What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-11-07.
0001628280-24-046411
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OFCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-04-30.
0001628280-25-021160
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OFThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 189 previous paragraphs and 151 current paragraphs.
59 unchanged; 53 reworded; 35 added; 77 removed; 0 previous and 4 current paragraphs rearranged.
Tables are not compared: 13 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (35)
Current report
Policy proposals that have emerged in 2025 may also affect customer demand for power solutions. For example, changes to permitting rules could accelerate domestic fossil fuel infrastructure production, while proposals to limit environmental reviews under the National Environmental Policy Act and other statutes could incentivize investment in, and reduce the cost of, fossil fuels, including natural gas. At the same time, proposals to halt new permits for wind projects, particularly offshore wind, could slow renewable energy adoption and decrease the projected available supply of renewable energy. Bloom stands ready to meet these new opportunities with our low-emission Energy Server systems.
Current report
Co-locating Large Loads with Distributed Generation Configured as Islanded Microgrids are Gaining in Traction as Energy Solutions to Bypass Long Interconnection Queues and Transmission Upgrades
Current report
Our islanded microgrid solution allow data center and other customers the ability to skip the interconnection queue and start construction. A key to this solution is that our Be Flexible TM load following capability allows us to follow a customer’s variable loads without the need to import power from the transmission grid. We believe avoiding lengthy interconnection queues is key to unlocking time to power for our customers. Our islanded microgrid solution also creates ratepayer savings by reducing congestion charges resulting from constraints on the transmission grid and avoiding the need for network transmission investments and upgrades that may be allocated to all ratepayers. In addition to serving a single customer as a distributed generation microgrid solution, our technology can also be used by utilities as an energy transmission asset, helping them serve customers while avoiding the costs of building new transmission and distribution infrastructure.
Current report
Utilities are Turning to Distributed Energy Solutions to Decrease their Customers’ Time to Power
Current report
Our utility customers are recognizing the challenge of keeping pace with the growing demand for power. Aging infrastructure, coupled with transmission and distribution bottlenecks, are making it more difficult for utilities to integrate additional sources of energy to add capacity. Building new transmission and distribution infrastructure is expensive, takes many years, and would likely cause utility rates to increase. As demand for power continues to grow, utility companies are struggling to meet the soaring demand of data centers, while customers’ time to power becomes increasingly important. Utility companies are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. In 2024, we entered into multiple agreements with utilities, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. As we work to reduce our product costs, and with utility rates expected to rise due to significant infrastructure investments projected over the next five years to meet rapid demand growth, we expect our energy solutions to become more cost-competitive across more countries, communities, and industries worldwide.
Current report
Fuel Flexible Solutions Address Reliability Concerns as well as Near- and Long-term Sustainability Considerations
Current report
The impacts of climate change, including more severe and unpredictable weather events, have placed additional strain on aging utility grids and contributed to periods of power outages for those reliant on them. In addition, the recognition of the threat of climate change has led companies and governments to set ambitious emissions goals to reduce the release of carbon dioxide to the atmosphere. Large increases in demand for power are expected to challenge prevailing carbon reduction trajectories when large power users turn to conventional solutions to meet their needs. The Energy Server system is able to provide highly available power to displace dirtier and less efficient conventional combustion solutions like turbines and engines. Deeper decarbonization potential is enabled through fuel flexibility, combined heat and power (“CHP”) offerings and carbon capture utilization and storage (“CCUS”) capability. In addition to natural gas, our non-combustion power solutions are designed to run on biofuels or hydrogen, emit near-zero criteria pollutants, and use no water during steady state operation.
Current report
In the U.S., the ITC for fuel cells operating on non-zero-carbon fuels expired at the end of fiscal 2024. Although the Company and its customers utilized compliant safe harbor mechanisms to secure deployment of a certain dollar amount of Energy Server systems through 2028, the failure to extend the ITC for such fuel cells could materially impact U.S. bookings, revenue and gross margins in 2025 and beyond.
Current report
The IRA established a new clean electricity production credit and a clean electricity investment credit. Although the U.S. Treasury Department developed rules to implement credits and incentives for clean energy resources under President Biden’s administration, there is considerable uncertainty around whether, or the conditions under which such credits will be available for transactions involving our solutions in the future, including as a result of actions taken by President Trump’s administration. For information on the IRA and its impact on our business, see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Inflation Reduction Act of 2022 in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Current report
10%, we expect an impact on gross margin of approximately one percent for the fiscal year 2025. Changes in U.S. or international trade policies, including retaliatory measures, along with continued uncertainty surrounding such policies, could lead to further weakened business conditions for our industry, which may adversely impact our operations, including through increased supply chain challenges and project delays. The ultimate impact of tariffs may be of a different nature and/or of a larger magnitude than we anticipate.
Current report
Financing Constraints
Current report
As we grow our business globally and increase the size and number of customer orders, we will need to secure new customer financing options, the amount of financing available as well as the number of financing partners. As we offer an innovative new technology solution, obtaining new financing partners and available funds for customer financings often involves a rigorous and timely due diligence process on our technology, manufacturing and service capabilities. If we are unable to obtain adequate financing for our customers who prefer third-party financing over purchasing the Energy Server system directly, our revenue could be delayed or impacted. In addition, our ability to arrange financing for our products depends partly on the creditworthiness of our customers, and any deterioration in their credit ratings could impact that financing. When interest rates rise, the cost of financing for our customers also increases, and financing our installations may require a higher rate of return, which can place pressure on our margins.
Current report
As recently as 2022, we experienced impacts from labor shortages and challenges in hiring for our manufacturing facilities. While these constraints have since abated, and we reduced headcount as part of the Restructuring Plan adopted in September 2023, we may still experience difficulties with hiring and retention and may face additional labor shortages in the future. For details on the Restructuring Plan refer to Part II, Item 8, Note 12 —Restructuring in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024. In addition, the current inflationary environment has led to rising wages and labor costs as well as increased competition for labor.
Current report
For additional information, refer to Part I, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Sustainabilityin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Current report
Other than the loss of the ITC for fuel cells operating on non-zero-carbon fuels expired at the end of fiscal 2024, which occurred under President Biden’s administration, we have not experienced any impact from actions relating to the IRA taken by President Trump administration.
Current report
Delivery and Installation
Current report
For information on delivery and installation of our Energy Server systems, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Delivery and Installationin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Current report
Product revenue increased by $58.5 million, or 38.1%, for the three months ended March 31, 2025, as compared to the prior year period. This increase was primarily due to the increase in demand for our products, improved pricing from site repowerings and improved pricing due to volume mix shift from international to domestic revenue.
Current report
Installation revenue increased by $22.2 million, or 194.0%, for the three months ended March 31, 2025, as compared to the prior year period. The increase was primarily driven by the timing of achieving key project milestones on sites requiring installations by us in the first quarter of fiscal year 2025.
Current report
Service revenue decreased by $2.9 million, or 5.2%, for the three months ended March 31, 2025, as compared to the prior year period. The decrease was primarily driven by (1) a reduction in revenue from part of our established install base, as specified by our revenue contracts with customers, and (2) an increase of $0.7 million in product performance guarantees as a result of Energy Server systems fleet depreciation, partially offset by growth in maintenance contracts associated with our fleet of Energy Server systems.
Current report
Electricity revenue increased by $12.9 million, or 92.1%, for the three months ended March 31, 2025, as compared to the prior year period. The increase was predominantly due to a one-time settlement of a customer contract after redeploying assets for our partner, partially offset by lower straight-line electricity revenue amortization as a result of repowering of Managed Services agreements.
Current report
Total cost of revenue increased by $40.1 million, or 20.3%, for the three months ended March 31, 2025, as compared to the prior year period. The increase was driven by a $18.0 million increase in costs of installation revenue, a $23.8 million increase in cost of product revenue, and a $2.0 million increase in cost of electricity revenue, partially offset by a $3.6 million decrease in cost of service revenue.
Current report
Cost of product revenue increased by $23.8 million, or 20.6%, for the three months ended March 31, 2025, as compared to the prior year period. The increase in cost of product revenue was primarily driven by the increase in demand for our products. This increase was partially offset by our continued efforts to reduce material, labor, and overhead costs through enhanced manufacturing processes and increased automation.
Current report
Cost of electricity revenue increased by $2.0 million, or 20.4%, for the three months ended March 31, 2025, as compared to the prior year period. This increase was predominantly due to redeploying assets for our partner to enable a one-time settlement of a customer contract.
Current report
Total Gross Profit
Current report
Product gross profit increased by $34.7 million in the three months ended March 31, 2025, as compared to the prior year period. The increase was primarily driven by (1) an increase in demand for our products, improved pricing from site repowerings and improved pricing due to volume mix shift from international to domestic revenue, and (2) our continued efforts to reduce material, labor, and overhead costs through enhanced manufacturing processes and increased automation.
Current report
Installation Gross Profit (Loss)
Current report
Service Gross Profit (Loss)
Current report
Electricity Gross Profit
Current report
Electricity gross profit increased by $11.0 million in the three months ended March 31, 2025, as compared to the prior year period. This increase was predominantly due to a one-time settlement of a customer contract after redeploying assets for our partner.
Current report
Sales and marketing expenses increased by $8.7 million in the three months ended March 31, 2025, as compared to the prior year period. The increase was primarily driven by (1) an increase in employee compensation and benefits of $6.0 million, predominantly due to an increase in stock-based compensation and bonus expenses, and (2) an increase in consulting, advisory and other professional services costs of $1.9 million.
Current report
General and administrative expenses increased by $6.9 million in the three months ended March 31, 2025, as compared to the prior year period. This increase was primarily driven by (1) an increase in employee compensation and benefits of $6.6 million, predominantly due to stock-based compensation expenses, principally related to new awards for our Chief Executive Officer (the “CEO”) granted on December 18, 2024, partially offset by a decrease in bonus expenses, (2) an increase in computer equipment maintenance expenses of $1.1 million, and (3) an increase in depreciation expenses of $0.7 million. The overall increase was partially offset by a decrease in office and other general and administrative expenses of $1.9 million, primarily related to corporate insurance costs and factoring and financing fees.
Current report
Interest expense is primarily due to our debt held by third parties and interest expense related to managed services agreements.
Current report
Income Tax Provision (Benefit)
Current report
•Modification of Performance-Based Stock Unit Awards;
Removed paragraphs (77)
Previous report
Our technology, invented in the U.S., is one of the most advanced electricity and hydrogen producing technologies on the market today. Our fuel-flexible Bloom Energy Servers can use biogas, hydrogen, natural gas, or a blend of fuels to create resilient, sustainable and cost-predictable power at higher efficiency levels than traditional, combustion-based resources. Our enterprise customers include some of the largest multinational corporations in the world. We also have relationships with some of the largest utility companies in the U.S. and the Republic of Korea, with a growing presence in various international markets. The solid oxide platform that powers our fuel cells can be used to create hydrogen with our Bloom Electrolyzer, and hydrogen is increasingly recognized as a critically important decarbonization tool in the energy transition.
Previous report
We continue to innovate our products to offer energy solutions to our customers. In February 2024, we announced our Be Flexible TM offering which introduced load following capabilities to enable customers and utilities to meet variable electricity load and demand. Our Bloom Energy Servers allow us to provide energy solutions for customers, as our products are designed to work with existing carbon capture utilization and storage (“CCUS”) and combined heat and power (“CHP”) technologies. CCUS can mitigate emissions from natural gas as the Energy Server generates a relatively pure stream of CO 2 that can be used or sequestered. CHP allows the exhaust heat generated by the Energy Server to be channeled and made available for use, further increasing the efficiency of the system.
Previous report
For further information about Bloom Energy, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, Overview — Description of Bloom Energy section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Previous report
Impact of Climate Change and Sustainability Goals
Previous report
The impacts of climate change, including more severe and unpredictable weather events, have placed further strain on aging utility grids and led to periods of power outages for those reliant on the grid. In addition, the recognition of the threat of climate change has led companies and governments to set ambitious emissions goals to reduce their carbon footprints. These emissions goals are expected to be difficult to meet using currently available renewable energy technologies such as wind and solar power. As the world transitions to lower-carbon energy sources, natural gas has been increasingly recognized as a necessary bridge fuel. Using natural gas, Bloom Energy Server can produce electricity efficiently without combustion. CCUS and CHP can further improve efficiency and lower carbon emissions of using Bloom Energy Servers compared to marginal generation resources on the grid.
Previous report
Increasingly, customers want a zero-carbon solution for power, and, although our power solutions are designed to run on biofuels or hydrogen (in addition to natural gas) and help our customers achieve their sustainability goals, these fuels continue to have very limited availability and, for most customers, are not yet economical. This customer desire for zero-carbon solutions today, combined with the current lack of availability of zero-carbon fuels, is adversely impacting our power solution selling opportunities.
Previous report
Delayed Project
Previous report
In the fourth quarter of 2022, we entered into a Power Purchase Agreement (“PPA”) contract for the sale of electricity to a customer for three greenfield sites that were at various stages of development (the “Project”). The first site was expected to be operational with power by the third quarter of 2024. We sold 73 megawatts of the Energy Servers to a distributor with the expectation that the distributor would support installation on the Project and install the Energy Servers at the three Project sites. For site specific reasons, in the first quarter of 2024, the end customer decided not to deploy the Energy Servers at the originally selected sites and is looking at alternative sites for deployment. In the interim, the end customer has commenced payments under the PPA and has agreed to continue such payments for the earlier of the full term of the PPA or deployment of the Energy Servers. We will continue to assist the distributor in its efforts to deploy the Energy Servers at the alternative installation sites selected by the end customer. Notwithstanding this, depending on the length of the installation delay, the distributor may decide to reduce future orders or cancel existing orders until the Energy Servers are deployed, and either action could materially and adversely affect our product revenue and the timing of the associated cash flows in 2024.
Previous report
For information on other factors affecting our performance, including:
Previous report
•Customer Financing Constraints, and
Previous report
see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, Overview — Certain Factors Affecting our Performance section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Previous report
On March 27, 2024, Bloom, Bloom SK Fuel Cell, LLC, a joint venture in the Republic of Korea with SK ecoplant (the “Korean JV”), and SK ecoplant entered into the Third Amendment to the Amended and Restated Preferred Distribution Agreement, as amended (the “Third ARPDA”). The Third ARPDA adds SK Eternix Co., Ltd., as an additional distributor of Bloom products and ancillary equipment in the Republic of Korea.
Previous report
For information about our sustainability initiatives, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, Overview— Environmental, Social and Governance (“ESG”)section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Previous report
On March 29, 2024, we received notification from the Internal Revenue Service (the “IRS”) of the acceptance of our application for a Qualifying Advanced Energy Project Credit of up to $75.3 million. The application for qualifying advanced energy project credit allocation under Internal Revenue Code Section 48C(e) for the manufacturing facility in Fremont, California (the “Facility”), was submitted by Bloom on December 21, 2023. After a technical review of Bloom’s Section 48C(e) application, the Department of Energy provided a recommendation to the IRS to grant a $75.3 million credit allocation for the Facility. The approval is subject to satisfaction of the underlying certification requirements, including the prevailing wage and apprenticeship requirements, within two years from the date of the application acceptance.
Previous report
We raised cash and supplemented liquidity by issuing the 3% Green Convertible Senior Notes due June 2029 (the “3% Green Notes due June 2029”) in the second quarter of 2024, as well as through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3% Green Convertible Senior Notes due June 2028 (the “3% Green Notes due June 2028”) in the second quarter of 2023. We expanded our warehouse space in Delaware and California to store more inventory to meet the anticipated increase in demand. If this increase in demand does not materialize to the degree we anticipated, our liquidity and financial condition may be adversely impacted.
Previous report
On May 29, 2024, we issued the 3% Green Notes due June 2029 in an aggregate principal amount of $402.5 million due June 2029, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $12.1 million and other issuance costs of $0.7 million, resulting in net proceeds of $389.7 million. On May 29, 2024, we used approximately $141.8 million of the net proceeds from this issuance to repurchase $115.0 million, or 50%, of the outstanding principal amount of our 2.5% Green Convertible Senior Notes due August 2025 (the “2.5% Green Notes”) in privately negotiated transactions. The repurchase amount equaled 122.6% of the principal amount repurchased plus related accrued and unpaid interest.
Previous report
For further information on issuance of 3% Green Notes due June 2029 and partial repurchase of our 2.5% Green Notes, please see Part I, Item 1, Note 7 —Outstanding Loans and Security Agreements.
Previous report
The portion of acceptances attributable to each purchase alternative in the three and nine months ended September 30, 2024, and 2023 was as follows:
Previous report
Key Operating Metrics
Previous report
For a description of the key operating metrics, we use to evaluate business activity, to measure performance, to develop financial forecasts and to make strategic decisions, see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, Key Operating Metrics section in our Annual Report on Form 10-K for the year ended December 31, 2023.
Previous report
Product Acceptances
Previous report
The product and megawatt acceptances in the three and nine months ended September 30, 2024, and 2023 were as follows:
Previous report
Product accepted decreased approximately by 76 systems, or 9.3%, for the three months ended September 30, 2024, as compared to the prior year period, which is equivalent to 7 megawatts. Acceptance volume decrease was driven by the repowering of 2015 ESA Project Company, LLC (“PPA V”), which was sold in the third quarter of fiscal year 2023.
Previous report
Product accepted decreased approximately by 43 systems, or 2.2%, for the nine months ended September 30, 2024, as compared to the prior year period, which is equivalent to 4 megawatts. Acceptance volume decrease was driven by (1) the repowering of PPA V, which was sold in the third quarter of fiscal year 2023, and (2) the effect of a large transaction in the first and the second quarter of fiscal year 2023 that did not repeat in fiscal year 2024.
Previous report
The increase in acceptances of 189 megawatts achieved for the nine months ended September 30, 2024, was added to our installed base and, therefore, increased our total megawatts accepted, net, from 1,241 megawatts as of December 31, 2023, to 1,430 megawatts as of September 30, 2024.
Previous report
Costs Related to Our Products
Previous report
Total product related costs for the three and nine months ended September 30, 2024, and 2023 was as follows:
Previous report
Product costs of product accepted decreased by $58 per kilowatt, or 2.8%, and by $55 per kilowatt, or 2.6%, for the three and nine months ended September 30, 2024, respectively, as compared to the prior year period. The decrease in costs was primarily driven by our continued efforts to reduce material costs, implement cost reduction programs with our vendors, improved processes, automation at our manufacturing facilities, and reduced labor and overhead costs through restructuring programs executed in fiscal year 2023. The decrease was partially offset by changes in the mix of the solutions delivered.
Previous report
Period costs of manufacturing related expenses decreased by $8.1 million, or 47.2%, and by $5.6 million, or 11.9%, for the three and nine months ended September 30, 2024, respectively, as compared to the prior year period. Our period costs of manufacturing-related expenses decreased primarily as a result of ongoing cost reduction efforts and manufacturing efficiencies.
Previous report
Installation costs on product accepted increased by $165 per kilowatt, or 51.7%, and by $102 per kilowatt, or 25.3%, for the three and nine months ended September 30, 2024, respectively, as compared to the prior year period. Each customer site is unique, and installation costs can vary due to a number of factors, including site complexity, size, and location of gas, among other factors. As such, installation on a per kilowatt basis can vary significantly from period to period. For the three and nine months ended September 30, 2024, this increase in cost was primarily driven by the change in the mix of sites requiring Bloom installation.
Previous report
Our Business Evolution and Key Operating Metrics
Previous report
We are in the process of re-evaluating the key operating metrics we have historically used to measure our operating performance, and we expect this re-evaluation to be completed by the time we file our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous report
We are increasingly transitioning from selling our Energy Server as a standalone product to offering energy and hydrogen solutions to our customers. This trend is occurring across our offerings, as we find ways to deliver additional value to customers. We are solving critical problems for our customers and bringing new technologies to the market. This requires us to expand the scope of what is delivered beyond our conventional “electricity-only” solution to electricity, heat, carbon capture, storage, and molecules solutions. As a result of these developments, our Energy Server product (electricity-only power module) cost is becoming a widely varying fraction of the overall value of the energy solution we provide, and trends in costs and selling prices per kilowatt are less representative of our overall business performance. In management’s view, this trend will only continue to get stronger in the future. Specific highlights of our business evolution to offering energy and hydrogen solutions include:
Previous report
•Time to power. Customers are looking for energy solutions that can enable their business in a timely manner. In order to speed up installation and quickly get sites powered, we are now shipping solutions that are pre-packaged Energy Servers mounted on pre-fabricated skids in the factory. This minimizes the sitework that is needed and allows us to deploy the solution quickly, giving the customer a faster path to power. This effort requires more factory costs, but it reduces installation costs and increases value delivered to the customer.
Previous report
•Power Density solutions. We have improved our power density for certain customer sites by factory building pre-packaged stackable Energy Servers. This increases costs and requires us to add more hardware at the factory but delivers more value to customers who have space constraints.
Previous report
•Bloom Electrolyzer. In addition to our energy solutions, we have begun offering hydrogen solutions that feature our Bloom Electrolyzer. The Bloom Electrolyzer is designed to provide scalable and cost-effective hydrogen solutions based on the same solid oxide platform as our Energy Servers. The Bloom Electrolyzer produces hydrogen rather than electricity, and a kilowatt measure attributable to an electrolyzer is not equivalent to a kilowatt measure attributable to a solid oxide fuel cell. Costs of solutions designed to produce hydrogen could vary widely depending on project specifics.
Previous report
•Combined heat and power. The CHP solution allows customers to take advantage of waste heat, boosting the efficiency and economic return of the project. The CHP solution, however, requires significant infrastructure to deliver the waste heat from the Energy Server to the customer. This infrastructure cost is additive to reported product costs but allows us to deliver more value to customers. Moreover, a kilowatt of heat does not have the same cost or value as a kilowatt of electricity. We optimize our solutions depending on the relevant project requirements, and as a result our cost structure can vary widely depending on the solution provided.
Previous report
•Carbon Capture solutions. Our technology is well-suited to carbon capture when running on natural gas, the exhaust is a concentrated stream of CO 2 relative to other energy generation technologies. This means our solution requires less energy and hardware to separate out the CO 2 for capture and sequestration. However, this does require additional infrastructure onsite to separate the CO 2 from the rest of the exhaust and to condition it appropriately for the application. This infrastructure cost is additive to reported product costs but allows us to deliver more value to customers by delivering low carbon power.
Previous report
•Microgrid solutions. As the reliability of the electrical grid becomes more challenging in multiple geographies, many of our customers desire to rely primarily or solely on Bloom solutions, in the form of grid-connected or islanded microgrids. The cost of the ancillary equipment associated with establishing a microgrid is significant, and thus further skews cost metrics measured on a per kilowatt basis.
Previous report
As our business has evolved to meet the energy needs of the market, ‘product accepted’ is less relevant as an operating metric for our business due to the nature of the complexity in the solutions offered. For example, a solution offered to a customer who wants islanded power, which creates additional reliability, would carry additional costs due to the microgrids and other ancillary equipment needed to provide the solution. Similarly, a customer utilizing our Be Flexible TM solution would need ancillary equipment such as storage. These factors can distort the cost or revenue per kilowatt metrics.
Showing the first 40 of 77 passages. Open the source sections for the rest.
Reworded paragraphs (53)
Previous wording
This Quarterly Report on Form 10-Q contains“forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are based on current expectations, estimates, and projections about our industry, management’s beliefs, and certain assumptions made by management. For example, forward-looking statements include, but are not limited to, our expectations regarding our products and services, including our aim to provide resilient products, business strategies, including capital expenditures to expand production capacity and sources of funding for capital expenditures, our expanded strategic partnership with SK ecoplant, operations, supply chain (including any direct or indirect effects from the Russia-Ukraine war, armed conflict in the Middle East, or geopolitical developments in China), new markets, government incentive programs including the scheduled expiration of the Investment Tax Credit at the end of 2024, impact of the Inflation Reduction Act of 2022 (the “IRA”) and transferability of tax credits on our business and the financing market for installations of our products, impact of new foreign tax rules on our financial statements, growth of the hydrogen market, sufficiency of our cash and our liquidity, the potential to engage in equity or debt financing transactions, future capital requirements and use of proceeds, our commitments or contingencies, and statements under “Key Macro Trends.” All statements contained in this Quarterly Report on Form 10-Q other than statements of historical fact are forward-looking statements. Forward-looking statements may be identified by words such as “future,” “anticipates,” “believes,” “estimates,” “expects,” “intends,” “designs,” “plans,”“predicts,” “targets,” “forecasts,” “will,” “would,” “could,” “can,” “may,” “aim,” “potential,” “mission,” “commit” and similar terms. These statements are based on the beliefs and assumptions of our management based on information currently available to management at the time they are made. Such forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results, outcomes and the timing of certain events to differ materially from future results or outcomes expressed or implied by such forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those factors discussed in the section titled “Risk Factors” included in Part I, Item 1A of our Annual Report on Form 10-K for the fiscal year ended December 31, 2023, and in our other filings with the U.S. Securities and Exchange Commission (“SEC”). You should review these risk factors for a more complete understanding of the risks associated with an investment in our securities. Such forward-looking statements speak only as of the date of this report. We disclaim any obligation to update any forward-looking statements made in this Quart…
Excerpt shortened here; the source contains the full paragraph.
Current wording
This Quarterly Report on Form 10-Q contains “forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are based on current expectations, estimates, and projections about our industry, management’s beliefs, and certain assumptions made by management. For example, forward-looking statements include, but are not limited to, our plans and expectations regarding future financial results, including our expectations regarding: our ability to expand into and be successful in new markets, including the hydrogen market; our expanded strategic partnership with SK ecoplant Co., Ltd.; statements about our supply chain (including any direct or indirect effects from the Russia-Ukraine war, armed conflict in the Middle East, or geopolitical developments in China); operating results; the sufficiency of our cash, our cash flows from operating activities and our liquidity and our ability to obtain financing; projected costs and cost reductions; development of new products and improvements to our existing products; our manufacturing capacity and manufacturing costs; the adequacy of our agreements with our suppliers; legislative actions and regulatory and environmental compliance; impact of the IRA, including expiration of the Investment Tax Credit with respect to fuel cells running on non-zero carbon fuels and transferability of tax credits on our business; competitive position; management’s plans and objectives for future operations; our ability to comply with debt covenants or cure defaults, if any; our ability to repay our debt obligations as they come due; trends in average selling prices; the success of our customer financing arrangements and ability to secure financiers; capital expenditures; warranty matters; outcomes of litigation; our exposure to foreign exchange, interest and credit risk; general business and macroeconomic conditions in our markets including inflationary pressure; trade policies including tariffs; industry trends; the impact of changes in government incentives; risks related to cybersecurity breaches, privacy and data security; the likelihood of any impairment of project assets, long-lived assets and investments; trends in revenue, cost of revenue and gross profit (loss); trends in operating expenses including research and development expense, sales and marketing expense and general and administrative expense and expectations regarding these expenses as a percentage of revenue; future deployment of our Bloom Energy Server systems, Bloom Electrolyzers, and other solutions; our ability to expand our business, including our ability to secure large data center customers; our ability to increase efficiency of our products; our ability to market our products successfully in connection with the global energy transition and shifting attitudes around climate change; our business strategy and plans and our objectives for future operations; a…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
Our mission is to make clean, reliable energy affordable for everyone in the world. We created the first large-scale, commercially viable solid oxide fuel-cell based power generation platform that empowers businesses, essential services, critical infrastructure and communities to responsibly take charge of their energy.
Current wording
Our mission is to make clean, reliable energy affordable for everyone in the world. We developed the first large-scale, commercially viable solid oxide fuel cell based power generation platform that empowers businesses, essential services, critical infrastructure and communities to responsibly take charge of their energy. For additional information, refer to Part I, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Overview, sub-section Description of Bloom Energyin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
The global energy transition to a zero-carbon environment has created new challenges and opportunities for utilities, suppliers of energy solutions, and customers. Shifts and uncertainty in market and regulatory dynamics and corporate and governmental policies are currently impacting the selling process and extending sales cycles and timelines for our products. Increasing electricity rates, decreasing energy reliability, and delays in the development of transmission infrastructure and grid interconnection have led to increased customer interest in our power solutions. At the same time, natural gas supply and pricing concerns due to geopolitical stresses and resulting market changes as well as increasing focus on sustainability targets have led to increased caution from potential customers. Increasing demand for power has forced utilities, states and countries to revisit less clean sources of baseload and intermediate power, which our technology is designed to replace, in an attempt to ensure energy reliability. This supply and demand mismatch globally has threatened energy’s security, reliability, availability, and increased its cost.
Current wording
The global energy transition towards a net-zero environment has created new challenges and opportunities for utilities, suppliers of energy solutions, and customers. Shifts and uncertainty in market and regulatory dynamics and corporate and governmental policies are currently impacting the selling process and impacting sales cycles and timelines for our products. Increasing electricity rates, decreasing energy security and reliability, and delays in the development of transmission infrastructure and grid interconnection as well as other time-to-power challenges have led to increased customer interest in our power solutions. At the same time, ongoing natural gas supply and pricing concerns due to geopolitical stresses, as well as customers’ interest in meeting sustainability targets, have led to increased caution from potential customers in their buying decision for energy solutions. Increasing demand for power has forced utilities, states and countries to revisit less clean sources of baseload and intermediate power, which our technology is designed to replace. This supply and demand mismatch globally has threatened energy security, reliability, and availability.
Previous wording
Bloom enables customers to address these energy market challenges by offering fuel flexible solutions that are designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection needs and availability, redundant back up power requirements, cost requirements, and sustainability profiles. Even in those situations where the time to power from the utility is measured in years because of the need to build out energy transmission infrastructure, these factors still may impact a customer’s buying decision.
Current wording
Bloom enables customers to address these energy market challenges by offering fuel flexible solutions designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection needs and availability, redundant back up power requirements, cost requirements, and sustainability profiles. These factors may influence a customer’s decision to pursue an alternative power solution like ours — even in cases where utility interconnection timeliness span years – because the total cost to interconnect, including the build-out of energy transmission infrastructure, often remains unknown until all interconnection studies are completed.
Previous wording
Many data center customers and other large power users have signed exclusivity arrangements with their utilities, and this often creates a more complicated dynamic for them to move to a behind-the-meter solution. The rising cost of natural gas, increases in gas distribution rates, limited availability of natural gas supply, as well as disruptions to the world’s gas markets, has increased the cost of our power solutions for customers and, in certain cases where there is a lack of fuel supply, a complete inability to operate the systems. In the U.S., the lack or slow development of pipeline infrastructure is impacting the timing of customers being able to take advantage of our power solution opportunities. In certain jurisdictions in the U.S. and Europe, natural gas bans prevent the use of our power solutions unless alternative fuels are available.
Current wording
Many data center customers and other large power users have signed exclusivity arrangements with their utilities, and this often creates a more complicated dynamic for them to move to an on-site solution. Rising natural gas costs in some regions, increases in gas distribution rates, limited availability of supply, and disruptions in global gas markets have increased the cost of our power solutions for customers and, in certain cases where fuel is unavailable, have resulted in a complete inability to operate the systems. In the U.S., the lack of, or slow development in, pipeline infrastructure has, in the past, impacted the timing of customers being able to take advantage of our power solution opportunities. In certain jurisdictions in the U.S. and Europe, natural gas bans have prevented the use of our power solutions unless alternative fuels are available.
Previous wording
In addition, many of our potential data center and industrial customers are pursuing greenfield opportunities where the development cycle is long and laden with permitting requirements, and the uncertainty of these factors is leading to a more difficult customer decision-making process and longer sales cycles. Data center greenfield projects require significant investments in real estate, facility costs, and technology, among other elements, in addition to the investment in our power solutions, and the timing and sequencing of those investments is largely outside of our control.
Current wording
In addition, many of our potential data center and industrial customers are pursuing greenfield opportunities where the development cycle is long and laden with permitting requirements, and the uncertainty of these factors is leading to a more complex customer decision-making process and longer sales cycles. Data center greenfield projects require significant investments in real estate, facility costs, and technology, among other elements, in addition to the investment in our power solutions, and the timing and sequencing of those investments is largely outside of our control.
Previous wording
Demand for power has continued to significantly outpace available power generation supply from the grid, with the need for power becoming more acute in 2024. The transition towards the electrification of everything, including in a wide range of commercial and consumer products, has strained aging and unreliable power grids across the globe. The expanding use of AI has led to the expansion of existing data centers and plans for new greenfield data centers. The resulting increase in demand for power from Al-related companies has further reduced available supply from the grid and has led non-AI-related companies to consider on-site distributed power, including Bloom Energy Servers, to meet their power needs.
Current wording
Demand for power has continued to significantly outpace available grid-based generation supply, with the need for additional power becoming increasingly acute in recent periods. Key factors driving the increasing demand include the transition towards the electrification of transportation and buildings, the rapid adoption of AI that has led to the expansion of existing data centers and plans for new greenfield data centers, and Federal incentives for domestic manufacturing, including semiconductor and battery production. These factors, along with economic growth, have placed significant stress on grid supply and have led companies to consider on-site distributed power, including Bloom Energy Server systems, to meet their power needs.
Previous wording
In part because of the increases in demand for power, time to power has increased for companies seeking to connect new projects to the grid. According to the Lawrence Berkeley National Lab, U.S. interconnection queue delays have experienced significant growth, with a forty percent year over year increase in 2022. The typical project interconnection process for large scale projects grew to five years in 2022 compared to three years in 2015 and two years in 2008. Bloom Energy Servers can be configured as fully-islanded, microgrid solutions that are not interconnected to the grid, which can often provide a customer power in months instead of years. Our fully-islanded microgrid solutions can provide power on-site, without the need for costly transmission and distribution systems required by electrical grids. We are seeing greater interest in fully-islanded microgrid solutions among data center customers because of these interconnection-related delays. If a customer desires back up power or a “grid parallel” solution in combination with the Bloom microgrid, required interconnection studies and lengthy interconnection queues remain, eroding the time to power value proposition.
Current wording
The increase in power demand, has, in part, elevated the importance of time to power. According to a study published in April 2024 by the Lawrence Berkeley National Laboratory, the time from initiating a request for interconnection to the grid to the start of commercial operations has more than doubled from less than two years during the period from 2000-2007, to more than four years from 2018-2023. Bloom Energy Server systems can be configured as on-site fully-islanded, microgrid solutions that are not interconnected to the grid, which often can provide a customer power in months instead of years. Many utilities have informed data center and manufacturing customers that they cannot interconnect for a period of years because the utility has no power available to serve a customer’s needs, thus making the Bloom Energy Server system an attractive alternative. In addition, our fully-islanded microgrid solutions can provide power on-site, without the need for costly transmission and distribution system upgrades that often are required before a customer can interconnect to the electrical grid. We are seeing greater interest in fully-islanded, microgrid solutions among data center customers because of these interconnection-related delays. If a customer desires back up power or a “grid parallel” solution in combination with the Bloom Energy Server system, required interconnection studies and lengthy interconnection queues may remain, eroding the time to power value proposition.
Previous wording
In 2023, the South Korean government moved to a new, government-run bidding process for fuel cell purchases, which has impacted and may continue to impact demand for our power solutions. In the U.S., absent Congressional action, the Investment Tax Credit (“ITC”) for fuel cells running on a non-zero carbon fuel is currently scheduled to expire at the end of fiscal year 2024. To date, Congress has not renewed the ITC. Because 2024 is a presidential election year in the U.S., it is possible Congress may be unable to achieve an extension of the ITC for commercial fuel cell purchasers this year. If the ITC is not extended for fuel cells, U.S. bookings, revenue and gross margins could be materially impacted. In 2024, the expiration of the ITC could increase demand for ITC-compliant sales of our Energy Servers due to customer desire to secure ITC for their projects through safe harboring. However, if our customers or project-level investors prove reluctant to make sufficient cash outlays in 2024 for purchases of Energy Servers for future projects, our sales could be negatively impacted. The Inflation Reduction Act of 2022 (“IRA”) established a new clean electricity production credit and a clean electricity investment credit. There is considerable uncertainty around whether, or the conditions under which, such credits will be available for transactions involving our Energy Servers. In addition, delays in adoption of Renewable Fuel Standard regulations in the U.S. for the use of biogas to generate electricity for electric vehicles, along with minimal governmental focus on utilization of biogas outside of use by methane-fueled vehicles, have created uncertainty in prospects for broader biogas availability for industrial uses, including our power solutions. In addition, in most jurisdictions, air permits and various land use permits are required for installation of our solutions over a certain amount of megawatts, and generally the length of time to obtain these permits increased, while the level of certainty of issuance has decreased and if issued, the cost of compliance requirements can be cost prohibitive. We have experienced a reluctance in certain states to issue permits for gas generation equipment. Even if issued, states may require a blend of costly renewable fuels or other measures to advance climate goals. In Ireland, which is a large data center market, a directive from the Minister of the Department of the Environment, Climate and Communications to restrict grid connections to data centers and other large power users, along with a halt in high-pressure gas installations has delayed our selling activities.
Current wording
In addition, delays in adoption of Renewable Fuel Standard regulations in the U.S. for the use of biogas to generate electricity for electric vehicles, along with limited governmental focus on the utilization of biogas outside of use by methane- fueled vehicles, have created uncertainty around the broader availability of biogas for industrial uses, including our power solutions. Furthermore, in most jurisdictions, air permits and various land use permits are required for installation of our solutions above certain megawatt thresholds. The time required to obtain these permits has generally increased, while the certainty of approval has decreased, and when issued, the cost of meeting compliance requirements can be cost prohibitive. We have experienced a reluctance in certain states to issue permits for gas generation equipment. Even if issued, states may require a blend of costly renewable fuels or other measures to advance climate goals.
Previous wording
The imbalance between power demand and supply has contributed to utilities seeking alternative sources of power to supply to their end customers. Utilities have been unable to meet this demand through the deployment of renewable sources of energy such as solar and wind power. Bloom Energy Servers can be installed at the utility’s point of distribution or directly on the customer’s site. The energy produced by Bloom Energy Servers can be utilized by utilities to provide power to a specific customer or customers or may be used by customers generally. Increasing the supply of available power can allow utilities to encourage end customers to remain in their current locations rather than relocating to areas where power is more available.
Current wording
The imbalance between power demand and supply has contributed to utilities seeking alternative sources of power to supply to their end customers. Utilities have been unable to meet this demand through the deployment of renewable sources of energy such as solar and wind power. Bloom Energy Server systems can be installed at the utility’s point of distribution or directly on the customer’s site. The energy produced by our systems can be utilized by utilities to provide power to a specific customer or customers or may be used by customers generally. As demand for power continues to grow, and time to power becomes increasingly important, utilities are exploring alternative means of producing and supplying energy to their end customers, including using our Energy Server systems. In 2024, we entered into multiple agreements with utilities, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. Increasing the supply of available power can allow utilities to encourage end customers to remain in their current locations rather than relocating to areas where power is more available. In addition, co-locating our Energy Server systems on-site with large loads, can enable a utility to provide power to a large energy user without impacting its rate base and providing the onsite power as an islanded microgrid can avoid interconnection studies and wait times.
Previous wording
The significant governmental interest, investment, and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on the supply of hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision stage, and an even smaller fraction have been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be significantly extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could limit our customers’ ability to transport hydrogen from the point of production to the point of consumption. Additionally, U.S. Treasury Department rules surrounding the use of market-based renewable energy could make it more difficult for hydrogen projects to acquire energy needed to access the Production Tax Credit.
Current wording
The interest, investment, and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on the supply of hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision stage, and an even smaller fraction has been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be significantly extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could limit our customers’ ability to transport hydrogen from the point of production to the point of consumption. Additionally, while U.S. Treasury Department rules regarding the use of market-based renewable energy have been clarified, hurdles remain that could hinder the large-scale development of hydrogen projects. Uncertainty also exists as potential changes may be pursued by the new U.S. federal administration and Congress.
Previous wording
Many of the factors discussed above have lengthened the selling cycles for our products and we have experienced delays in our anticipated bookings as a result. Our revenue, margins, and cash flow in any given year are largely dependent on bookings during the prior year. Historically, the majority of our bookings have occurred in the second half of the year, with a significant portion occurring in the fourth quarter. That trend did not continue to the same degree in 2023. If a substantial portion of our anticipated bookings continue to be delayed, our future revenue, margins and cash flow could be materially adversely impacted.
Current wording
Many of the factors discussed above have lengthened the selling cycles for our products and we have experienced delays in our anticipated bookings as a result. Our revenue, margins, and cash flow in any given year depend on bookings from prior years as well as current-year bookings. Historically, the majority of our bookings have occurred in the second half of the year, with a significant portion in the fourth quarter, and we expect this trend to continue in 2025. However, if a substantial portion of our anticipated bookings is delayed beyond our expectations, our revenue, margins, and cash flow for the relevant period could be materially adversely impacted.
Previous wording
We continue to see effects from global supply chain tightness due to the current inflationary environment, war in Ukraine, and trade tensions between the U.S. and China. We are not aware of, and do not expect any significant direct impact on our business or supply chain from the armed conflict in Israel and neighboring areas. While we have not experienced any significant component shortages to date, we are facing pressures from inflation. These dynamics could worsen as a result of continued geopolitical instability or escalation of current military conflicts or trade tensions. We are also reliant on third party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. In the event we are unable to mitigate the impacts of delays and/or price increases in raw materials and components, it could delay the manufacturing and installation of, and increase the costs of, our products, which would adversely impact our cash flows and results of operations, including our revenues and gross margin. We expect these supply chain challenges to continue in the short term.
Current wording
We continue to see effects from global supply chain tightness due to the current inflationary environment, war in Ukraine, and trade tensions between the U.S. and China. We are not aware of, and do not expect any significant direct impact on our business or supply chain from the armed conflict in Israel and neighboring areas. While we have not experienced any significant component shortages to date, we are facing pressures from inflation. These dynamics could worsen as a result of continued geopolitical instability or escalation of current military conflicts or trade tensions. The new U.S. federal administration has implemented new tariffs on all trade partners. Our supply chain is not dependent on China, but significant tariffs on imports from other countries where we do source materials could impact our costs. At the tariffs present levels of
Previous wording
Installations and Maintenance of Energy Servers
Current wording
Installations and Maintenance of our Products
Previous wording
In the third quarter of 2024, our installation projects experienced some delays relating to, among other things, permitting, utility delays, and access to customer facilities. However, these delays did not significantly impact our revenue. If we are delayed in or unable to perform maintenance, our previously installed Energy Servers would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. As we seek larger projects with sophisticated counterparties, customers have sought to impose more stringent performance requirements on us. If we experience a significant increase of product failure in the future, our service expense may increase and we may fail to achieve the performance commitments to our customers, which could result in warranty and/or guaranty claims. Additionally, product failure and service costs may increase as we initially deploy new applications for our Energy Server, including Be Flexible load following, CCUS, and CHP. Further, due to the nature of our Energy Servers, if we are unable to replace worn parts in accordance with our standard maintenance schedule, we may incur higher costs in the future. During the nine months ended September 30, 2024, we experienced no significant delays in servicing our Energy Servers.
Current wording
In previous years, our installation projects experienced delays related to, among other factors, permitting, utility coordination, and access to customer facilities. We have not experienced any delays in 2025 in either our installation or maintenance activities. If we are delayed in or unable to perform maintenance, our previously installed products would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. If we experience a significant increase of product failure in the future, our service expense may increase and we may fail to achieve the performance commitments to our customers, which could result in warranty and/or guaranty claims. Additionally, product failure and service costs may increase as we initially deploy new applications for our Energy Server system, including Be Flexible TM load following, CCUS, and CHP.
Previous wording
For information on the strategic investment with SK ecoplant Co., Ltd. (“SK ecoplant”, formerly known as SK Engineering & Construction Co., Ltd.), a subsidiary of the SK Group, see Part II, Item 8, Note 1 —Nature of Business, Liquidity and Basis of Presentation, Liquidity section and Note 17 —SK ecoplant Strategic Investmentin our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Current wording
For information on the strategic investment with SK ecoplant, see Part II, Item 8, Note 17 —SK ecoplant Strategic Investmentin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
In April 2024, we released our 2023 Sustainability Report, Transforming Energy for the Digital Age (the “Sustainability Report”), using generally accepted sustainability frameworks and standards, including alignment with Sustainability Accounting Standards Board standards and the Task Force on Climate-related Financial Disclosures recommendations. In addition, the Sustainability Report also utilized certain Global Reporting Initiative standards and was mapped against the United Nations Sustainable Development Goals. We plan to issue a sustainability report on an annual basis.
Current wording
In April 2025, we released our 2025 Impact Report, previously referred to as our Sustainability Report, Transforming Energy for the Digital Age (the “Impact Report”), using generally accepted sustainability frameworks and standards, including alignment with Sustainability Accounting Standards Board standards and the Task Force on Climate-related Financial Disclosures recommendations. In addition, the Impact Report also utilized certain Global Reporting Initiative Standards and was mapped against the United Nations Sustainable Development Goals. We plan to issue an impact report on an annual basis.
Previous wording
The Sustainability Report can be found on our website athttps://www.bloomenergy.com/sustainibility. Website references throughout this document are provided for convenience only, and the content on the referenced websites is not incorporated by reference into this report.
Current wording
The Impact Report can be found on our website athttps://www.bloomenergy.com/sustainibility. Website references throughout this document are provided for convenience only, and the content on the referenced websites is not incorporated by reference into this report.
Previous wording
For information on the IRA, which was signed into law on August 16, 2022, and its impact on our business, see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, Inflation Reduction Act of 2022 section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Current wording
For information on the IRA, which was signed into law on August 16, 2022, and its impact on our business, see Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Inflation Reduction Act of 2022 in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
As of September 30, 2024, we had cash and cash equivalents of $495.7 million. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $466.7 million. We seek to maintain these balances with high credit quality counterparties, regularly monitor the amount of our credit exposure to any one issuer and diversify our investments in order to minimize our exposure.
Current wording
As of March 31, 2025, and December 31, 2024, we had unrestricted cash and cash equivalents of $794.8 million and $802.9 million, respectively. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $759.5 million and $749.4 million as of March 31, 2025, and December 31, 2024, respectively. We seek to maintain these balances with high-credit-quality counterparties, regularly monitor our credit exposure to any single issuer, and diversify our investments to minimize risk.
Previous wording
As of September 30, 2024, we had $1,122.9 million of recourse debt, $4.6 million of non-recourse debt, and $8.8 million of other long-term liabilities. As of September 30, 2024, $114.1 million and $1,013.3 million of our debt was classified as short-term and long-term, respectively. For a complete description of our outstanding debt, please see Part I, Item 1, Note 7 —Outstanding Loans and Security Agreements.
Current wording
As of March 31, 2025, we had $1,126.7 million of recourse debt, $4.1 million of non-recourse debt, and $9.4 million of other long-term liabilities. As of March 31, 2025, $114.6 million and $1,016.2 million of our debt were classified as short-term and long-term, respectively. As of December 31, 2024, we had $1,124.7 million of recourse debt, $4.1 million of non-recourse debt, and $9.2 million of other long-term liabilities. As of December 31, 2024, $114.4 million and $1,014.4 million of our debt were classified as short-term and long-term, respectively. For a complete description of our outstanding debt, please see Part II, Item 8, Note 17 — Outstanding Loans and Security Agreements in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
The combination of our cash and cash equivalents and cash flow to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or are not received in a timely manner to satisfy our near-term or future cash needs, we may require additional capital from equity or debt financings to fund our operations, our manufacturing capacity, product development, and market expansion requirements and to timely respond to competitive market pressures or strategic opportunities, among other things. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the nine months ended September 30, 2024, we factored $184.2 million of accounts receivable. However, we may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may place limits on our financial and operating flexibility. Although currently we do not have any floating-rate notes on our balance sheet, rising interest rates may increase our overall cost of capital. If we raise additional funds through further issuances of equity or equity-linked securities, our existing stockholders could suffer dilution in their percentage ownership of us, and any new securities we issue could have rights, preferences, and privileges senior to those of holders of our common stock.
Current wording
The combination of our cash and cash equivalents and cash flow expected to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or not received in a timely manner to meet our near-term or future liquidity needs, we may require additional equity or debt financing to fund our operations, manufacturing capacity, product development, and market expansion initiatives, as well as to respond to competitive pressures or strategic opportunities. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the three months ended March 31, 2024, we factored $80.7 million of accounts receivable, and there were no factoring arrangements during the three months ended March 31, 2025. However, we may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may limit on our financial and operational flexibility. Although we currently do not have any floating-rate notes on our balance sheet, our overall cost of capital may increase if interest rates rise and we refinance our fixed-rate convertible notes. If we raise additional funds through the issuance of equity or equity-linked securities, our existing stockholders could experience dilution in their ownership percentage, and any new securities may have rights, preferences, and privileges senior to those of our common stock.
Previous wording
Our future capital requirements depend on many factors, including our rate of revenue growth, the timing and extent of spending on research and development efforts and other business initiatives, the rate of growth in the volume of system builds and the need for additional working capital, the expansion of sales and marketing activities both in domestic and international markets, market acceptance of our products, our ability to secure financing for customer use of our products, the timing of installations and of inventory build in anticipation of future sales and installations, and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.
Current wording
Our future capital requirements depend on a variety of factors, including our rate of revenue growth; the timing and extent of spending on research and development and other business initiatives; the pace and volume of system builds; the need for additional working capital; the expansion of our sales and marketing activities in both domestic and international markets; market acceptance of our products; our ability to secure financing for customer use of our products; the timing of installations and related inventory build in anticipation of future sales; and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.
Previous wording
Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash used in operating activities for the nine months ended September 30, 2024 related primarily to the changes in our working capital of $398.5 million predominantly due to (1) an increase in accounts receivable and contract assets by $250.3 million and $79.7 million, respectively, triggered by the timing of revenue transactions, corresponding collections and billing milestones, (2) an increase in inventory levels by $83.2 million to support future demand, and (3) the timing of payments to vendors.
Current wording
Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash used in operating activities for the three months ended March 31, 2025, related primarily to the changes in our working capital of $137.9 million predominantly due to (1) a decrease in deferred revenue and customer deposits by $74.9 million, driven by timing of acceptances, (2) an increase in inventory levels by $65.6 million to support future demand, (3) an increase in deferred cost of revenue of $7.5 million, and (4) an increase in prepaid expenses and other current assets of $5.1 million, partially offset by the timing of payments to vendors.
Previous wording
Net cash used in operating activities during the nine months ended September 30, 2024, was $392.2 million, an improvement of $102.1 million compared to the prior year period. The change in cash used in operating activities during the nine months ended September 30, 2024, as compared to the prior year period, was primarily driven by an increase of $166.5 million attributable to accounts receivable, partially offset by decreases of $123.1 million, $85.8 million, and $31.5 million attributable to inventories, deferred revenue and customer deposits, and accrued expenses and other current liabilities, respectively.
Current wording
Net cash used in operating activities during the three months ended March 31, 2025, was $110.7 million, an improvement of $36.6 million compared to the prior year period. The change in cash used in operating activities during the three months ended March 31, 2025, as compared to the prior year period, was primarily driven by an increase of $40.6 million and $8.6 million attributable to inventories and prepaid expenses and other current assets, respectively, a $57.3 million decrease attributable to deferred revenue and customer deposits, partially offset by an increase of $86.0 million attributable to accounts payable.
Previous wording
Our investing activities have consisted of capital expenditures, including investments to increase our production capacity. Cash used in investing activities during the nine months ended September 30, 2024, was $47.7 million, a decrease of $19.8 million compared to the prior year period, and was primarily due to the decrease in expenditures on tenant improvements for a newly leased engineering and manufacturing building in Fremont, California, which opened in July 2022. We expect to continue to make capital investments over the next few quarters to expand production capacity at our new manufacturing facility in Fremont, California, which includes the purchase of new equipment and other tenant improvements. We intend to fund these capital expenditures from cash on hand as well as cash flow to be generated from operations. We may also evaluate and arrange equipment lease financing to fund these capital expenditures.
Current wording
Our investing activities have consisted of capital expenditures, including investments to increase our production capacity. Cash used in investing activities during the three months ended March 31, 2025, was $14.2 million, an improvement of $7.2 million, as compared to the prior year period. The improvement was primarily due to the decrease in expenditures on tenant improvements for a leased engineering and manufacturing facility in Fremont, California, which opened in July 2022. We expect to continue to make capital investments over the next few quarters to expand production capacity at our manufacturing facility in Fremont, California, which includes the purchase of new equipment and other tenant improvements. We intend to fund these capital expenditures from cash on hand as well as cash flow expected to be generated from operations. We may also evaluate and arrange equipment lease financing to fund this capital expenditures.
Previous wording
Our financing activities consist of borrowings and repayments of debt, proceeds and repayments of financing obligations, distributions paid to noncontrolling interests, contributions from noncontrolling interests, payments of dividends, proceeds from the issuances of our common stock, and other financing activities. Net cash provided by financing activities during the nine months ended September 30, 2024 was $244.4 million, a decrease of $437.8 million compared to the prior year period, predominantly due to (1) a decrease in the proceeds from issuance of redeemable convertible preferred stock of $310.6 million, net of paid issuance costs of $0.4 million, as a result of the SK ecoplant Second Tranche Closing in the nine months ended September 30, 2023 (please refer to Part II, Item 8, Note 17 —SK ecoplant Strategic Investmentin our Annual Report on Form 10-K for the fiscal year ended December 31, 2023), and (2) a decrease in proceeds from the issuance of debt by $231.5 million. The decrease was partially offset by (1) the purchase in fiscal year 2023 of the capped call of $54.5 million related to the 3% Green Notes due June 2028 issued in the second quarter of fiscal year 2023, and (2) a decrease in the repayment of debt by $50.4 million.
Current wording
Our financing activities consist of proceeds from and repayments of financing obligations, contributions from noncontrolling interests, proceeds from issuance of our common stock, and other cash flows from financing activities. Net cash provided by financing activities during the three months ended March 31, 2025, was $5.1 million, a decrease of $2.0 million, as compared to the prior year period, predominantly due to (1) a decrease in contributions from noncontrolling interest by $4.0 million, and (2) a decrease in proceeds from financing obligations by $1.3 million, partially offset by (1) a decrease in repayment of financing obligations by $2.3 million, and (2) an increase in proceeds from issuance of common stock by $0.8 million.
Previous wording
Net cash provided by financing activities for the nine months ended September 30, 2024, consisted of (1) the proceeds from issuance of the 3% Green Notes due June 2029 of $402.5 million, (2) the proceeds from issuance of common stock of $11.1 million, (3) the contribution from a noncontrolling interest of $4.0 million, (4) the proceeds from financing obligations of $1.8 million, (5) the partial repurchase of the 2.5% Green Notes of $141.0 million, (6) the repayment of financing obligations of $19.8 million, (7) the repayment of debt issuance costs of $12.8 million pertaining to the 3% Green Notes due June 2029, and (8) a dividend payment of $1.5 million. Our working capital was strengthened by the issuance of the 3% Green Notes due June 2029 and 3% Green Notes due June 2028 in May 2024 and May 2023, respectively, as well as financing activities with SK ecoplant in the first quarter of 2023, but we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part I, Item 1, Note 7 —Outstanding Loans and Security Agreements of this Quarterly Report on Form 10-Q and Part I, Item 1A, Risk Factors— Risks Related to Our Liquidity— Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and operating activities and may adversely affect our ability to incur additional debt to fund future needs section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023 for more information regarding the terms of and risks associated with our debt.
Current wording
We believe we have sufficient capital to operate our business over the next 12 months. Our working capital was strengthened with the supplemented liquidity through issuing the 3% Green Notes due June 2029 and the 3% Green Notes due June 2028 in the second quarter of 2024 and 2023, respectively, as well as financing activities with SK ecoplant in the first quarter of 2023. In addition, we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements, and Part I, Item 1A, Outstanding Loans and Security Agreements of this Quarterly Report on Form 10-Q and Part I, Item 1A, Risk Factors— Risks Related to Our Liquidity— Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and operating activities and may adversely affect our ability to incur additional debt to fund future needs section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024, for more information regarding the terms of and risks associated with our debt.
Previous wording
For information about our purchase and financing options, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, Purchase and Financing Options section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Current wording
For information about our purchase and financing options, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, section Purchase and Financing Optionsin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
Our customers have several purchase alternatives for our Energy Servers. The portion of total revenue attributable to each purchase option in the three and nine months ended September 30, 2024, and 2023 was as follows:
Current wording
Our customers have several purchase alternatives for our Energy Server systems. The portion of total revenue attributable to each purchase option in the three months ended March 31, 2025, and 2024, was as follows:
Previous wording
As of September 30, 2024, we had incurred no liabilities due to failure to repair or replace Energy Servers pursuant to any performance warranties made under operations and maintenance agreements (“O&M Agreements”).
Current wording
As of March 31, 2025, and December 31, 2024, we had incurred no liabilities due to failure to repair or replace the Energy Server systems pursuant to any performance warranties made under the O&M Agreements (“O&M Agreements”).
Previous wording
For O&M Agreements that are subject to renewal, our future service revenue from such agreements are subject to our obligations to make payments for underperformance against the performance guaranties, which are capped at an aggregate total of approximately $583.4 million (including $456.1 million related to portfolio financing entities and $127.3 million related to all other transactions, and include payments for both low output and low efficiency) and our aggregate remaining potential payment related to these underperformance obligations was approximately $491.1 million as of September 30, 2024. For the nine months ended September 30, 2024, we made performance guarantee payments of $18.8 million.
Current wording
For the O&M Agreements that are subject to renewal, our future service revenue from such agreements are subject to our obligations to make payments for underperformance against the performance guaranties, which are capped at an aggregate total of approximately $587.5 million (including $460.3 million related to portfolio financing entities and $127.2 million related to all other transactions, and include payments for both low output and low efficiency) and our aggregate remaining potential payment related to these underperformance obligations was approximately $479.8 million as of March 31, 2025. For the three months ended March 31, 2025, and 2024, we made performance guarantee payments of $11.6 million and $15.1 million, respectively.
Previous wording
There were no significant changes in our international channel partners during the nine months ended September 30, 2024. For information on international channel partners, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, International Channel Partners section in our Annual Report on Form 10-K for the fiscal year ended December 31, 2023.
Current wording
There were no significant changes in our international channel partners during the three months ended March 31, 2025. For information on international channel partners, see Part II, Item 7 —Management’s Discussion and Analysis of Financial Condition and Results of Operations, section International Channel Partnersin our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Previous wording
A discussion regarding the comparison of our financial condition and results of operations for the three and nine months ended September 30, 2024, and 2023 is presented below.
Current wording
A discussion regarding the comparison of our financial condition and results of operations for the three months ended March 31, 2025, and 2024 is presented below.
Previous wording
Total revenue decreased by $69.9 million, or 17.5%, for the three months ended September 30, 2024, as compared to the prior year period. This decrease was driven by a $71.2 million decrease in product revenue, and a $12.0 million decrease in electricity revenue, partially offset by a $10.1 million increase in installation revenue, and a $3.2 million increase in service revenue.
Current wording
Total revenue increased by $90.7 million, or 38.6%, for the three months ended March 31, 2025, as compared to the prior year period. This increase was driven by a $58.5 million increase in product revenue, a $22.2 million increase in installation revenue, and a $12.9 million increase in electricity revenue, partially offset by a $2.9 million decrease in service revenue.
Previous wording
Cost of installation revenue increased by $9.8 million, or 37.8%, and by $17.5 million, or 22.4%, for the three and nine months ended September 30, 2024, respectively, as compared to the prior year period. The increase for each period was primarily driven by the timing of achieving key project milestones on sites requiring installations by us in the three and nine months ended September 30, 2024. Each customer site is unique and installation costs can vary due to a number of factors, including site complexity, size, and location of gas, among other factors.
Current wording
Cost of installation revenue increased by $18.0 million, or 117.0%, for the three months ended March 31, 2025, as compared to the prior year period. The increase was primarily driven by the timing of achieving key project milestones on sites requiring installations by us in the first quarter of fiscal year 2025.
Previous wording
Cost of service revenue decreased by $6.0 million, or 10.5%, for the three months ended September 30, 2024, as compared to the prior year period. This decrease was primarily due to (1) a decrease in the deployment of field replacement units, contributing a decrease of $4.8 million, (2) repair and overhaul cost reductions of $4.0 million, and (3) our cost reduction efforts to proactively manage fleet optimizations. The decrease was partially offset by an increase in maintenance material and labor and overhead costs of $3.3 million.
Current wording
Cost of service revenue decreased by $3.6 million, or 6.5%, for the three months ended March 31, 2025, as compared to the prior year period. This decrease was primarily due to (1) a decrease in the deployment of field replacement units, contributing to a decrease of $6.4 million, (2) a $3.3 million decrease in repair and overhaul expenses, partially as a result of repowering our PPA and Managed Services portfolios, which resulted in a relatively newer fleet that required less service, (3) a $1.2 million decrease in rework for production costs, and (4) our cost reduction efforts to proactively manage fleet optimizations. The decrease was partially offset by an increase in maintenance material of $1.4 million.
Previous wording
Total gross profit (loss) improved by $83.9 million in the three months ended September 30, 2024, as compared to the prior year period. This change was predominantly driven by (1) a $117.9 million improvement of electricity gross profit (loss), primarily due to a $123.7 million impairment charge that resulted from the PPA V repowering, which commenced in the third quarter of fiscal year 2023, and (2) a $9.2 million improvement in service gross loss, due to our efforts to proactively manage fleet optimizations, and our ongoing efforts to reduce product costs. Total gross profit (loss) improvement was partially offset by a $43.5 million decrease in product gross profit, predominantly driven by lower pricing and volume attributable to the PPA V repowering, which commenced in the third quarter of fiscal year 2023.
Current wording
Gross profit increased by $50.6 million in the three months ended March 31, 2025, as compared to the prior year period. This increase was predominantly driven by (1) a $34.7 million increase in product gross profit, primarily driven by higher demand for our products, leading to a 38.1% increase in product revenue and only a 20.6% increase in respective cost of revenue, (2) a $11.0 million increase of electricity gross profit, (3) a $4.2 million improvement of installation gross margin, and (4) a $0.7 million improvement of service gross margin, due to our efforts to proactively manage fleet optimizations, and our ongoing efforts to reduce product costs.
Previous wording
Installation gross loss improved by $0.4 million and $2.0 million in the three and nine months ended September 30, 2024, respectively, as compared to the prior year period. The change for each period was primarily driven by (1) the timing of achieving key project milestones on sites requiring installations by us in the three and nine months ended September 30, 2024, and (2) other site related factors such as site complexity, size, local ordinance requirements, and location of the utility interconnect.
Current wording
Installation gross margin improved by $4.2 million in the three months ended March 31, 2025, as compared to the prior year period. The change for the period was primarily driven by (1) the timing of achieving key project milestones on sites requiring installations by us in the first quarter of fiscal year 2025, and (2) other site related factors such as site complexity, size, local ordinance requirements, and location of the utility interconnect.
Previous wording
Service gross loss improved by $9.2 million in the three months ended September 30, 2024, as compared to the prior year period. This was primarily due to (1) a decrease in the deployment of field replacement units, contributing a decrease of $4.8 million, (2) repair and overhaul cost reductions of $4.0 million, (3) a decrease of $2.3 million in product performance guarantees that resulted from improved fleet performance, (4) a $1.4 million increase in revenue from maintenance contracts associated with our fleet of Energy Servers, and (5) our cost reduction efforts to proactively manage fleet optimizations. The improvement was partially offset by an increase in maintenance material and labor and overhead costs of $3.3 million.
Current wording
Service gross margin improved by $0.7 million in the three months ended March 31, 2025, as compared to the prior year period. This was primarily driven by (1) a decrease in the deployment of field replacement units, contributing an improvement of $6.4 million, (2) repair and overhaul cost reductions of $3.3 million, and (3) our cost reduction efforts to proactively manage fleet optimizations. The improvement was partially offset by (1) a $2.2 million decrease in revenue from maintenance contracts associated with our fleet of Energy Server systems, (2) an increase of $0.7 million in product performance guarantees as a result of Energy Server systems fleet depreciation, and (3) the timing of revenue recognition on certain contracts.
Showing the first 40 of 53 pairs. Open the source sections for the rest.
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
In Ireland, a major data center market, a directive from the Minister for the Department of the Environment, Climate and Communications under the previous administration to restrict grid connections for data centers and other large power users, along with a halt in high-pressure gas installations, has delayed our sales activities. In 2023, the South Korean government moved to a new, government-run bidding process for fuel cell purchases, which has adversely impacted and may continue to impact demand for our power solutions.
Current report — wording carried from elsewhere
We are also reliant on third party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. In the event we are unable to mitigate the impacts of delays and rising prices for raw materials and components, including those caused by new tariffs, it could delay the manufacturing and installation, increase the costs of our products and the overall project, and adversely affect our cash flow and results of operations, including revenue and gross margin.
Current report — wording carried from elsewhere
Net cash provided by financing activities for the three months ended March 31, 2025, consisted of (1) the proceeds from issuance of common stock of $7.7 million, (2) the repayment of financing obligations of $2.7 million, and (3) other cash flows from financing activities of $0.2 million.
Current report — wording carried from elsewhere
Net Income Attributable to Noncontrolling Interests