electrical Facilities” or “substation”) have been set up for our Odessa Facility. We entered into the Luminant Lease Agreement and the Luminant Purchase and Sale Agreement to build the infrastructure necessary to support our planned operations. Management determined that the Luminant Lease Agreement and the Luminant Purchase and Sale Agreement should be combined for accounting purposes under ASC 842 (collectively, the “Combined Luminant Lease Agreement”) and that amounts exchanged under the combined contract should be allocated to the various components of the overall transaction based on relative fair values.
Previous wording
Our management determined that the Combined Luminant Lease Agreement contains two lease components; and the components should be accounted for together as a single lease component, because the effect of accounting for the land lease separately would be insignificant. Despite the lease commencement in November 2022, the Company had not been required by Luminant to make any lease payments for the substation prior to July 2023, therefore the Company accrued amounts due under the Combined Luminant Lease Agreement in accrued expenses and other current liabilities on its consolidated balance sheet.
Current wording
The Combined Luminant Lease Agreement commenced on November 22, 2022 and has an initial term of five years, with renewal provisions that are aligned with the Luminant Power Agreement. Financing for use of the land and substation is provided by Luminant affiliates. Despite lease commencement in November 2022, we had not been required by Luminant to make any lease payments for the substation prior to July 2023, therefore we accrued amounts due under the Combined Luminant Lease Agreement in accrued expenses and other current liabilities on its consolidated balance sheet.
Previous wording
On July 11, 2023, the Company entered into an amendment of the payment schedule to the Luminant Purchase and Sale Agreement, reflecting monthly installments of principal and interest totaling $19.7 million on an undiscounted basis, due over the remaining four-year period starting in July 2023. On August 23, 2023, the Company entered into a second amendment of the Luminant Lease Agreement, the terms of which included confirming the initial term will end on July 31, 2027. These amendments did not have a material impact on the Company’s consolidated financial statements.
Current wording
On August 23, 2023, we entered into a second amendment of the Luminant Lease Agreement, the terms of which included an amended payment schedule, reflecting monthly installments of principal and interest totaling $19.7 million on an undiscounted basis, due over the remaining four-year period starting in July 2023. This amendment did not have a material impact on our consolidated financial statements.
Previous wording
The Combined Luminant Lease Agreement commenced on November 22, 2022 and has an initial term of five years, with renewal provisions that are aligned with the Luminant Power Agreement. At the end of the lease term for the Interconnection Electrical Facilities, the substation will be sold back to Luminant’s affiliate, Vistra Operations Company, LLC at a price to be determined based upon bids obtained in the secondary market.
Current wording
At the end of the lease term for the Interconnection Electrical Facilities, the substation will be sold back to Luminant’s affiliate, Vistra Operations Company, LLC at a price to be determined based upon bids obtained in the secondary market.
Previous wording
We are providing supplemental financial measures for Adjusted Earnings that excludes the impact of depreciation and amortization, the non-cash change in fair value of derivative asset, the non-cash change in fair value of the warrant liability, nonrecurring gains and losses, deferred income taxes, and share-based compensation expense. This supplemental financial measure are not measurements of financial performance under accounting principles generally accepted in the United Stated (“GAAP”) and, as a result, these supplemental financial measures may not be comparable to similarly titled measures of other companies. Management uses these non-GAAP financial measures internally to help understand, manage, and evaluate our business performance and to help make operating decisions. We believe the use of these non-GAAP financial measures can also facilitate comparison of our operating results to those of our competitors.
Current wording
We are providing supplemental financial measures for Adjusted Earnings (Loss) and Adjusted Earnings (Loss) per share - diluted, in each case that exclude the impact of (i) the non-cash change in fair value of derivative asset, (ii) share-based compensation expense, (iii) depreciation and amortization, (iv) deferred income tax expense, (v) nonrecurring gains and losses and (vi) the non-cash change in fair value of warrant liability. These supplemental financial measures are not measurements of financial performance under accounting principles generally accepted in the United Stated (“GAAP”) and, as a result, these supplemental financial measures may not be comparable to similarly titled measures of other companies. Management uses these non-GAAP financial measures internally to help understand, manage, and evaluate our business performance and to help make operating decisions. We believe the use of these non-GAAP financial measures can also facilitate comparison of our operating results to those of our competitors by excluding certain items that vary in our industry based on company policy.
Previous wording
Non-GAAP financial measures are subject to material limitations as they are not in accordance with, or a substitute for, measurements prepared in accordance with GAAP. For example, we expect that share-based compensation expense, which is excluded from the non-GAAP financial measures, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers and directors. Similarly, we expect that depreciation and amortization will continue to be a recurring expense over the term of the useful life of the related assets. Our non-GAAP financial measures are not meant to be considered in isolation and should be read only in conjunction with our consolidated financial statements included elsewhere in this Annual Report, which have been prepared in accordance with GAAP. We rely primarily on such consolidated financial statements to understand, manage and evaluate our business performance and use the non-GAAP financial measures only supplementally.
Current wording
Non-GAAP financial measures are subject to material limitations as they are not in accordance with, or a substitute for, measurements prepared in accordance with GAAP. For example, we expect that share-based compensation expense, which is excluded from the non-GAAP financial measure, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers and directors. Similarly, we expect that depreciation and amortization will continue to be a recurring expense over the term of the useful life of the related assets. Our non-GAAP financial measures are not meant to be considered in isolation and should be read only in conjunction with our consolidated financial statements included elsewhere in this Annual Report, which have been prepared in accordance with GAAP. We rely primarily on such consolidated financial statements to understand, manage and evaluate our business performance and use the non-GAAP financial measures only supplementally.
Previous wording
The following are reconciliations of our Adjusted Earnings to the most directly comparable GAAP measures for the periods indicated (in thousands):
Current wording
The following is a reconciliation of our Adjusted Earnings to the most directly comparable GAAP measure for the periods indicated (in thousands):
Previous wording
Critical Accounting Policies, Significant Judgments and Use of Estimates
Current wording
Critical Accounting Policies, and Use of Estimates
Previous wording
The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the consolidated financial statements and the reported amounts of expenses during the reporting period. As of and for the year ended December 31, 2023, the most significant estimates inherent in the preparation of our consolidated financial statements include, but are not limited to, those related to equity instruments issued in share-based compensation arrangements, valuations of the derivative asset, determination of our asset retirement obligation and the valuation allowance associated with our deferred tax assets. Making estimates requires management to exercise significant judgment. It is at least reasonably possible that the estimate of the effect of a condition, situation or set of circumstances that existed at the date of the financial statements, which management considered in formulating its estimate, could change in the near term due to one or more future confirming events. Accordingly, the actual results could differ significantly from those estimates.
Current wording
The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the consolidated financial statements and the reported amounts of expenses during the reporting period. As of, and for the year ended December 31, 2024, the most significant estimates inherent in the preparation of our consolidated financial statements include, but are not limited to, those related to equity instruments issued in share-based compensation arrangements, valuations of the derivative asset, determination of our asset retirement obligations and the valuation allowance associated with our deferred tax assets. Making estimates requires management to exercise significant judgment. It is at least reasonably possible that the estimate of the effect of a condition, situation or set of circumstances that existed at the date of the financial statements, which management considered in formulating its estimate, could change in the near term due to one or more future confirming events. Accordingly, the actual results could differ significantly from those estimates.
Showing the first 40 of 44 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
Comparative Results for the Years Ended December 31, 2024 and 2023
Current report — wording carried from elsewhere
Our management determined that the Combined Luminant Lease Agreement contains two lease components; and the components should be accounted for together as a single lease component, because the effect of accounting for the land lease separately would be insignificant.