A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2025 · Filed May 7, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-11-07.
0001628280-24-046369
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-05-07.
0001628280-25-023220
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 273 previous paragraphs and 219 current paragraphs.
114 unchanged; 70 reworded; 27 added; 78 removed; 11 previous and 8 current paragraphs rearranged.
Tables are not compared: 27 previous and 17 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (27)
Current report
•issues relating to the implementation and effective use of technologies to support our business, including artificial intelligence;
Current report
Chesapeake Utilities Corporation is a Delaware corporation formed in 1947 with operations primarily in the Mid-Atlantic region, North Carolina, South Carolina, Florida and Ohio. We are an energy delivery company engaged in the distribution of natural gas, electricity and propane, the transmission of natural gas, the generation of electricity and steam, and in providing mobile compressed natural gas and other energy-related services to our customers.
Current report
Sustainability Across the Company
Current report
Our focus on sustainability is supported and shared across the organization by the dedication and efforts of our Board of Directors and its Committees, as well as the entrepreneurship and dedication of our team. As stewards of long-term enterprise value, our Board of Directors is committed to overseeing the sustainability of the Company, its environmental stewardship initiatives, its safety and operational compliance practices.
Current report
Gross Margin (GAAP) for the Regulated Energy segment for the quarter ended March 31, 2025 was $97.2 million, an increase of $3.9 million, or 4.2 percent, compared to the same period in 2024. The increase in gross margin largely reflects incremental margin from regulatory initiatives and infrastructure programs, organic growth in our natural gas distribution businesses, pipeline expansion projects, and increased customer consumption.
Current report
Our adjusted net income for the three months ended March 31, 2025 was $51.1 million, or $2.22 per share, compared to $46.8 million, or $2.10 per share, for the same quarter of 2024. Operating income for the first quarter of 2025 was $86.8 million, an increase of $7.2 million compared to the same period in 2024. Excluding transaction and transition-related expenses associated with the acquisition and integration of FCG, operating income increased $6.6 million or 8.2 percent compared to the prior-year period. Adjusted gross margin in the first quarter of 2025 was primarily driven by increased customer consumption resulting from year-over-year colder temperatures in our Mid-Atlantic and Ohio service territories, incremental margin from regulatory initiatives and infrastructure programs, increased demand for virtual pipeline services, natural gas organic growth and pipeline expansion projects. Higher operating expenses in the first quarter of 2025 were driven largely by the absence of a RSAM adjustment from FCG, increased payroll, benefits and other employee-related expenses, and higher depreciation attributable to growth projects. Additional expenses associated with facilities, maintenance and outside services, and higher insurance costs also contributed to the increase in operating expenses compared to the prior-year period.
Current report
(1)Transaction and transition-related expenses represent costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transition services, consulting, system integration, rebranding and legal fees.
Current report
(3) Reflects the impact of common shares issued under the DRIP and ATM program.
Current report
(1) Includes adjusted gross margin attributable to interim rates during 2024 and 2025. See additional information provided below.
Current report
Miami Inner Loop Pipeline Projects
Current report
In September 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of the Transportation Service Agreement with FCG for a series of projects that will enhance the infrastructure in Miami-Dade county. The proposed expansion consists of the development of several pipeline projects to support growth and support FCG's distribution system in the area and also enhance FCG's ability to obtain gas from various access points in the Miami-Dade county area. The expansion was approved in February 2025 and construction is expected to be complete in the second half of 2025. The expansion is expected to contribute adjusted gross margin of approximately $0.6 million in 2025 and $3.6 million annually thereafter.
Current report
CNG/RNG/LNG Transportation and Infrastructure
Current report
In December 2024, Eastern Shore submitted a filing with the FERC regarding a capital cost surcharge to recover capital costs associated with the replacement of existing Eastern Shore facilities because of mandated highway relocation projects as well as compliance with PHMSA regulation. The capital cost surcharge mechanism was approved in Eastern Shore's last rate case. In conjunction with the filing of this surcharge, a cumulative adjustment to the existing surcharge to reflect additional depreciation was included. The FERC issued an order approving the surcharge as filed in December 2024. The combined revised surcharge became effective January 1, 2025. In March 2025, Eastern Shore submitted an annual true-up filing with the FERC regarding a capital cost surcharge to recover capital costs associated with the replacement of existing Eastern Shore facilities because of mandated highway relocation projects as well as compliance with a PHMSA regulation. There was no impact to the currently effective surcharge as a result of this filing. The FERC issued an order approving the surcharge as filed effective April 1, 2025. For the three months ended March 31, 2025, there was $0.7 million of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately $5.7 million in 2025 and $7.1 million in 2026 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.
Current report
(2)Transaction and transition-related expenses represent costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transition services, consulting, system integration, rebranding and legal fees.
Current report
The following narrative discussion provides further detail and analysis of the significant items in the table above:
Current report
Interim Rates from Recent Rate Case Activities
Current report
Increased customer consumption, inclusive of weather-related consumption, contributed additional adjusted gross margin of $0.7 million for the three months ended March 31, 2025.
Current report
Operating Expenses
Current report
The following narrative discussion provides further detail and analysis of the significant items in the table above.
Current report
•Propane customer consumption -Adjusted gross margin increased by $4.2 million due to increased customer consumption resulting primarily from colder year-over-year weather in our Delmarva service territory.
Current report
CNG/RNG/LNG Transportation and Infrastructure
Current report
Operating Expenses
Current report
OTHER INCOME, NET
Current report
In November 2024, we established a new ATM program under which we may sell shares of our common stock up to an aggregate offering price of $100.0 million. This current ATM program is active through November 2027. For the three months ended March 31, 2025 and 2024, we received net proceeds of $19.8 million and $0.1 million, respectively, associated with shares issued under the direct stock purchase and waiver components of the DRIP as well as shares issued under our ATM program.
Current report
Recent International Trade Developments
Current report
Recently, significant trade tariffs were enacted and proposed to be enacted through presidential executive orders affecting products exported by a number of U.S. trading partners. While some tariffs scheduled to take effect were temporarily suspended, broad tariffs remain in effect with the possibility of additional tariffs being imposed. Trade tariffs are likely to increase the cost of imported materials and equipment, disrupt supply chains, drive economic volatility, and create adverse capital and credit market conditions. For example, the cost of pipes, meters, transformers, and specialized equipment we use in our capital projects may materially increase thus increasing our overall investment in and cost of these projects. We are currently unable to predict the effects of the recently imposed and possible future tariffs on our business.
Current report
Additionally, the current presidential administration has directed various federal agencies to further evaluate key aspects of U.S. trade policy and there has been ongoing discussion, commentary and actions regarding potential significant changes to U.S. trade policies, treaties and tariffs. In 2025, the President indicated that the United States would impose retaliatory measures with respect to jurisdictions that have or are likely to put in place tax rules that are extraterritorial or disproportionately affect U.S. companies. The likelihood of these changes being enacted or implemented is unclear. We are currently unable to predict whether such changes will occur and, if so, their ultimate impact on our businesses. We are also unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, which could include project delays, cost increases, and obstacles to the Company’s strategic plan execution. We are closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Removed paragraphs (78)
Previous report
Chesapeake Utilities is a Delaware corporation formed in 1947. We are a diversified energy company engaged, through our operating divisions and subsidiaries, in regulated energy, unregulated energy and other businesses. We operate primarily on the east coast of the United States and provide natural gas distribution and transmission; electric distribution and generation; propane gas distribution; mobile compressed natural gas services; steam generation; and other energy-related services.
Previous report
Sustainability Initiatives
Previous report
We continue to remain steadfast in regards to our sustainability commitments, including the following:
Previous report
•Maintaining a leading role in the journey to a lower carbon future in our service areas.
Previous report
•Continuing to promote a diverse and inclusive workplace and further the sustainability of the communities we serve.
Previous report
•Operating our businesses with integrity and the highest ethical standards.
Previous report
Transitioning from a single large sustainability report to these micro-reports will provide a steadier release of information throughout the year, including progress updates and new or expanded initiatives and programs. In addition to the micro-reports, the Company will publish investor-focused tables later this year.
Previous report
Acquisition of Florida City Gas
Previous report
On November 30, 2023, we completed the acquisition of FCG for $922.8 million in cash, which included working capital adjustments as defined in the agreement that were settled during the first quarter of 2024, pursuant to the previously disclosed stock purchase agreement with Florida Power & Light Company. Upon completion of the acquisition, FCG became a wholly-owned subsidiary of the Company and is included within our Regulated Energy segment. FCG serves approximately 120,000 residential and commercial natural gas customers across eight counties in Florida, including Miami-Dade, Broward, Brevard, Palm Beach, Hendry, Martin, St. Lucie and Indian River. Its natural gas system includes approximately 3,800 miles of distribution main and 80 miles of transmission pipe.
Previous report
In June 2023, FCG received approval from the Florida PSC for a $23.3 million total increase in base revenue in connection with its May 2022 rate case filing. The new rates, which became effective as of May 1, 2023, included the transfer of its SAFE program provisions from a rider clause to base rates, an increase in rates associated with a liquefied natural gas facility, and approval of FCG's proposed RSAM with a $25.0 million reserve amount. The RSAM is recorded as either an increase or decrease to accrued removal costs on the balance sheet, with a corresponding increase or decrease to depreciation and amortization expense. The impact of FCG's results from the acquisition date and effects on our liquidity are discussed further below and throughout Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations.
Previous report
Gross Margin (GAAP) for the Regulated Energy segment for the quarter ended September 30, 2024 was $79.2 million, an increase of $21.4 million, or 36.9 percent, compared to the same period in 2023. The increase in gross margin reflects incremental margin attributable to FCG, incremental margin from regulatory initiatives, and organic growth in our natural gas distribution businesses and continued pipeline expansion projects.
Previous report
Gross Margin (GAAP) for the Regulated Energy segment for the nine months ended September 30, 2024 was $248.8 million, an increase of $71.2 million, or 40.1 percent, compared to the same period in 2023. The increase in gross margin for the nine-month period is primarily attributable to the factors impacting the third quarter discussed above.
Previous report
Gross Margin (GAAP) for the Unregulated Energy segment for the nine months ended September 30, 2024 was $52.5 million, an increase of $5.2 million, or 10.9 percent, compared to the same period in 2023. Higher gross margin reflects higher contributions from our propane operations, an increased level of virtual pipeline services, and improved performance at Aspire.
Previous report
(2) Weighted average shares for the three and nine months ended September 30, 2024 reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG. See Notes 3 and 9 for additional details on the acquisition and related equity offering.
Previous report
Net income (GAAP) for the nine months ended September 30, 2024 was $81.9 million, or $3.66 per share, compared to $61.9 million, or $3.47 per share, for the same period in 2023. Net income for the nine months ended September 30, 2024 and 2023 included $2.3 million and $2.9 million, respectively, of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $19.4 million or 30.0 percent compared to the same period in the prior year.
Previous report
Our adjusted net income for the three months ended September 30, 2024 was $18.1 million, or $0.80 per share, compared to $12.2 million, or $0.69 per share, for the same quarter of 2023. The improvements in business unit operating results discussed below were partially offset by the effects of increased interest expense and common shares issued in connection with the acquisition of FCG. Operating income for the third quarter of 2024 was $40.9 million, an increase of $20.7 million compared to the same period in 2023. Excluding transaction and transition-related expenses associated with the acquisition and integration of FCG, operating income increased $17.6 million or 73.0 percent compared to the prior-year period. An increase in adjusted gross margin in the third quarter of 2024 was driven by contributions from the acquisition of FCG, incremental margin from regulatory initiatives, continued pipeline expansion projects, increased demand for virtual pipeline services and natural gas organic growth. Higher operating expenses in the third quarter of 2024 were largely associated with the operating expenses of FCG and increased payroll, benefits and other employee-related expenses compared to the prior-year period. Increases in depreciation, amortization and property taxes attributable to growth projects and FCG were partially offset by a $3.2 million RSAM adjustment from FCG and lower depreciation from our electric operations and Maryland natural gas division resulting from revised rates included in approved depreciation studies.
Previous report
(1) Weighted average shares for the quarter ended September 30, 2024 reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG.
Previous report
(2)Transaction and transition-related expenses represent costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding and legal fees.
Previous report
*** Reflects the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG and shares also issued in 2024.
Previous report
Our adjusted net income for the nine months ended September 30, 2024 was $84.2 million, or $3.76 per share, compared to $64.8 million, or $3.63 per share, for the same period of 2023. Adjusted net income for the nine months ended September 30, 2023 included a non-recurring gain of $1.3 million related to a reduction in the Pennsylvania state tax rate. The improvements in business unit operating results discussed below were partially offset by increased interest expense and common shares issued in connection with the acquisition of FCG. Operating income for the nine months ended September 30, 2024 was $161.3 million, an increase of $57.8 million compared to the same period in 2023. Excluding transaction and transition-related expenses associated with the acquisition and integration of FCG, operating income increased $57.0 million or 53.1 percent compared to the prior-year period. An increase in adjusted gross margin during the first nine months of 2024 was driven by contributions from the acquisition of FCG, incremental margin from regulatory initiatives, natural gas organic growth and continued pipeline expansion projects, higher customer consumption, and improvements from our unregulated businesses. Higher operating expenses during the first nine months of 2024 were largely associated with FCG, as well as higher insurance related costs compared to the prior-year period. These increases were partially offset by lower payroll, benefits and other employee-related expenses. Increases in depreciation and amortization expense attributable to growth projects and FCG were partially offset by an $8.9 million RSAM adjustment from FCG and lower depreciation from our electric operations and Maryland natural gas division due to revised rates resulting from approved depreciation studies.
Previous report
(1) Weighted average shares for the nine months ended September 30, 2024 reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG.
Previous report
(2)Transaction and transition-related expenses represent costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding and legal fees.
Previous report
*** Reflects the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG and shares also issued in 2024.
Previous report
(1) Includes adjusted gross margin during 2023 comprised of both interim rates and permanent base rates which became effective in March 2023.
Previous report
(2) Rate case application and depreciation study filed with the Maryland PSC in January 2024. See additional information provided below.
Previous report
(3) Rate case application and depreciation study filed with the Delaware PSC in August 2024. See additional information provided below.
Previous report
(4) Rate case application filed with the Florida PSC in June 2024. See additional information provided below.
Previous report
Southern Expansion
Previous report
Eastern Shore installed a new natural gas driven compressor skid unit at its existing Bridgeville, Delaware compressor station that provides 7,300 Dts of incremental firm transportation pipeline capacity. The project was placed in service in the fourth quarter of 2023. The project generated additional adjusted gross margin of $0.5 million and $1.2 million, respectively, for the three and nine months ended September 30, 2024, and is expected to produce adjusted gross margin of $2.3 million in 2024 and thereafter.
Previous report
Beachside Pipeline Expansion
Previous report
In June 2021, Peninsula Pipeline and FCG entered into a Transportation Service Agreement for an incremental 10,176 Dts/d of firm service in Indian River County, Florida, to support FCG's growth along the Indian River's barrier island. As part of this agreement, Peninsula Pipeline constructed approximately 11.3 miles of pipeline from its existing pipeline in Sebastian, Florida. The project went into service in April 2023. Subsequent to the acquisition of FCG, the agreement is now an affiliate agreement. The project generated additional adjusted gross margin of $0.6 million for the nine months ended September 30, 2024, and is expected to produce adjusted gross margin of approximately $2.4 million in 2024 and thereafter.
Previous report
Lake Wales Expansion
Previous report
In February 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 9,000 Dts/d of firm service in the Lake Wales, Florida area. The PSC approved the petition in April 2023 and Peninsula Pipeline completed the acquisition of an existing pipeline in May 2023 that is being utilized to serve both current and new natural gas customers. The project generated additional adjusted gross margin of $0.2 million for the nine months ended September 30, 2024, and is expected to contribute adjusted gross margin of approximately $0.5 million in 2024 and beyond.
Previous report
East Coast Reinforcement Projects
Previous report
Central Florida Reinforcement Projects
Previous report
In December 2019, the FERC approved Eastern Shore’s capital cost surcharge to become effective January 1, 2020. The surcharge, an approved item in the settlement of Eastern Shore’s last general rate case, allows Eastern Shore to recover capital costs associated with mandated highway or railroad relocation projects that required the replacement of existing Eastern Shore facilities. For the three and nine months ended September 30, 2024, there was $0.1 million and $0.3 million, respectively, of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately $3.2 million in 2024 and $4.4 million in 2025 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.
Previous report
Florida Natural Gas Base Rate Proceeding
Previous report
In May 2022, our legacy natural gas distribution businesses in Florida filed a consolidated natural gas rate case with the Florida PSC. The application included a request for the following: (i) permanent rate relief of approximately $24.1 million, effective January 1, 2023, (ii) a depreciation study also submitted with the filing; (iii) authorization to make certain changes to tariffs to include the consolidation of rates and rate structure across the businesses and to unify the Florida Natural Gas distribution business under FPU; (iv) authorization to retain the acquisition adjustment recorded at the time of the FPU merger in our revenue requirement; and (v) authorization to establish an environmental remediation surcharge for the purposes of addressing future expected remediation costs for FPU MGP sites. In August 2022, interim rates were approved by the Florida PSC in the amount of approximately $7.7 million on an annualized basis, effective for all meter readings in September 2022. The discovery process and related hearings were concluded during the fourth quarter of 2022 and briefs were submitted in the same quarter of 2022. In January 2023, the Florida PSC approved the application for consolidation and permanent rate relief of approximately $17.2 million on an annual basis. Actual rates in connection with the rate relief were approved by the Florida PSC in February 2023 with an effective date of March 1, 2023. The proceeding is expected to generate$17.2 million of total adjusted gross margin in 2024 and thereafter.
Previous report
Weather was not a significant factor to adjusted gross margin in the third quarter of 2024 compared to the same period in 2023.
Previous report
(1)Customer growth amounts for our legacy Florida operations include the effects of revised rates associated with the Company's natural gas base rate proceeding, but exclude the effects of FCG.
Showing the first 40 of 78 passages. Open the source sections for the rest.
Reworded paragraphs (70)
Previous wording
•the timing of certification authorizations associated with new capital projects and the ability to construct facilities at or below estimated costs;
Current wording
•the timing of certification authorizations associated with new capital projects and the ability to construct facilities at or below estimated costs, and within estimated timeframes;
Previous wording
•changes in the current political environment, including the effect of the U.S. Presidential election on the economy and consumer confidence;
Current wording
•changes in the current political environment, including the effects the Presidential administration could have on energy policy, the economy and consumer confidence;
Previous wording
•the economy in our service territories or markets, the nation, and worldwide, including the impact of economic conditions (which we do not control) on demand for natural gas, electricity, propane or other fuels;
Current wording
•the economy in our service territories or markets, the nation, and worldwide, including the impact of economic conditions (which we do not control) such as the risk and uncertainties associated with tariffs and trade wars, on demand for natural gas, electricity, propane or other fuels;
Previous wording
Our strategy is focused on growing earnings from a stable regulated energy delivery foundation and investing in related businesses and services that provide opportunities for returns greater than traditional utility returns. We seek to identify and develop opportunities across the energy value chain, with emphasis on midstream and downstream investments that are accretive to earnings per share, consistent with our long-term growth strategy and create opportunities to continue our record of top tier returns on equity relative to our peer group. Our growth strategy includes the continued investment and expansion of our regulated operations that provide a stable base of earnings, as well as investments in other related non-regulated businesses and services including sustainable energy initiatives. By investing in these related business and services, we create opportunities to sustain our track record of higher returns, as compared to a traditional utility.
Current wording
Our strategy is focused on growing earnings from a stable regulated energy delivery foundation and investing in related businesses and services that together provide opportunities for returns greater than traditional utility returns. We seek to identify and develop opportunities across the energy value chain, with emphasis on regulated midstream and downstream investments that are accretive to earnings per share and create opportunities to continue our record of top tier returns on equity relative to our peer group. The Company’s growth strategy includes the continued investment and expansion of the Company’s regulated operations that provide a stable base of earnings, as well as investments in other related non-regulated businesses and services including sustainable investments, such as renewable natural gas-related investments.
Previous wording
Currently, our growth strategy is focused on the following platforms, including:•Prudently deploying investment capital.◦Optimizing the earnings growth in our existing businesses, which includes organic growth, territory expansions, and new products and services as well as increased opportunities to transform the Company with a focus on people, process, technology and organizational structure.◦Identification and pursuit of additional pipeline expansions, including new interstate and intrastate transmission projects. ◦Growth of Marlin Gas Services’ CNG transport business and expansion into LNG and RNG transport services as well as methane capture.◦Identifying and undertaking additional strategic propane acquisitions that provide a larger foundation in current markets and expand our brand and presence into new strategic growth markets.◦Leveraging our current capabilities, including our integrated set of energy delivery businesses, to support and contribute to a more sustainable future.•Proactively managing our regulatory agenda.◦Driving regulatory initiatives that align with our growth strategy and investment plans.•Continually executing on our business transformation initiatives.◦Increased opportunities to transform the Company with a focus on people, process, technology and organizational structure.
Current wording
Currently, our growth strategy is focused on the following platforms, including:•Prudently deploying investment capital. ◦Optimizing the earnings growth in our existing businesses, which includes organic growth, territory expansions, and new products and services.◦Identification and pursuit of additional pipeline expansions, including new interstate and intrastate transmission projects.◦Growth of Marlin Gas Services’ CNG transport business and expansion into LNG and RNG transport services as well as methane capture.◦Identifying and undertaking additional strategic propane acquisitions that provide a larger foundation in current markets and expand our brand and presence into new strategic growth markets.◦Leveraging our current capabilities, including our integrated set of energy delivery businesses, to support and contribute to a more sustainable future.•Proactively managing our regulatory agenda.◦Driving regulatory initiatives that align with our growth strategy and investment plans.•Continually executing on our business transformation initiatives.◦Increased opportunities to transform the Company with a focus on people, process, technology and organizational structure.
Previous wording
These commitments guide our mission to deliver energy that makes life better for the people and communities we serve. They impact every aspect of the relationships we have with our stakeholders. In April of 2024, we unveiled our first in a series of sustainability micro-reports, with the first report focused on Safety and Reliability. The Safety and Reliability Report will be followed by at least two additional micro-reports. The second report, published in September 2024, focused on the Company’s environmental stewardship, including progress on environmental sustainability initiatives and mitigation of greenhouse gas emissions. The third micro-report, planned for distribution in early 2025, will focus on community impact, reporting on Diversity, Equity and Inclusion ("DEI") initiatives and investments in people, communities and customers.
Current wording
These commitments guide our mission to deliver energy that makes life better for the people and communities we serve. They impact every aspect of the relationships we have with our stakeholders. Beginning in 2024, we unveiled our first in a continuing series of sustainability micro-reports. We encourage our investors to review the micro-reports, as well as prior sustainability reports, which can be accessed on our website, and welcome feedback as we continue to enhance our sustainability disclosures.
Previous wording
The following tables reconcile Gross Margin, Net Income, and EPS, all as defined under GAAP, to our non-GAAP financial measures of Adjusted Gross Margin, Adjusted Net Income and Adjusted EPS for the three and nine months ended September 30, 2024 and 2023:
Current wording
The following tables reconcile Gross Margin, Net Income, and EPS, all as defined under GAAP, to our non-GAAP financial measures of Adjusted Gross Margin, Adjusted Net Income and Adjusted EPS for the three months ended March 31, 2025 and 2024:
Previous wording
(1)Operations & maintenance expenses within the condensed consolidated statements of income are presented in accordance with regulatory requirements and to provide comparability within the industry. Operations & maintenance expenses which are deemed to be directly attributable to revenue producing activities have been separately presented above in order to calculate Gross Margin as defined under U.S. GAAP.
Current wording
(1)Operations & maintenance expenses within the condensed consolidated statements of income are presented in accordance with regulatory requirements and to provide comparability within the industry. Operations & maintenance expenses which are deemed to be directly attributable to revenue producing activities have been separately presented above in order to calculate Gross Margin as defined under GAAP.
Previous wording
Gross Margin (GAAP) for the Unregulated Energy segment for the quarter ended September 30, 2024 was $7.1 million, an increase of $0.5 million, or 6.8 percent, compared to the same period in 2023. The increase in gross margin was primarily attributable to an increased level of virtual pipeline services.
Current wording
Gross Margin (GAAP) for the Unregulated Energy segment for the quarter ended March 31, 2025 was $39.9 million, an increase of $6.8 million, or 20.5 percent, compared to the same period in 2024. The increase in gross margin was primarily attributable to an increased level of customer consumption in our propane distribution business and greater demand for virtual pipeline services.
Previous wording
(1)Transaction and transition-related expenses represent non-recurring costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding, and legal fees.
Current wording
(1)Transaction and transition-related expenses represent non-recurring costs incurred attributable to the acquisition and integration of FCG including, but not limited to, transition services, consulting, system integration, rebranding, and legal fees.
Previous wording
Net income (GAAP) for the quarter ended September 30, 2024 was $17.5 million, or $0.78 per share, compared to $9.4 million, or $0.53 per share, for the same quarter of 2023. Net income for the three months ended September 30, 2024 included $0.6 million of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $5.9 million or 48.2 percent compared to the same period in the prior year.
Current wording
Net income (GAAP) for the quarter ended March 31, 2025 was $50.9 million, or $2.21 per share, compared to $46.2 million, or $2.07 per share, for the same quarter of 2024. Net income for the three months ended March 31, 2025 and 2024, included $0.2 million and $0.6 million, respectively, of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $4.3 million or 9.2 percent compared to the prior-year period.
Previous wording
Results of Operations for the Three and Nine Months Ended September 30, 2024
Current wording
Results of Operations for the Three Months Ended March 31, 2025
Previous wording
Key variances between the third quarter of 2023 and 2024 included:
Current wording
Key variances between the first quarter of 2024 and 2025 included:
Previous wording
We continuously pursue and develop additional projects and initiatives to serve existing and new customers, further grow our businesses and earnings, and increase shareholder value. The following table includes all major projects and initiatives that are currently underway or recently completed. Our practice is to add incremental margin associated with new projects and initiatives to this table once negotiations or details are substantially final and/or the associated earnings can be estimated. Major projects and initiatives that have generated consistent year-over-year adjusted gross margin contributions are removed from the table at the beginning of the next calendar year.
Current wording
We continuously pursue and develop additional projects and regulatory initiatives to serve existing and new customers, further grow our businesses and earnings, and increase shareholder value. The following table includes all major projects and initiatives that are currently underway or recently completed. Our practice is to add incremental margin associated with new projects and regulatory initiatives to this table once negotiations or details are substantially final and/or the associated earnings can be estimated. Major projects and initiatives that have generated consistent year-over-year adjusted gross margin contributions are removed from the table at the beginning of the next calendar year.
Previous wording
In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dts/d of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. This project was placed into service during July 2023 and generated additional adjusted gross margin of $0.3 million for the nine months ended September 30, 2024. We expect this extension to generate annual adjusted gross margin of $0.6 million in 2024 and thereafter.
Current wording
In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dts/d of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. This project was placed into service during July 2023 and generated consistent adjusted gross margin of $0.1 million for the three months ended March 31, 2025. We expect this extension to generate annual adjusted gross margin of approximately $0.6 million in 2025 and annually thereafter.
Previous wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of an amendment to its Transportation Service Agreement with FPU for a project that will support additional supply to communities in the St. Cloud, Florida area. The project is driven by the need to expand gas service to future communities that are expected in that area. Peninsula Pipeline will construct pipeline expansions that will allow FPU to serve the expected new growth. The expansion will provide FPU with an additional 10,000 Dts/d. The Florida PSC approved the project in May 2024, and it is expected to be complete in the fourth quarter of 2025. We expect this expansion to generate approximately $2.2 million of adjusted gross margin in 2025.
Current wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of an amendment to its Transportation Service Agreement with FPU for a project that will support additional supply to communities in the St. Cloud, Florida area. The project is driven by the need to expand gas service to future communities that are expected in that area. Peninsula Pipeline will construct pipeline expansions that will allow FPU to serve the expected new growth. The expansion will provide FPU with an additional 10,000 Dts/d. The Florida PSC approved the project in May 2024, and it is expected to be complete in the fourth quarter of 2025. We expect this expansion to generate annual adjusted gross margin of approximately $2.2 million in 2025 and $3.2 million annually thereafter.
Previous wording
In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement enables us to construct the project during the build-out of the community and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. The various phases of the project commenced in the first quarter of 2023, with construction on the overall project continuing through 2025. The petition was approved by the Florida PSC in November 2022. The project generated additional adjusted gross margin of $0.4 million and $0.7 million for the three and nine months ended September 30, 2024, respectively, and is expected to contribute adjusted gross margin of approximately $1.4 million in 2024 and $3.0 million thereafter.
Current wording
In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement enables us to construct the project during the build-out of the community and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. The petition was approved by the Florida PSC in November 2022. The various phases of the project commenced in the first quarter of 2023, with construction on the overall project continuing through 2025. The project generated additional adjusted gross margin of $0.3 million for the three months ended March 31, 2025 and is expected to contribute adjusted gross margin of approximately $3.0 million in 2025 and $4.3 million annually thereafter.
Previous wording
In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dts/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of existing Company owned propane community gas systems in Newberry was made in November 2023. The Florida PSC approved it in April 2024, and conversions of the community gas systems began in the second quarter of 2024. The project generated additional adjusted gross margin of $0.6 million and $0.7 million for the three and nine months ended September 30, 2024, and is expected to contribute adjusted gross margin of approximately $1.4 million in 2024 and $2.6 million thereafter.
Current wording
In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dts/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of existing Company-owned propane community gas systems in Newberry was made in November 2023. The Florida PSC approved it in April 2024, and conversions of the community gas systems commenced in the second quarter of 2024. The project generated additional adjusted gross margin of $0.6 million for the three months ended March 31, 2025, and is expected to contribute adjusted gross margin of approximately $2.6 million in 2025 and annually thereafter.
Previous wording
In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. Eastern Shore has requested certificate authorization by December 2024, with a target in-service date by the third quarter of 2025. In December 2023, the FERC issued its schedule for preparation of the Environmental Assessment ("EA"). In April 2024, the FERC issued their EA with no significant impacts noted. The EA comment period closed in May 2024, and Eastern Shore responded to the one adverse comment received.
Current wording
In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. In January 2025, the FERC approved the project, and construction is expected to be complete in the second quarter of 2026. The project is expected to contribute adjusted gross margin of approximately $9.1 million in 2026.
Previous wording
In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/d and 3,400 Dts/d, respectively. The Florida PSC approved the projects in March 2024. Construction is projected to be complete in the first and second quarters of 2025 for Boynton Beach and New Smyrna Beach, respectively. The projects are expected to contribute adjusted gross margin of approximately $5.1 million in 2025 and $6.3 million in 2026 and beyond.
Current wording
In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/d and 3,400 Dts/d, respectively. The Florida PSC approved the projects in March 2024. Construction is projected to be complete in the second and fourth quarters of 2025 for New Smyrna Beach and Boynton Beach, respectively. The projects generated additional adjusted gross margin of $0.5 million for the three months ended March 31, 2025 and are expected to contribute adjusted gross margin of approximately $4.7 million in 2025 and $6.0 million annually thereafter.
Previous wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system around the Plant City and Lake Mattie areas of Florida with an additional 5,000 Dts/d and 8,700 Dts/d, respectively. The Florida PSC approved the projects in May 2024. Completion of the projects is projected for the fourth quarter of 2024 for Plant City and the fourth quarter of 2025 for Lake Mattie. The projects are expected to contribute adjusted gross margin of approximately $0.1 million in 2024 and $2.0 million in 2025 and beyond.
Current wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system around the Plant City and Lake Mattie areas of Florida with an additional 5,000 Dts/d and 8,700 Dts/d, respectively. The Florida PSC approved the projects in May 2024. The Plant City project was completed in the fourth quarter of 2024, and the Lake Mattie project is projected to be completed during the fourth quarter of 2025. The completed project generated additional adjusted gross margin of $0.3 million for the three months ended March 31, 2025 and both projects are expected to contribute total adjusted gross margin of approximately $2.0 million in 2025 and $4.3 million annually thereafter.
Previous wording
In July 2024, we announced plans to extend Eastern Shore's transmission deliverability by constructing an additional 4.4 miles of six inch steel pipeline. The project will reinforce the supply and growth for our Delaware division distribution system and expand natural gas service further into Maryland for anticipated future growth. The project is estimated to be in service during the fourth quarter of 2024. The project is expected to contribute adjusted gross margin of approximately $0.3 million in 2024 and $1.9 million in 2025 and beyond.
Current wording
In July 2024, we announced plans to extend Eastern Shore's transmission deliverability by constructing an additional 4.4 miles of six inch steel pipeline. The project will reinforce the supply and growth for our Delaware division distribution system and expand natural gas service further into Maryland for anticipated future growth. This project was placed into service during the fourth quarter of 2024, generated additional adjusted gross margin of $0.5 million for the three months ended March 31, 2025, and is expected to contribute adjusted gross margin of approximately $1.9 million in 2025 and annually thereafter.
Previous wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of its Transportation Service Agreements with FCG for projects that will support the transportation of additional renewable energy supply to FCG. The projects, located in Florida’s Brevard, Indian River and Miami-Dade counties, will bring renewable natural gas produced from local landfills into FCG’s natural gas distribution system. Peninsula Pipeline will construct several pipeline extensions which will support FCG's distribution system in Brevard County, Indian River County, and Miami-Dade County. Benefits of these projects include increased gas supply to serve expected FCG growth, strengthened system reliability and additional system flexibility. The Florida PSC approved the petition at its July 2024 meeting with the projects estimated to be completed in the first half of 2025. These three renewable projects cumulatively are projected to generate adjusted gross margin of approximately $5.5 million in 2025.
Current wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of its Transportation Service Agreements with FCG for projects that will support the transportation of additional renewable energy supply to FCG. The projects, located in Florida’s Brevard, Indian River and Miami-Dade counties, will bring renewable natural gas produced from local landfills into FCG’s natural gas distribution system. Peninsula Pipeline will construct several pipeline extensions which will support FCG's distribution system in Brevard County, Indian River County, and Miami-Dade County. Benefits of these projects include increased gas supply to serve expected FCG growth, strengthened system reliability and additional system flexibility. The Florida PSC approved the petition at its July 2024 meeting with the projects estimated to be completed throughout 2025. These three renewable projects are projected to generate total adjusted gross margin of approximately $4.5 million in 2025 and $6.7 million annually thereafter.
Previous wording
In March 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of Firm Transportation Service Agreements with both FCG and FPU for a project that will support greater supply growth of natural gas service in southeast Florida. The project consists of the transfer of a pipeline asset from FCG to Peninsula Pipeline. Peninsula Pipeline will proceed to provide transportation service to both FCG and FPU using the pipeline asset, which supports continued customer growth and system reinforcement of these distribution systems. The Florida PSC approved the petition in July 2024.
Current wording
In March 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of Firm Transportation Service Agreements with both FCG and FPU for a project that will support greater supply growth of natural gas service in southeast Florida. The project consists of the transfer of a pipeline asset from FCG to Peninsula Pipeline. Peninsula Pipeline will proceed to provide transportation service to both FCG and FPU using the pipeline asset, which supports continued customer growth and system reinforcement of these distribution systems. The Florida PSC approved the petition in July 2024 and the project was completed in September 2024.
Previous wording
We estimate annual adjusted gross margin, including amounts attributable to the Full Circle Dairy and Noble Road projects described below, of approximately $14.0 million in 2024 and $15.0 million in 2025 for these transportation related services, with potential for additional growth in future years.
Current wording
We estimate annual adjusted gross margin, including amounts attributable to the Full Circle Dairy and Noble Road projects described below, of approximately $20.0 million in 2025 and $20.7 million in 2026 for these transportation related services, with potential for additional growth in future years.
Previous wording
In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205.0 million of capital expenditures projected to be spent over a 10-year period. For the three and nine months ended September 30, 2024, there was$0.9 million and$2.3 million, respectively, of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $3.6 million of adjusted gross margin in 2024 and $6.3 million in 2025.
Current wording
In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205.0 million of capital expenditures projected to be spent over a 10-year period. For the three months ended March 31, 2025, there was$0.9 million of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $6.9 million of adjusted gross margin in 2025 and $9.9 million in 2026.
Previous wording
In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Florida PSC approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205.0 million over a 10-year period. For the three and nine months ended September 30, 2024, there was$1.1 million and$2.2 million, respectively, of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $3.3 million of adjusted gross margin in 2024 and $6.5 million in 2025.
Current wording
In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Florida PSC approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205.0 million over a 10-year period. For the three months ended March 31, 2025, there was$1.3 millionof incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $8.5 million of adjusted gross margin in 2025 and $12.0 million in 2026.
Previous wording
In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed during the first quarter of 2022 and approved in the fourth quarter of 2022, with modifications, by the Florida PSC. In October 2024, the Florida PSC approved the Company's projected 2025 SPP costs for both capital and operating expenses. For the three and nine months ended September 30, 2024, this initiative generated additional adjusted gross margin of$0.4 million and $1.1 million, respectively, and is expected to generate$3.1 million of adjusted gross margin in 2024 and$5.6 million in 2025. We expect continued investment under the SPP going forward.
Current wording
In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed during the first quarter of 2022 and approved in the fourth quarter of 2022, with modifications, by the Florida PSC. In October 2024, the Florida PSC approved the Company's projected 2025 SPP costs for both capital and operating expenses. For the three months ended March 31, 2025, this initiative generated additional adjusted gross margin of$0.5 million and is expected to generate$5.9 million of adjusted gross margin in 2025 and$8.8 million in 2026. We expect continued investment under the SPP going forward.
Previous wording
In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we are seeking approval of the following: (i) permanent rate relief of approximately $6.9 million with an ROE of 11.5 percent; (ii) authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses which we anticipate will be called Chesapeake Utilities of Maryland, Inc.; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. In August 2024, the Maryland natural gas distribution businesses, the Maryland Office of Peoples' Counsel ("OPC") and PSC Staff reached a settlement agreement which provided for, among other things, an increase in annual base rates of $2.6 million. In September 2024, the Maryland Public Utility Judge issued an order approving the settlement agreement in part. The $2.6 million increase in annual base rates was approved and we will file a Phase II filing to determine rate design across the Maryland natural gas distribution businesses, consolidation of the applicable tariffs and recovery of technology costs. The outcome of the application is subject to review and approval by the Maryland PSC.
Current wording
In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, the “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we sought approval of the following: (i) permanent rate relief of approximately $6.9 million with a ROE of 11.5 percent; (ii) authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. In August 2024, the Maryland natural gas distribution businesses, the Maryland OPC and PSC staff reached a settlement which provided for, among other things, an increase in annual base rates of $2.6 million. In September 2024, the Maryland Public Utility Judge issued an order approving the related settlement agreement in part. The $2.6 million increase in annual base rates was approved and the Company filed a Phase II filing in November 2024 to determine rate design across the Maryland natural gas distribution businesses, consolidation of the applicable tariffs and recovery of technology costs. The hearing was held in March 2025, during which Phase II was approved, including an additional $0.9 million in revenue requirement for a total cumulative increase of $3.5 million. A final order was issued in April 2025 and included approval of the consolidation of the operations of CUC-Maryland Division, Sandpiper Energy, and Elkton Gas into one entity which was renamed and will operate as Chesapeake Utilities of Maryland, Inc. The proceeding is expected to result in additional adjusted gross margin of approximately $2.0 million in 2025 and $3.5 million annually thereafter.
Previous wording
In January 2024, our Maryland natural gas distribution businesses filed a joint petition for approval of their proposed unified depreciation rates with the Maryland PSC. A settlement agreement between the Company, PSC staff and the OPC was reached and the final order approving the settlement agreement went into effect in July 2024, with new depreciation rates effective as of January 1, 2023. The approved depreciation rates will result in an annual reduction in depreciation expense of approximately $1.2 million.
Current wording
In January 2024, our natural gas distribution businesses in Maryland filed a joint petition for approval of its proposed unified depreciation rates with the Maryland PSC. A settlement among the Company, PSC staff and the Maryland OPC was reached and the final order approving the related settlement agreement went into effect in July 2024, with new depreciation rates effective as of January 1, 2023. The approved depreciation rates resulted in an annual reduction in depreciation expense of approximately $1.2 million.
Previous wording
In August 2024, our Delaware natural gas division filed an application for a natural gas rate case with the Delaware PSC. In connection with the application, we are seeking approval of the following: (i) permanent rate relief of approximately $12.1 million with a ROE of 11.50 percent; (ii) proposed changes to depreciation rates which were part of a depreciation study also submitted with the filing; and (iii) authorization to make certain changes to tariffs. In September 2024, interim rates were approved by the Delaware PSC in the amount of $2.5 million on an annualized basis effective October 2024. The discovery process has commenced and hearing for the proceeding has been scheduled for May 2025. The outcome of the application is subject to review and approval by the Delaware PSC.
Current wording
In August 2024, our Delaware natural gas division filed an application for a natural gas rate case with the Delaware PSC seeking approval of the following: (i) permanent rate relief of approximately $12.1 million with a ROE of 11.5 percent; (ii) proposed changes to depreciation rates which were part of a depreciation study also submitted with the filing; and (iii) authorization to make certain changes to tariffs. Annualized interim rates were approved by the Delaware PSC in the amount of $2.5 million and became effective October 2024. A settlement among the Company, PSC staff and the Delaware Division of the Public Advocate was reached providing an annual revenue increase of $6.1 million, dividing the rate case into two phases and suspending the procedural schedule. The related, fully executed settlement agreement has been filed in the docket and awaits Delaware PSC approval, with a hearing scheduled in May 2025. Interim rates, set to recover the $6.1 million increase, went into effect in March 2025. A procedural schedule is pending in Phase II which will address tariff-related changes including rate design. For the three months ended March 31, 2025, there was$0.8 millionof incremental adjusted gross margin generated and final rates are expectedto generate approximately $4.7 million of adjusted gross margin in 2025 and $6.1 million in 2026.
Previous wording
In August 2024, our Florida Electric division filed a petition with the Florida PSC seeking a general base rate increase of $12.6 million with a ROE of 11.3 percent based on a 2025 projected test year. The outcome of the application will be subject to review and approval by the Florida PSC. In October 2024, annualized interim rates of approximately $1.8 million were approved with an effective date of November 1, 2024.
Current wording
In August 2024, our Florida Electric division filed a petition with the Florida PSC seeking a general base rate increase of $12.6 million with a ROE of 11.3 percent based on a 2025 projected test year. Annualized interim rates of approximately $1.8 million were approved with an effective date of November 1, 2024. In March 2025, the Florida PSC approved the permanent rate increase, but the order was subsequently protested. In May 2025, the Company reached a settlement agreement with the interested parties to resolve all outstanding issues in its current base rate case, which was filed as a joint motion for approval with the Florida PSC. This settlement allows for a total revenue increase of approximately $8.6 million on an annual basis. The Company anticipates this agreement to be on the Florida PSC hearing agenda for review and approval in June 2025. For the three months ended March 31, 2025, there was $0.7 million of incremental adjusted gross margin generatedand final rates are expectedto generate approximately $7.1 million of adjusted gross margin in 2025 and $8.6 million in 2026.
Previous wording
For the nine months ended September 30, 2024, higher consumption which includes the effects of colder weather conditions compared to the prior-year period resulted in a $1.2 million increase in adjusted gross margin. While temperatures through September 30, 2024 were colder than the prior-year period, they were approximately 13.2 percent and 13.1 percent warmer, respectively, compared to normal temperatures in our Delmarva and Ohio service territories.
Current wording
For the three months ended March 31, 2025, higher consumption which includes the effects of colder weather conditions, largely in our Ohio and Delmarva service areas, compared to the prior-year period resulted in a$5.5 million increase in adjusted gross margin.
Previous wording
The following table summarizes HDD and CDD variances from the 10-year average HDD/CDD ("Normal") for the three and nine months ended September 30, 2024 and 2023.
Current wording
The following table summarizes HDD and CDD variances from the 10-year average HDD/CDD ("Normal") for the three months ended March 31, 2025 and 2024.
Previous wording
The average number of residential customers served on the Delmarva Peninsula increased by approximately 3.9 percent, for the three and nine months ended September 30, 2024 while our legacy Florida Natural Gas distribution business increased by approximately 3.9 percent and 3.7 percent, respectively, during the same periods.
Current wording
The average number of residential customers served on the Delmarva Peninsula and at our Florida natural gas distribution business increased by approximately 4.0 percent and 3.0 percent, respectively, for the three months ended March 31, 2025.
Previous wording
Operating income for the Regulated Energy segment for the third quarter of 2024 was $43.9 million, an increase of $19.0 million or 76.4 percent, over the same period in 2023. Excluding transaction and transition-related expenses associated with the acquisition and integration of FCG, operating income increased $15.9 million or 55.3 percent compared to the same period in 2023. Higher operating income reflects incremental contributions from the acquisition of FCG, incremental margin from regulatory initiatives, continued pipeline expansion projects and organic growth in our natural gas distribution businesses. Excluding the transaction and transition-related expenses described above, the increase in total operating expenses of $10.4 million was largely attributable to FCG's operating expenses and increased payroll, benefits and other employee-related expenses. Increases in depreciation and amortization expense attributable to growth projects and FCG were offset by reductions related to revised rates from approved depreciation studies in our electric operations and Maryland natural gas division and a $3.2 million RSAM adjustment from FCG.
Current wording
Operating income for the Regulated Energy segment for the first quarter of 2025 was $60.5 million, an increase of $2.4 million or 4.1 percent, over the same period in 2024. Excluding transaction and transition-related expenses associated with the acquisition and integration of FCG, operating income increased $1.8 million or 3.1 percent compared to the same period in 2024. Higher operating income reflects incremental margin from regulatory initiatives and infrastructure programs, organic growth in our natural gas distribution businesses, and pipeline expansion projects. Excluding the transaction and transition-related expenses described above, the increase in total operating expenses of $7.8 million was largely attributable to the absence of a RSAM adjustment from FCG, increased payroll, benefits and other employee-related expenses, and higher depreciation attributable to growth projects.
Previous wording
Regulated infrastructure programs generated incremental adjusted gross margin of $1.8 million in the third quarter of 2024. The increase in adjusted gross margin was primarily related to Florida's GUARD program and FPU Electric's SPP. Refer to Note 5, Rates and Other Regulatory Activities, in the condensed consolidated financial statements for additional information.
Current wording
Regulated infrastructure programs generated incremental adjusted gross margin of $3.4 million in the first quarter of 2025. The increase in adjusted gross margin was primarily related to FCG's SAFE program, Florida's GUARD program, Eastern Shore's Capital Cost Surcharge program, and FPU Electric's SPP. Refer to Note 5, Rates and Other Regulatory Activities, in the condensed consolidated financial statements for additional information.
Previous wording
We generated additional adjusted gross margin of $4.2 million from natural gas customer growth. Adjusted gross margin increased by $2.6 million for our Florida Natural Gas distribution business and $1.6 million on the Delmarva Peninsula for the nine months ended September 30, 2024, as compared to the same period in 2023, due primarily to residential customer growth of 3.7 percent and 3.9 percent in Florida and on the Delmarva Peninsula, respectively.
Current wording
We generated additional adjusted gross margin of $2.2 million from natural gas customer growth. Adjusted gross margin increased by $1.5 million for our Florida natural gas distribution service territories and $0.7 million on the Delmarva Peninsula for the three months ended March 31, 2025, as compared to the same period in 2024, due primarily to residential customer growth of 3.0 percent and 4.0 percent in Florida and on the Delmarva Peninsula, respectively.
Previous wording
We generated increased adjusted gross margin of $1.5 million for the three months ended September 30, 2024 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.
Current wording
We generated increased adjusted gross margin of $2.2 million for the three months ended March 31, 2025 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.
Previous wording
Permanent rates associated with the Florida Natural Gas base rate proceeding, effective on March 1, 2023, contributed additional adjusted gross margin of $1.6 million for the nine months ended September 30, 2024. Refer to Note 5, Rates and Other Regulatory Activities, in the condensed consolidated financial statements for additional information.
Current wording
Interim rates associated with the Delaware natural gas rate case and Florida Electric base rate case contributed additional adjusted gross margin of $1.5 million for the three months ended March 31, 2025. Refer to Note 5, Rates and Other Regulatory Activities, in the condensed consolidated financial statements for additional information.
Showing the first 40 of 70 pairs. Open the source sections for the rest.
Rearranged current paragraphs (8)
Current report — wording carried from elsewhere
East Coast Reinforcement Projects (Boynton Beach and New Smyrna Beach)
Current report — wording carried from elsewhere
Central Florida Reinforcement Projects (Plant City and Lake Mattie)
Current report — wording carried from elsewhere
(1)Transaction and transition-related expenses represent costs incurred attributable to the acquisition and integration of FCG including, but not limited to,
Current report — wording carried from elsewhere
transition services, consulting, system integration, rebranding and legal fees.
Current report — wording carried from elsewhere
Items contributing to the quarter-over-quarter increase in operating expenses are listed in the following table:
Current report — wording carried from elsewhere
Our capital requirements reflect the capital-intensive and seasonal nature of our business and are principally attributable to investment in new plant and equipment, retirement of outstanding debt and seasonal variability in working capital. We rely on cash generated from operations, short-term borrowings, and other sources to meet normal working capital requirements and to temporarily finance capital expenditures, which we believe will provide sufficient liquidity to fund our current obligations, debt service requirements and capital expenditures over the next twelve months.
Current report — wording carried from elsewhere
In the table below, we have provided the range of our forecasted capital expenditures for 2025:
Current report — wording carried from elsewhere
•Net borrowings under the Revolver of $20.3 million;
Rearranged previous paragraphs (11)
Previous report — wording carried elsewhere
We encourage our investors to review the micro-reports, as well as prior sustainability reports, which can be accessed on our website, and welcome feedback as we continue to enhance our sustainability disclosures.
Previous report — wording carried elsewhere
Key variances between the nine months ended September 30, 2023 and September 30, 2024 included:
Previous report — wording carried elsewhere
*See the Major Projects and Initiatives table.
Previous report — wording carried elsewhere
** Transaction and transition-related expenses attributable to the acquisition and integration of FCG have been excluded from the Company’s non-GAAP
Previous report — wording carried elsewhere
measures of adjusted net income and adjusted EPS. See reconciliations above for a detailed comparison to the related GAAP measures.
Previous report — wording carried elsewhere
We generated additional adjusted gross margin of $1.0 million from natural gas customer growth. Adjusted gross margin increased by $0.6 million for our Florida Natural Gas distribution business and $0.4 million on the Delmarva Peninsula for the three months ended September 30, 2024, as compared to the same period in 2023, due primarily to residential customer growth of 3.9 percent both in Florida and on the Delmarva Peninsula.
Previous report — wording carried elsewhere
(1) Adjusted Gross Margin is a non-GAAP measure utilized by Management to review business unit performance. For a more detailed discussion on the differences between Gross Margin (GAAP) and Adjusted Gross Margin, see the Reconciliation of GAAP to Non-GAAP Measures presented above.
Previous report — wording carried elsewhere
Regulated infrastructure programs generated incremental adjusted gross margin of $4.4 million for the nine months ended September 30, 2024. The increase in adjusted gross margin was primarily related to Florida's GUARD program and FPU Electric's SPP. Refer to Note 5, Rates and Other Regulatory Activities, in the condensed consolidated financial statements for additional information.
Previous report — wording carried elsewhere
Natural Gas Transmission Service Expansions, including interim services
Previous report — wording carried elsewhere
We generated increased adjusted gross margin of $3.7 million for the nine months ended September 30, 2024 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.
Previous report — wording carried elsewhere
(1)Adjusted Gross Margin is a non-GAAP measure utilized by Management to review business unit performance. For a more detailed discussion on the differences between Gross Margin (GAAP) and Adjusted Gross Margin, see the Reconciliation of GAAP to Non-GAAP Measures presented above.