Item 1A. Risk Factors

Current report: 10-K

Period ended 2024-12-31; filed 2025-02-18.

0001002910-25-000055

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 108 previous paragraphs and 108 current paragraphs.

53 unchanged; 51 reworded; 2 added; 4 removed; 0 previous and 2 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (2)

Current report

In April 2024, the EPA issued a final rule that sets CO 2 emission standards for existing coal-fired and new natural gas-fired power plants based on the emissions expected from adoption of carbon capture technology and/or natural gas co-firing for coal-fired power plants and carbon capture technology for new natural gas-fired power plants. Affected power plants are required to comply with the rule through a phased-in approach or retire. Compliance with the new rule could be required as early as 2030 for certain existing coal-fired power plants and 2032 for certain new natural gas-fired power plants. In December 2024, the United States Court of Appeals for the District of Columbia Circuit heard arguments from various stakeholders including the EPA, environmental organizations, state attorney generals, and industry groups regarding the legal merits of the final rule. In February 2025, the EPA requested that the appellate court suspend the case for 60 days and not issue an opinion so the EPA can decide how to proceed. Ameren and Ameren Missouri estimate capital expenditures of approximately $580 million may be necessary to comply with the final rule assuming it is not revised or overturned. Ameren and Ameren Missouri are monitoring the legal challenges and assessing the impacts of the final rule and, at this time, cannot predict the final impacts on their results of operations, financial position, and liquidity.

Current report

The Ameren Companies have experienced minimal growth in energy demand for the past two decades. Recent industry projections reflect the potential for significant growth in energy demand over the next decade, primarily arising from data centers to support artificial intelligence and further augmented by onshoring and electrification of manufacturing and an increase in transportation electrification. The Ameren Companies may or may not experience energy demand growth depending on the decisions of potential new customers about whether to locate their operations within our service territories. If new customers elect to locate operations within our service territories, the Ameren Companies may not be able to provide the necessary electric service within the time periods required by those customers. The Ameren Companies may need to accelerate new generation build within current plans, and construct or obtain new generation sources and expand transmission and distribution facilities that are not currently within their plans. The Ameren Companies may not be able to plan, receive regulatory approvals, and execute those plans in a timely manner. Future demand from these customers may not be realized at the current projected pace as a result of increased efficiency in computing, and these new customers may be transitory and exit our service territory. Significant uncertainty exists regarding future increases in energy demand within the Ameren Companies’ service territory, and whether and how the Ameren Companies will construct or obtain the assets necessary to timely serve that additional demand.
Removed paragraphs (4)

Previous report

Ameren Illinois’ QIP expired in December 2023, which will subject Ameren Illinois to increased regulatory lag with respect to certain natural gas infrastructure investments. In addition, reconciliation hearings to determine the accuracy and prudence of natural gas capital investments recovered under the QIP are still ongoing.

Previous report

The QIP expired in December 2023. Previously, it provided Ameren Illinois with recovery of, and a return on, qualifying natural gas infrastructure investments that were placed in service between regulatory rate reviews. Infrastructure investments under the QIP earned a return at the applicable WACC. As a result of the expiration of the QIP, Ameren Illinois is subject to increased regulatory lag on its natural gas infrastructure investments that are placed in service between regulatory rate reviews, which could adversely affect Ameren’s and Ameren Illinois’ investment plans and results of operations, financial position, and liquidity. In addition, reconciliation hearings to determine the accuracy and prudence of natural gas capital investments recovered under the QIP from 2020 to 2023 are still ongoing. In October 2023, the Illinois Attorney General’s office challenged the recovery of capital investments that were made during 2020, alleging that the ICC should disallow approximately $53 million in natural gas capital investments as improper and imprudent, providing a potential over-recovery of approximately $3 million in 2020. In October 2023, the ICC staff filed testimony that supports the prudence and reasonableness of the capital investments made during 2020. Ameren Illinois’ 2020 QIP rate recovery request under review by the ICC was within the rate increase limitations allowed by law. The ICC is under no deadline to issue an order in this proceeding. Ameren Illinois cannot predict the ultimate outcome of this regulatory proceeding.

Previous report

In June 2022, the United States Supreme Court issued its decision in West Virginia v. EPA, clarifying that there are limits on how the EPA may regulate greenhouse gases absent further direction from the United States Congress. The court concluded that the EPA’s proposed rules were designed to shift generation from fossil-fuel-fired power plants to renewable energy facilities, which was improper absent specific congressional authorization. In May 2023, the EPA issued a new proposed rule that would set CO 2 emission standards for new and existing fossil-fuel-fired power plants based on the adoption of carbon capture technology, natural gas co-firing, and co-firing hydrogen fuel to reduce emissions. If the proposed rule were adopted, the affected fossil-fuel-fired power plants would be required to comply with the rule through a phased-in approach or retire. Capacity restrictions for coal-fired units could apply as early as 2030. Larger natural gas-fired power plants would be required to co-fire with hydrogen by 2032, with additional requirements by 2038. The EPA expects to issue a final rule in 2024. Legal challenges to the final rule, if adopted as proposed, are expected. Ameren and Ameren Missouri cannot predict the results of any such challenges or potential impacts of any such regulations on their results of operations, financial position, and liquidity until final regulations are adopted and the merits of such legal challenges are determined.

Previous report

Our natural gas distribution service businesses involve numerous risks that may result in accidents and increased operating costs.
Reworded paragraphs (51)

Previous wording

We are subject to federal, state, and local regulation. The extensive regulatory frameworks, some of which are more specifically identified in the following risk factors, regulate, among other matters, the electric and natural gas utility industries; the rate and cost structure of utilities, including an allowed ROE; the operation of nuclear power plants; the construction and operation of generation, transmission, and distribution facilities; the acquisition, disposal, depreciation and amortization of assets and facilities; the electric transmission system reliability; and wholesale and retail competition. In the planning and management of our operations, we must address the effects of existing and proposed laws and regulations and potential changes in our regulatory frameworks, including initiatives by federal and state legislatures, RTOs, utility regulators, and taxing authorities, and actions by local jurisdictions that may affect the constructing or siting of facilities. Significant changes in the nature of the regulation of our businesses, including expiration or discontinuation of, or significant changes to, existing regulatory mechanisms, could require changes to our business planning and management of our businesses and could adversely affect our results of operations, financial position, and liquidity. Failure to obtain adequate rates or regulatory approvals in a timely manner; failure to obtain necessary licenses or permits from regulatory authorities; the impact of new or modified laws, regulations, standards, interpretations, or other legal requirements; or increased compliance costs could adversely affect our results of operations, financial position, and liquidity.

Current wording

We are subject to federal, state, and local regulation. The extensive regulatory frameworks, some of which are more specifically identified in the following risk factors, regulate, among other matters, the electric and natural gas utility industries; the rate and cost structure of utilities, including an allowed ROE; the operation of nuclear power plants; the construction and operation of generation, transmission, and distribution facilities; the acquisition, disposal, depreciation and amortization of assets and facilities; the electric transmission system reliability; and wholesale and retail competition. In the planning and management of our operations, we must address the effects of existing and proposed laws and regulations and potential changes in our regulatory frameworks, including reinterpretation of such regulations, as well initiatives by federal and state legislatures, RTOs, utility regulators, and taxing authorities, and actions by local jurisdictions that may affect the constructing or siting of facilities. Significant changes in the nature of the regulation of our businesses, including expiration or discontinuation of, or significant changes to, existing regulatory mechanisms, and the current federal administration’s approach to United States energy policy and resultant changes in regulatory enforcement priorities, and/or evolving interpretations of existing regulatory requirements, could require changes to our business planning, strategy and management of our businesses and could adversely affect our results of operations, financial position, and liquidity. Failure to obtain adequate rates or regulatory approvals in a timely manner; failure to obtain necessary licenses or permits from regulatory authorities; the impact of new or modified laws, regulations, standards, interpretations, or other legal requirements; or increased compliance costs could adversely affect our results of operations, financial position, and liquidity.

Previous wording

The rates that we are allowed to charge for our utility services significantly influence our results of operations, financial position, and liquidity. The electric and natural gas utility industry is highly regulated. The utility rates charged to customers are determined by governmental entities, including the MoPSC, the ICC, and the FERC. Decisions by these entities are influenced by many factors, including the cost of providing service, the prudency of expenditures, the quality of service, regulatory staff knowledge and experience, customer intervention, and economic conditions, as well as social and political views. Decisions made by these governmental entities regarding customer rates are largely outside of our control. We are exposed to regulatory lag, including the impact of inflationary pressures, and cost disallowances to varying degrees by jurisdiction, which, if unmitigated, could adversely affect our results of operations, financial position, and liquidity. Rate orders are also subject to appeal, which creates additional uncertainty as to the rates that we will ultimately be allowed to charge for our services. From time to time, our regulators may approve trackers, riders, or other recovery mechanisms that allow electric or natural gas rates to be adjusted without a traditional regulatory rate review. These mechanisms could be changed or terminated.

Current wording

The rates that we are allowed to charge for our utility services significantly influence our results of operations, financial position, and liquidity. The electric and natural gas utility industry is highly regulated. The utility rates charged to customers are determined by governmental entities, including the MoPSC, the ICC, and the FERC. Decisions by these entities are influenced by many factors, including the cost of providing service, the prudency of expenditures, the quality of service, regulatory staff knowledge and experience, customer intervention, and economic conditions, as well as social and political views. Decisions made by these governmental entities regarding customer rates are largely outside of our control. We are exposed to regulatory lag, including the impact of inflationary pressures, and cost disallowances to varying degrees by jurisdiction, which, if unmitigated, could adversely affect our results of operations, financial position, and liquidity. Rate orders are also subject to appeal, which creates additional uncertainty as to the rates that we will ultimately be allowed to charge for our services. From time to time, our regulators may approve riders or other recovery mechanisms that allow electric or natural gas rates to be adjusted without a traditional regulatory rate review. These mechanisms could be changed or terminated.

Previous wording

Ameren Missouri’s electric and natural gas utility rates and Ameren Illinois’ natural gas utility rates are typically established in regulatory proceedings that take up to 11 months to complete. Ameren Missouri’s electric and natural gas utility rates established in those proceedings are primarily based on historical costs, revenues, and sales volumes. Ameren Illinois’ natural gas rates established in those proceedings are based on estimated future costs, revenues, and sales volumes. Effective for rates beginning in 2024 through at least 2027, Ameren Illinois’ electric distribution rates will be established through an MYRP as discussed in the following risk factor. An MYRP includes a revenue requirement reconciliation, which may not allow for full recovery of actual costs due to a reconciliation cap. Thus, the rates that we are allowed to charge for utility services may not match our actual costs at any given time.

Current wording

Ameren Missouri’s electric and natural gas utility rates and Ameren Illinois’ natural gas utility rates are typically established in regulatory proceedings that take up to 11 months to complete. Ameren Missouri’s electric and natural gas utility rates established in those proceedings are based on historical costs, revenues, and sales volumes. Ameren Illinois’ natural gas rates established in those proceedings are based on estimated future costs, revenues, and sales volumes. Effective for rates in 2024 through at least 2027, Ameren Illinois’ electric distribution rates have been established through an MYRP as discussed in the following risk factor. An MYRP includes a revenue requirement reconciliation, which may not allow for full recovery of actual costs due to a reconciliation cap. Thus, the rates that we are allowed to charge for utility services may not match our actual costs at any given time.

Previous wording

Rates include an allowed return on investments established by the regulator, including a return at the applicable WACC on rate base, and an amount for income taxes based on the currently applicable statutory income tax rates and amortization associated with excess deferred income taxes. Although rate regulation is premised on providing an opportunity to earn a reasonable rate of return on rate base, there can be no assurance that the regulator will determine that our costs were prudently incurred or that the regulatory process will result in rates that will produce full recovery of such costs or provide for an opportunity to earn a reasonable return on those investments. Ameren Missouri and Ameren Illinois, and the utility industry generally, have an increased need for cost recovery, primarily driven by capital investments, which is likely to continue in the future. The resulting increase to the revenue requirement needed to recover such costs and earn a return on investments could result in more frequent regulatory rate reviews and requests for cost recovery mechanisms. Additionally, increasing rates could result in regulatory or legislative actions, as well as competitive or political pressures, all of which could adversely affect our results of operations, financial position, and liquidity.

Current wording

Rates include an allowed return on investments established by the regulator, including a return at the applicable WACC on rate base, and an amount for income taxes based on the currently applicable statutory income tax rates and amortization associated with excess deferred income taxes. Although rate regulation is premised on providing an opportunity to earn a reasonable rate of return on rate base, there can be no assurance that the regulator will determine that our costs were prudently incurred or that the regulatory process will result in rates that will produce full recovery of such costs or provide for an opportunity to earn a reasonable return on those investments. Ameren Missouri and Ameren Illinois, and the utility industry generally, have an increased need for cost recovery and to earn a return on investments, primarily driven by capital investments, which is likely to continue in the future. The resulting increase to the revenue requirement needed to recover such costs and earn a return on investments could result in more frequent regulatory rate reviews and requests for cost recovery mechanisms. Additionally, increasing rates could result in regulatory or legislative actions, as well as competitive or political pressures, all of which could adversely affect our results of operations, financial position, and liquidity.

Previous wording

In January 2011, the United States Department of Justice, on behalf of the EPA, filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri alleging that projects performed in 2007 and 2010 at the coal-fired Rush Island Energy Center violated provisions of the Clean Air Act and Missouri law. In January 2017, the district court issued a liability ruling against Ameren Missouri and, in September 2019, entered a remedy order that required Ameren Missouri to install a flue gas desulfurization system at the Rush Island Energy Center and a dry sorbent injection system at the Labadie Energy Center. Following an appeal from Ameren Missouri, in August 2021, the United States Court of Appeals for the Eighth Circuit affirmed the liability ruling and the district court’s remedy order as it related to the installation of a flue gas desulfurization system at the Rush Island Energy Center, but reversed the order as it related to the installation of a dry sorbent injection system at the Labadie Energy Center. In September 2023, the district court granted Ameren Missouri’s request to modify the remedy order to allow the retirement of the Rush Island Energy Center in advance of its previously expected useful life in lieu of installing a flue gas desulfurization system. In its amended remedy order, the district court established an October 15, 2024 retirement date and, in the interim, authorized Ameren Missouri to operate the energy center as directed by the MISO. The United States Department of Justice is seeking an order from the district court providing for additional mitigation relief. Ameren Missouri could be required to implement mitigation relief measures, the costs of which could be material and which Ameren Missouri would not expect to recover. Ameren Missouri is challenging such mitigation claims, noting that the scope of any such potential additional mitigation relief should be limited by the August 2021 court of appeals decision and offset by emission reductions resulting from the accelerated retirement of the Rush Island Energy Center. The MISO designated the energy center as a system support resource in 2022 and concluded that certain reliability mitigation measures, including transmission upgrades, should occur before the energy center is retired. The Rush Island Energy Center began operating as a system support resource on September 1, 2022. In 2023, the MISO extended the system support resource designation through August 2024, and in September 2023, an agreement between Ameren Missouri and the MISO was approved by the FERC that results in the Rush Island Energy Center only operating during peak demand times and emergencies. The system support resource designation and the related agreement are subject to annual renewal and revision. Construction activities are underway for the transmission upgrades approved by the MISO, with the majority of the upgrades expected to be completed in the fall of 20…

Excerpt shortened here; the source contains the full paragraph.

Current wording

In addition, in June 2024, the MoPSC issued a financing order authorizing the issuance of securitized utility tariff bonds by a wholly owned, special purpose subsidiary of Ameren Missouri to finance approximately $476 million of costs related to the accelerated retirement of the Rush Island Energy Center, which included the remaining unrecovered net plant balance associated with the facility, among other costs. Ameren Missouri will collect the amounts necessary to repay the bonds over approximately 15 years from the date of bond issuance. The securitized tariff bonds were issued in December 2024. The financing order also included a determination that the decision to retire the Rush Island Energy Center was reasonable and prudent. The MoPSC did not make a determination regarding the prudency of Ameren Missouri's prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation discussed in Note 14 – Commitments and Contingencies under Part II, Item 8, of this report, however, claims regarding such actions could be considered in future regulatory proceedings. If future regulatory proceedings result in revenue reductions based on Ameren Missouri’s prior actions that resulted in the adverse ruling in the NSR and Clean Air Act litigation, it could have a material adverse effect on the results of operations, financial position, and liquidity of Ameren and Ameren Missouri.

Previous wording

Beginning in 2024 through at least 2027, electric distribution rates for Ameren Illinois are established through an MYRP, which are subject to ongoing regulatory and judicial proceedings and associated risks, and are subject to a reconciliation cap. Additionally, Ameren Illinois is subject to certain performance metrics that if not achieved would result in a reduction to the company’s allowed ROE.

Current wording

In 2024 through at least 2027, electric distribution rates for Ameren Illinois are established through an MYRP, which are subject to ongoing regulatory and judicial proceedings and associated risks, and are subject to a reconciliation cap. Additionally, Ameren Illinois is subject to certain performance metrics that if not achieved would result in a reduction to the company’s allowed ROE.

Previous wording

The CEJA resulted in changes to the regulatory framework applicable to Ameren Illinois’ electric distribution business by giving Ameren Illinois the option to file an MYRP with the ICC or establish future rates through a traditional regulatory rate review, among other things. An MYRP establishes rates for a four-year period, and Ameren Illinois has the option to file for an MYRP every four years. Ameren Illinois elected to file an MYRP for rates effective in 2024 through 2027. Under the MYRP, Ameren Illinois will reconcile its actual revenue requirement, as adjusted for certain cost variations, to ICC-approved electric distribution service rates on an annual basis, subject to a reconciliation cap. The reconciliation cap limits the annual adjustment to 105% of the annual revenue requirement approved by the ICC. Certain variations from forecasted costs are excluded from the reconciliation cap, including those associated with major storms; new business and facility relocations; changes in the timing of certain expenditures or investments into or out of the applicable calendar year; and changes in interest rates, income taxes, taxes other than income taxes, pension and other post-retirement benefits costs, and amortization of certain assets. The reconciliation cap also excludes costs recovered outside of base rates through riders. Ameren Illinois’ existing riders remain effective and electric distribution service revenues continue to be decoupled from sales volumes under the MYRP. The actual revenue requirement for a particular year incorporates Ameren Illinois’ year-end rate base and actual capital structure for such year, provided that the resulting revenue requirement does not exceed the 105% reconciliation cap and the common equity ratio in such capital structure may not exceed that approved by the ICC in the MYRP. In addition, the ICC determines the ROE applicable to each year of the four-year period. Economic conditions could result in the annual predetermined ROE becoming inadequate over the four-year period. In December 2023, the ICC issued an order in Ameren Illinois' MYRP proceeding, approving revenue requirements for electric distribution service for 2024, 2025, 2026, and 2027 of $1,162 million, $1,210 million, $1,242 million, and $1,255 million, respectively. These revenue requirements were established under an alternative methodology which used Ameren Illinois’ previously approved 2022 year-end rate base since the order rejected the Grid Plan that was filed by Ameren Illinois as a part of the MYRP proceeding. The ICC concluded that the proposed Grid Plan did not meet certain statutory requirements and directed Ameren Illinois to file a revised Grid Plan within three months. Ameren Illinois expects to file a revised Grid Plan with the ICC in March 2024, and also expects to file a request to update the associated MYRP revenue requirements for 2024 through 2027 in the first half of 2024. The 2022 year-end rate base will remain in effect thr…

Excerpt shortened here; the source contains the full paragraph.

Current wording

The CEJA resulted in changes to the regulatory framework applicable to Ameren Illinois’ electric distribution business by giving Ameren Illinois the option to file an MYRP with the ICC or establish rates through a traditional regulatory rate review, among other things. An MYRP establishes rates for a four-year period, and Ameren Illinois has the option to file for an MYRP every four years. Ameren Illinois elected to file an MYRP for rates effective in 2024 through 2027. Under the MYRP, Ameren Illinois is allowed to reconcile its actual electric distribution revenue requirement, as adjusted for certain cost variations, to the ICC-approved revenue requirement on an annual basis, subject to a reconciliation cap. The reconciliation cap limits the annual adjustment to 105% of the annual revenue requirement approved by the ICC. Certain variations from forecasted costs are excluded from the reconciliation cap, including those associated with major storms; new business and facility relocations; changes in the timing of certain expenditures or investments into or out of the applicable calendar year; and changes in interest rates, income taxes, taxes other than income taxes, pension and other post-retirement benefits costs, and amortization of certain assets. The reconciliation cap also excludes costs recovered outside of base rates through riders. The actual revenue requirement for a particular year incorporates Ameren Illinois’ year-end rate base and actual capital structure for such year, provided that the resulting revenue requirement does not exceed the 105% reconciliation cap and the common equity ratio in such capital structure may not exceed that approved by the ICC in the MYRP. Ameren Illinois’ existing riders continue to be effective under the MYRP. In addition, the ICC determines the ROE applicable to each year of the four-year period. Economic conditions could result in the annual predetermined ROE becoming inadequate over the four-year period. Ameren Illinois has filed an appeal of the ICC-determined ROE for 2024 through 2027 to the Illinois Appellate Court for the Fifth Judicial District. For additional information on the appeal see Note 2 – Rate and Regulatory Matters under Part II, Item 8, of this report. Failure to limit capital expenditures and operation and maintenance expenses to amounts that maintain revenue requirements under the reconciliation cap limit would adversely affect Ameren’s and Ameren Illinois’ results of operations, financial position, and liquidity.

Previous wording

As a result of the election to use the PISA, effective in 2024, Ameren Missouri’s electric service business is subject to a limitation on increasing the annual revenue requirement due to the inclusion of incremental PISA deferrals in the revenue requirement.

Current wording

As a result of the election to use the PISA, Ameren Missouri’s electric service business is subject to a limitation on increasing the annual revenue requirement due to the inclusion of incremental PISA deferrals in the revenue requirement.

Previous wording

Pursuant to a Missouri law that became effective in August 2022, Ameren Missouri’s PISA election was extended through December 2028 and an additional extension through December 2033 is allowed if requested by Ameren Missouri and approved by the MoPSC, among other things. This law also established a 2.5% annual limit on increases to the electric service revenue requirement used to set customer rates, compared to the revenue requirement established in the immediately preceding rate order, due to the inclusion of incremental PISA deferrals in the revenue requirement. The limitation will be effective for revenue requirements approved by the MoPSC after January 1, 2024. Increased capital expenditures could cause incremental PISA deferrals to exceed the 2.5% limitation, and such amounts exceeding the 2.5% limitation would be excluded from recovery under future revenue requirements. Failure to limit capital investments to an amount which maintains PISA deferrals under the 2.5% limitation could adversely affect Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Current wording

Pursuant to a Missouri law, Ameren Missouri’s PISA election was extended through December 2028 and an additional extension through December 2033 is allowed if requested by Ameren Missouri and approved by the MoPSC, among other things. This law also established a 2.5% annual limit on increases to the electric service revenue requirement used to set customer rates, compared to the revenue requirement established in the immediately preceding rate order, due to the inclusion of incremental PISA deferrals in the revenue requirement. The limitation is effective for revenue requirements approved by the MoPSC after January 1, 2024. Increased capital expenditures could cause incremental PISA deferrals to exceed the 2.5% limitation, and such amounts exceeding the 2.5% limitation would be excluded from recovery under future revenue requirements. Failure to limit capital investments to an amount which maintains PISA deferrals under the 2.5% limitation could adversely affect Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Previous wording

Our electric generation, transmission, and distribution and natural gas distribution and storage operations must comply with a variety of statutes and regulations relating to the protection of the environment and human health and safety, including permitting programs implemented by federal, state, and local authorities. Such environmental laws address air emissions; discharges to water bodies; the storage, handling and disposal of hazardous substances and waste materials; siting and land use requirements; and potential ecological impacts. Complex and lengthy processes are required to obtain and renew approvals, permits, and licenses for new, existing, or modified energy-related facilities. Additionally, the use and handling of various chemicals or hazardous materials require release prevention plans and emergency response procedures. Further, we are subject to risks from changing or conflicting interpretations of existing laws, modifications to existing laws, new laws, new or modified permit terms, and enforcement of environmental laws and permits by federal, state, and local authorities.

Current wording

Our electric generation, transmission, and distribution and natural gas distribution and storage operations must comply with a variety of statutes and regulations relating to the protection of the environment and human health and safety, including permitting programs implemented by federal, state, and local authorities. Such environmental laws regulate air emissions; protect water bodies; manage the handling and disposal of hazardous substances and waste materials; siting and land use requirements; and potential ecological impacts. Complex and lengthy processes are required to obtain and renew approvals, permits, and licenses for new, existing, or modified energy-related facilities. Additionally, the use and handling of various chemicals or hazardous materials require release prevention plans and emergency response procedures. Further, we are subject to risks from changing or conflicting interpretations of existing laws, modifications to existing laws, new laws, new or modified permit terms, and enforcement of environmental laws and permits by federal, state, and local authorities.

Previous wording

Environmental regulations have a significant impact on the electric utility industry and compliance with these regulations could be costly for Ameren Missouri, which operates coal-fired power plants. As of December 31, 2023, Ameren Missouri’s coal-fired energy centers represented 8% and 16% of Ameren’s and Ameren Missouri’s rate base, respectively. Regulations under the Clean Air Act that apply to the electric utility industry include the NSPS, the CSAPR, the MATS, and the National Ambient Air Quality Standards, which are subject to periodic review for certain pollutants. Collectively, these regulations cover a variety of pollutants, such as SO 2, particulate matter, NOx, mercury, toxic metals and acid gases, and CO 2 emissions. Regulations implementing the Clean Water Act govern both intake and discharges of water, as well as evaluation of the ecological and biological impact of those operations, and could require modifications to water intake structures or more stringent limitations on wastewater discharges. Depending upon the scope of modifications ultimately required by state regulators, capital expenditures associated with these modifications could be significant. The management and disposal of coal ash is regulated under the Resource Conservation and Recovery Act and the CCR Rule, which require the closure of surface impoundments at Ameren Missouri’s coal-fired energy centers. The individual or combined effects of compliance with existing and new environmental regulations could result in significant capital expenditures, increased operating costs, or the closure or alteration of operations at some of Ameren Missouri’s energy centers.

Current wording

Environmental regulations have a significant impact on the electric utility industry and compliance with these regulations could be costly for Ameren Missouri, which operates coal-fired and natural gas-fired energy centers. As of December 31, 2024, Ameren Missouri’s coal-fired energy centers represented 6% and 11% of Ameren’s and Ameren Missouri’s rate base, respectively. Compliance obligations under the Clean Air Act include the NSPS, the MATS, emission allowance programs and the CSAPR, and the National Ambient Air Quality Standards, which are subject to periodic review for certain pollutants. Collectively, these regulations cover a variety of pollutants, such as SO 2, particulate matter, NOx, mercury, toxic metals and acid gases, and CO 2 emissions. Regulations implementing the Clean Water Act govern potential impacts from our operations on water bodies including wetlands subject to the Act, as well as evaluation of the ecological and biological impact of those operations. Implementation of the Clean Air Act and the Clean Water Act requirements typically occurs through the issuance of permits by state regulators or resource agencies, and capital expenditures associated with compliance could be significant. Coal-fired energy centers must comply with management and disposal requirements for coal ash under the Resource Conservation and Recovery Act and federal regulations known as the CCR Rule. Surface impoundments at Ameren Missouri’s coal-fired energy centers are subject to closure and groundwater monitoring requirements and the implementations of corrective measures if necessary. The individual or combined effects of compliance with existing and new environmental regulations could result in significant capital expenditures, increased operating costs, or the closure or alteration of operations at some of Ameren Missouri’s energy centers.

Previous wording

The CEJA established emission standards that became effective in September 2021. Ameren Missouri's natural gas-fired energy centers in Illinois are subject to annual limits on emissions, including CO 2 and NOx. Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the closure of the Venice Energy Center by the end of 2029. The reductions could also limit the operations of Ameren Missouri's four other natural gas-fired energy centers located in the state of Illinois, and will result in their closure by 2040. These energy centers are utilized to support peak loads. Subject to conditions in the CEJA, these energy centers may be allowed to exceed the emissions limits in order to maintain reliability of electric utility service.

Current wording

Currently as required by the CEJA, Ameren Missouri's natural gas-fired energy centers in Illinois are subject to annual limits on emissions, including CO 2 and NOx. Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the closure of the Venice Energy Center by the end of 2029. The reductions could also limit the operations of Ameren Missouri's four other natural gas-fired energy centers located in the state of Illinois, and will result in their closure by 2040. These energy centers are utilized to support peak loads. Subject to conditions in the CEJA, these energy centers may be allowed to exceed the emissions limits in order to maintain reliability of electric utility service.

Previous wording

Ameren and Ameren Missouri have incurred, and expect to incur, significant costs with respect to environmental compliance and site remediation. New or revised environmental regulations, enforcement initiatives, or legislation could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, reduced operations or closure of some of Ameren Missouri’s coal-and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Actions required to ensure that Ameren Missouri’s facilities and operations are in compliance with environmental laws could be prohibitively expensive for Ameren Missouri if the costs are not fully recovered through rates. Environmental laws could require Ameren Missouri to close or to alter significantly the operations of its energy centers. If Ameren Missouri requests recovery of capital expenditures and costs for environmental compliance through rates, the MoPSC could deny recovery of all or a portion of these costs, prevent timely recovery, or make changes to the regulatory framework in an effort to minimize rate volatility and customer rate increases. Capital expenditures and costs to comply with future legislation or regulations might result in Ameren Missouri closing coal-fired energy centers earlier than planned. If these costs are not recoverable through base rates or other regulatory mechanisms, it could lead to an impairment of assets and reduced revenues. Any of the foregoing could have an adverse effect on our results of operations, financial positions, and liquidity.

Current wording

Ameren and Ameren Missouri have incurred, and expect to incur, significant costs with respect to environmental compliance and site remediation. New or revised environmental regulations, enforcement initiatives, or legislation could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, reduced operations or closure of some of Ameren Missouri’s coal-and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Actions required to ensure that Ameren Missouri’s facilities and operations are in compliance with environmental laws could be prohibitively expensive for Ameren Missouri if the costs are not fully recovered through rates. Environmental laws could require Ameren Missouri to close or to alter significantly the operations of its energy centers. If Ameren Missouri requests recovery of capital expenditures and costs for environmental compliance through rates, the MoPSC could deny recovery of all or a portion of these costs, prevent timely recovery, or make changes to the regulatory framework in an effort to minimize rate volatility and customer rate increases. Capital expenditures and costs to comply with future legislation or regulations could result in Ameren Missouri closing coal-fired energy centers earlier than planned. If these costs are not recoverable through base rates or other regulatory mechanisms, it could lead to an impairment of assets and reduced revenues. Any of the foregoing could have an adverse effect on our results of operations, financial positions, and liquidity.

Previous wording

We are subject to business and financial risks related to the impact of climate change legislation, regulation, and emission reduction goals.

Current wording

We are subject to business and financial risks related to the impact of climate change legislation, regulation, and emission reduction initiatives.

Previous wording

There is increasing concern and activism among various external stakeholders, both nationally and internationally, about climate change, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas. Also, state and local authorities have proposed restrictions on the use of natural gas, and the ICC has initiated a future of gas proceeding to explore issues involved with decarbonization of the natural gas distribution system in the state of Illinois. Further, federal, state, and local authorities, including the United States Congress, have considered initiatives to further restrict greenhouse gases to address global climate change. Additionally, international agreements could lead to future federal or state legislation or regulations. In 2015, the United Nations Framework Convention on Climate Change reached consensus among approximately 190 nations on an agreement, known as the Paris Agreement, that establishes a framework for greenhouse gas mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2 degrees Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5 degrees Celsius. The Biden administration made a policy commitment regarding a reduction in greenhouse gas emissions for the United States, but rulemaking to achieve such reductions has not yet been implemented. Actions taken to implement the Paris Agreement could result in future additional greenhouse gas reduction requirements in the United States. In addition, the EPA has announced plans to implement new climate change programs, including potential regulation of greenhouse gas emissions from the utility industry.

Current wording

There is concern and activism among various external stakeholders, both nationally and internationally, about climate change, including public concerns about the potential environmental impacts from the combustion of fossil fuels, as well as pressure from public interest groups regarding limiting the use of natural gas. Also, state and local authorities have proposed restrictions on the use of natural gas, and the ICC is conducting a future of gas proceeding to explore issues involved with decarbonization of the natural gas distribution system in the state of Illinois. Further, federal, state, and local authorities, including the United States Congress, have considered initiatives to further restrict greenhouse gases to address global climate change, and the EPA previously announced plans to implement new climate change programs, including regulation of greenhouse gas emissions from the utility industry. Additionally, international agreements have in the past, and could again, lead to future federal or state legislation or regulations. In 2015, the United Nations Framework Convention on Climate Change reached consensus among approximately 190 nations on an agreement, known as the Paris Agreement, that establishes a framework for greenhouse gas mitigation actions by all countries, with a goal of holding the increase in global average temperature to below 2 degrees Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5 degrees Celsius. In accordance with the new presidential administration’s approach to United States energy policy, in January 2025, the United States withdrew from the Paris Agreement. The current federal administration is expected to review, and has already revised, compliance requirements under a number of federal environmental regulatory programs; however, differences in energy policy priorities adopted by future federal administrations could result in additional greenhouse gas reduction requirements in the United States.

Previous wording

As a result of our diverse fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO 2 emissions. Future federal and state legislation or regulations that mandate limits on the emission of, or impose taxation on, greenhouse gases could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, or reduced operations of some of Ameren Missouri’s coal- and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might deny some or all of, or defer timely recovery of, these costs. Excessive costs to comply with future legislation or regulations related to climate change might force Ameren Missouri to close some coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Current wording

As a result of our diverse fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO 2 emissions. Future federal and state legislation or regulations that mandate limits on the emission of, or impose taxation on, greenhouse gases could result in a significant increase in capital expenditures and operating costs, decreased revenues, penalties or fines, or reduced operations of some of Ameren Missouri’s coal- and natural gas-fired energy centers, which, in turn, could lead to increased liquidity and financing needs, and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might deny some or all of, or defer timely recovery of, these costs. Excessive costs to comply with future legislation or regulations related to climate change might force Ameren Missouri to close its remaining coal-fired energy centers earlier than planned, which could lead to possible loss on abandonment and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Previous wording

Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels. Ameren’s goals include both direct emissions from operations (scope 1), as well as electricity usage at Ameren buildings (scope 2), including other greenhouse gas emissions of methane, nitrous oxide, and sulfur hexafluoride. Achievement of these goals is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, and the cost of those technologies; natural gas prices; new transmission infrastructure; the ability to maintain system reliability during the transition to clean energy generation; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate change, incentives for clean energy technologies, and environmental regulations. Additional factors associated with operational risks for the construction and acquisition of electric and natural gas infrastructure may also affect the achievement of these goals, as further discussed below. The strategy to achieve these goals also relies on continuing to pursue a diverse portfolio including low-carbon and carbon-free resources and energy-efficiency resources; continuing to participate in efforts to help advance the development of technologies such as carbon capture, utilization, and sequestration; the use of hydrogen fuel for electric production and energy storage, next generation nuclear, and large-scale long-cycle battery energy storage; and constructively engaging with legislators, regulators, investors, customers, and other stakeholders to support outcomes leading to a net-zero future.

Current wording

Ameren is targeting net-zero carbon emissions by 2045, as well as a 60% reduction by 2030 and an 85% reduction by 2040 based on 2005 levels in a safe, reliable, and affordable manner. Ameren’s goals include both reduction of direct emissions from operations (scope 1), as well as electricity usage at Ameren buildings (scope 2), including other greenhouse gas emissions of methane, nitrous oxide, and sulfur hexafluoride. Achievement of these targets is dependent on many factors, including the pace and extent of development and deployment of low- to zero-carbon energy technologies and carbon capture technologies, the cost of those technologies, and support of such technologies by regulators; natural gas prices; new transmission infrastructure; the ability to maintain system reliability during and after the transition to clean energy generation; and constructive energy and economic policies, including those that address investment in energy infrastructure, global climate change, incentives for clean energy technologies, and environmental regulations. Additional factors associated with operational risks for the construction and acquisition of electric and natural gas infrastructure may also affect the achievement of these goals, as further discussed below. The strategy to achieve these goals also relies on continuing to pursue a diverse portfolio, including low-carbon and carbon-free resources and energy-efficiency resources; continuing to participate in efforts to help advance the development of technologies such as carbon capture and sequestration; the use of hydrogen fuel for electric production and energy storage, next generation nuclear, and large-scale long-cycle battery energy storage; and constructively engaging with legislators, regulators, investors, customers, and other stakeholders to support outcomes leading to a net-zero future.

Previous wording

We are subject to FERC regulations, rules, and orders, including standards required by the NERC. As owners and operators of bulk power transmission systems and electric energy centers, we are subject to mandatory NERC reliability standards, including cybersecurity standards. In addition, our natural gas transmission, distribution, and storage facilities systems are subject to PHMSA rules and regulations. Compliance with these reliability standards, rules, and regulations may subject us to higher operating costs and may result in increased capital expenditures. We may also incur higher operating costs to comply with potential new regulations issued by these regulatory bodies. If we were found not to be in compliance with these mandatory NERC reliability standards, PHMSA rules and regulations, or FERC regulations, rules, and orders, we could incur substantial monetary penalties and other sanctions, which could adversely affect our results of operations, financial position, and liquidity. The FERC can impose civil penalties of approximately $1.5 million per violation per day for violation of its regulations, rules, and orders, including mandatory NERC reliability standards. The FERC also conducts audits and reviews of Ameren Missouri’s, Ameren Illinois’, and ATXI’s accounting records to assess the accuracy of their respective formula ratemaking process, and it can require refunds to be issued to customers for previously billed amounts, with interest.

Current wording

We are subject to FERC regulations, rules, and orders, including standards required by the NERC. As owners and operators of bulk power transmission systems and electric energy centers, we are subject to mandatory NERC reliability standards, including cybersecurity standards. In addition, our natural gas transmission, distribution, and storage facilities systems are subject to PHMSA rules and regulations. Compliance with these reliability standards, rules, and regulations may subject us to higher operating costs and may result in increased capital expenditures. We may also incur higher operating costs to comply with potential new executive orders, regulations, or reinterpretations of existing regulations issued by these regulatory bodies. If we were found not to be in compliance with these mandatory NERC reliability standards, PHMSA rules and regulations, or FERC regulations, rules, and orders, we could incur substantial monetary penalties and other sanctions, which could adversely affect our results of operations, financial position, and liquidity. The FERC can impose civil penalties of approximately $1.6 million per violation per day for violation of its regulations, rules, and orders, including mandatory NERC reliability standards. The FERC also conducts audits and reviews of Ameren Missouri’s, Ameren Illinois’, and ATXI’s accounting records to assess the accuracy of their respective formula ratemaking process, and it can require refunds to be issued to customers for previously billed amounts, with interest.

Previous wording

The construction and acquisition of, and capital improvements to, electric and natural gas utility infrastructure, along with Ameren Missouri’s ability to implement its Smart Energy Plan, which is aligned with its 2023 IRP, involve substantial risks.

Current wording

The construction and acquisition of, and capital improvements to, electric and natural gas utility infrastructure, along with Ameren Missouri’s ability to implement its Smart Energy Plan and its 2025 Change to the 2023 PRP, involve substantial risks.

Previous wording

We expect to make significant capital expenditures to maintain and improve our electric and natural gas utility infrastructure and to comply with existing environmental regulations. We estimate that we will invest up to $22.8 billion (Ameren Missouri – up to $13.5 billion; Ameren Illinois – up to $7.6 billion; ATXI – up to $1.7 billion) of capital expenditures from 2024 through 2028. For additional information on these estimates, see Liquidity and Capital Resources – Capital Expenditures in Management’s Discussion and Analysis of Financial Condition and Results of Operations under Part II, Item 7, of this report. Investments in Ameren’s rate-regulated operations are expected to be recoverable from customers, but they are subject to prudence reviews and are exposed to regulatory lag of varying degrees by jurisdiction.

Current wording

We expect to make significant capital expenditures to maintain and improve our electric and natural gas utility infrastructure and to comply with existing environmental regulations. We estimate that we will invest up to $27.4 billion (Ameren Missouri – up to $17.5 billion; Ameren Illinois – up to $7.0 billion; ATXI – up to $2.9 billion) of capital expenditures from 2025 through 2029. For additional information on these estimates, see Liquidity and Capital Resources – Capital Expenditures in Management’s Discussion and Analysis of Financial Condition and Results of Operations under Part II, Item 7, of this report. Investments in Ameren’s rate-regulated operations are expected to be recoverable from customers, but they are subject to prudence reviews and are exposed to regulatory lag of varying degrees by jurisdiction.

Previous wording

Our ability to complete construction projects successfully within projected estimates, including schedule, performance, and/or cost, and to implement Ameren Missouri’s Smart Energy Plan, which may include acquisition of generation facilities after they are constructed, is contingent upon many factors and subject to substantial risks. These factors include, but are not limited to, the following: project management expertise; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, which is dependent upon the availability of necessary labor, materials, and equipment; escalating costs, including but not limited to changes to tariffs on materials or government actions; changes in the scope and timing of projects; the ability to obtain required regulatory, project, and permit approvals; the ability to obtain necessary rights-of-way, easements, and transmission connection agreements at an acceptable cost in a timely fashion; unsatisfactory performance by the projects when completed; the inability to earn an adequate return on invested capital; the ability to raise capital on reasonable terms; geopolitical conflict and other events beyond our control, including construction delays due to weather. With respect to the transition of Ameren Missouri’s generation fleet and carbon emission reduction targets outlined in the 2023 IRP, factors also include Ameren Missouri’s ability to obtain CCNs from the MoPSC, and any other required approvals for the addition of renewable resources or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable or natural gas-fired generation and acquire or construct that generation at a reasonable cost; the ability to obtain NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date; the ability to qualify for, and use or transfer, federal production or investment tax credits; the cost of wind, solar, and other renewable generation and battery storage technologies; the cost of natural gas or hydrogen CT technologies; the ability to maintain system reliability during and after the transition to clean energy generation; new and/or changes in environmental regulations, including those related to CO 2 and other greenhouse gas emissions; energy prices and demand.

Current wording

With respect to the transition of Ameren Missouri’s generation fleet that will be included in its 2025 Change to the 2023 PRP and carbon emission reduction targets, factors also include Ameren Missouri’s ability to obtain CCNs from the MoPSC, and any other required approvals for the addition of renewable resources, battery storage, or nuclear or natural gas-fired generation, retirement of energy centers, and new or continued customer energy-efficiency programs; the ability to enter into agreements for renewable, natural gas-fired, or nuclear generation and acquire or construct that generation at a reasonable cost; the ability to obtain NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date; the continued existence and ability to qualify for, and use or transfer, federal production or investment tax credits; the cost of wind, solar, and other renewable generation and battery storage technologies; the cost of natural gas or hydrogen CT technologies; the cost of nuclear generation; the ability to maintain system reliability during and after the transition to clean energy generation; new and/or changes in environmental regulations, including those related to CO 2 and other greenhouse gas emissions; energy prices; and demand.

Previous wording

Our electric generation, transmission, and distribution facilities are subject to operational risks.

Current wording

Our electric generation and electric and natural gas transmission and distribution facilities, including natural gas storage facilities, are subject to operational risks.

Previous wording

Our financial performance depends on the successful operation of electric generation, transmission, and distribution facilities. Operation of electric generation, transmission, and distribution facilities involves many risks, including:

Current wording

Our financial performance depends on the successful operation of electric generation and electric and natural gas transmission and distribution facilities, including natural gas storage facilities. Operation of these facilities involves many risks, including:

Previous wording

Inherent in our natural gas distribution businesses, which includes transmission, distribution, and storage facilities, are a variety of hazards and operating risks, such as leaks, explosions, mechanical problems and cybersecurity risks, which could cause substantial financial losses, including fines and penalties. In addition, these hazards could result in serious injury, loss of human life, significant damage to property, environmental impacts, and impairment of our operations, which in turn could lead us to incur substantial losses. The location of transmission and distribution mains and storage facilities near populated areas, including residential areas, business centers, industrial sites, and other public gathering places, could increase the level of damages resulting from these risks. A major domestic incident involving natural gas facilities could result in additional capital expenditures and/or increased operations and maintenance expenses for us and increased regulation of natural gas utilities. The occurrence of any of these events could adversely affect our results of operations, financial position, and liquidity.

Current wording

•natural gas leaks or explosions near populated areas, including residential areas, business centers, industrial sites, and other public gathering places;

Previous wording

•disruptions in the delivery of electricity to our customers;

Current wording

•disruptions in the delivery of electricity and natural gas to our customers;

Previous wording

•inability to maintain reliability of our electric utility services as coal-fired energy centers are retired and renewable energy generation is placed in service;

Current wording

•inability to maintain reliability of our electric utility services as coal-fired energy centers are retired and renewable energy generation is placed in service, as well as our ability to meet generation capacity obligations;

Previous wording

•disruptions to the global supply chain as a result of shortages for labor, materials, or equipment, international trade relations, geopolitical conflict, delivery delays, economic pressures, including increased interest rates and inflation, among other things;

Current wording

•disruptions to the global supply chain as a result of shortages for labor, materials, or equipment, tariffs and international trade relations, geopolitical conflict, delivery delays, and economic pressures, including elevated interest rates and inflation, among other things;

Previous wording

•failure of other operators’ facilities and the effect of that failure on our electric system and customers;

Current wording

•failure of other operators’ facilities and the effect of that failure on our electric and natural gas systems and customers;

Previous wording

•unusual or adverse weather conditions or other natural disasters, including those that may result from climate change, such as severe storms, droughts, floods, tornadoes, earthquakes, icing, sustained high or low temperatures, solar flares, and electromagnetic pulses;

Current wording

•unusual or adverse weather conditions or other natural disasters, including but not limited to those that may result from climate change, such as severe storms, droughts, wildfires, floods, tornadoes, earthquakes, icing, sustained high or low temperatures, solar flares, and electromagnetic pulses;

Previous wording

•inability to operate wind generation facilities at full capacity resulting from requirements to protect natural resources, including wildlife;

Current wording

•inability to operate wind generation facilities at full capacity resulting from requirements to protect natural resources, including wildlife, or other conditions limiting full capacity, such as the 2024 collapse of three turbines at the High Prairie Energy Center; pending the results of an ongoing investigation, approximately 90% of the turbines of the High Prairie Energy Center remain idle and the timing and costs necessary to return the energy center to full capacity are uncertain;

Previous wording

•limitations on amounts of insurance available to cover losses that might arise in connection with operating our electric generation, transmission, and distribution facilities;

Current wording

•limitations on amounts of insurance available to cover losses that might arise in connection with operating our electric generation facilities, electric and natural gas transmission and distribution facilities, and natural gas storage facilities;

Previous wording

The foregoing risks could affect the controls and operations of our facilities or impede our ability to meet regulatory requirements, which could increase operating costs, increase our capital requirements and costs, reduce our revenues, or have an adverse effect on our liquidity.

Current wording

The foregoing risks could affect the operations of our facilities, impede our ability to meet regulatory requirements, or expose us to an increase in litigation, which could increase operating costs, increase our capital requirements and costs, reduce our revenues, or have an adverse effect on our liquidity.

Previous wording

Ameren Missouri owns and operates coal-fired energy centers. About 97% of Ameren Missouri’s coal is purchased from the Powder River Basin in Wyoming, which has a limited number of suppliers. Deliveries from the Powder River Basin have occasionally been restricted because of rail congestion, staffing and equipment issues, infrastructure maintenance, derailments, weather, and supplier financial hardship. As of December 31, 2023, coal inventory at the Labadie Energy Center was below targeted levels and coal inventory at the Sioux Energy Center was at targeted levels. Additional delays or disruptions in the delivery of coal, failure of our coal suppliers to provide adequate quantities or quality of coal, or lack of adequate inventories of coal, including low-sulfur coal used to comply with environmental regulations, could have adverse effects on Ameren Missouri’s electric generation operations. If Ameren Missouri is unable to obtain an adequate supply of coal under existing agreements, it may be required to purchase coal at higher prices or be forced to reduce generation at its coal-fired energy centers, which could adversely affect Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Current wording

Ameren Missouri owns and operates coal-fired energy centers. About 97% of Ameren Missouri’s coal is purchased from the Powder River Basin in Wyoming, which has a limited number of suppliers. Deliveries from the Powder River Basin have occasionally been restricted because of rail congestion, staffing and equipment issues, infrastructure maintenance, derailments, weather, and supplier financial hardship. As of December 31, 2024, coal inventory at the Labadie and Sioux energy centers were at targeted levels. Delays or disruptions in the delivery of coal, failure of our coal suppliers to provide adequate quantities or quality of coal, or lack of adequate inventories of coal, including low-sulfur coal used to comply with environmental regulations, could have adverse effects on Ameren Missouri’s electric generation operations. If Ameren Missouri is unable to obtain an adequate supply of coal under existing agreements, it may be required to purchase coal at higher prices or be forced to reduce generation at its coal-fired energy centers, which could adversely affect Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity.

Previous wording

•uncertainties about contingencies and retrospective premium assessments relating to claims at the Callaway Energy Center or other United States nuclear facilities;

Current wording

•uncertainties about contingencies and retrospective insurance premium assessments relating to claims at the Callaway Energy Center or other United States nuclear facilities;

Previous wording

•the ability to continue to attract and maintain qualified labor to operate the Callaway Energy Center;

Current wording

•the ability to continue to attract and retain qualified labor to operate the Callaway Energy Center;

Previous wording

The NRC has broad authority under federal law to impose licensing and safety requirements for nuclear facilities. In the event of noncompliance, the NRC has the authority to impose fines or to shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated from time to time by the NRC could necessitate substantial capital expenditures at the Callaway Energy Center. In addition, if a serious nuclear incident were to occur, it could adversely affect Ameren’s and Ameren Missouri’s results of operations, financial condition, and liquidity. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation of any domestic nuclear unit and could also cause the NRC to impose additional conditions or requirements on the industry, which could increase costs and result in additional capital expenditures. While the Callaway Energy Center is in compliance with the current NRC standards relating to seismic design and risk, these standards also require Ameren Missouri to address periodic changes to seismic hazard data and evaluation methods for the impact of an earthquake on its Callaway Energy Center due to its proximity to a fault line, which could require seismic risk evaluation updates and installation of additional capital equipment.

Current wording

The NRC has broad authority under federal law to impose licensing and safety requirements for nuclear facilities. In the event of noncompliance, the NRC has the authority to impose fines or to shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated from time to time by the NRC could necessitate substantial capital expenditures at the Callaway Energy Center. In addition, if a serious nuclear incident were to occur and result in serious injury, loss of human life, significant damage to property, environmental impacts, and impairment of our operations, it would adversely affect Ameren’s and Ameren Missouri’s results of operations, financial condition, and liquidity. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation of any domestic nuclear unit and could also cause the NRC to impose additional conditions or requirements on the industry, which could increase costs and result in additional capital expenditures. While the Callaway Energy Center is in compliance with the current NRC standards relating to seismic design and risk, these standards also require Ameren Missouri to address periodic changes to seismic hazard data and evaluation methods for the impact of an earthquake on its Callaway Energy Center due to its proximity to a fault line, which could require seismic risk evaluation updates and installation of additional capital equipment.

Previous wording

Our aging infrastructure may pose risks to system reliability and expose us to expedited or unplanned significant capital expenditures and operating costs. All of Ameren Missouri’s coal-fired energy centers were constructed prior to 1978, and the Callaway Energy Center began operating in 1984. The age of these energy centers increases the risks of unplanned outages, reduced generation output, and higher maintenance expense. Also, as discussed above, Ameren Missouri expects to retire the Rush Island Energy Center by October 15, 2024. Further, Ameren Missouri would be adversely affected if the MoPSC does not allow recovery of the remaining investment and decommissioning costs associated with the retirement of an energy center, as well as the ability to earn a return on that remaining investment and those decommissioning costs. Aging transmission and distribution facilities are more prone to failure than new facilities, which results in higher maintenance expense and the need to replace these facilities with new infrastructure. Even when the system is properly maintained, its reliability may ultimately deteriorate and negatively affect our ability to serve our customers, which could result in increased costs associated with regulatory oversight. The frequency and duration of customer outages are among the CEJA performance standards. Any failure to achieve these standards will result in a reduction in Ameren Illinois’ allowed ROE on electric distribution assets. The higher maintenance costs associated with aging infrastructure and capital expenditures for new or replacement infrastructure, compounded by high interest rates and inflationary pressures, could cause additional rate volatility for our customers, resistance by our regulators to allow customer rate increases, and/or regulatory lag in some of our jurisdictions, any of which could adversely affect our results of operations, financial position, and liquidity.

Current wording

Our aging infrastructure may pose risks to system reliability and expose us to expedited or unplanned significant capital expenditures and operating costs. Both of Ameren Missouri’s coal-fired energy centers were constructed prior to 1978, and the Callaway Energy Center began operating in 1984. The age of these energy centers increases the risks of unplanned outages, reduced generation output, and higher maintenance expense. Further, Ameren Missouri would be adversely affected if the MoPSC does not allow recovery of the remaining investment and decommissioning costs associated with the retirement of an energy center, as well as the ability to earn a return on that remaining investment and those decommissioning costs. Aging transmission and distribution facilities are more prone to failure than new facilities, which results in higher maintenance expense and the need to replace these facilities with new infrastructure. Even when the system is properly maintained, its reliability may ultimately deteriorate and negatively affect our ability to serve our customers, which could result in increased costs subject to regulatory recovery risk. The frequency and duration of customer outages are among the CEJA performance standards. Any failure to achieve these standards will result in a reduction in Ameren Illinois’ allowed ROE on electric distribution assets. The higher maintenance costs associated with aging infrastructure and capital expenditures for new or replacement infrastructure, compounded by high interest rates and inflationary pressures, could cause additional rate volatility for our customers, resistance by our regulators to allow customer rate increases, and/or regulatory lag in some of our jurisdictions, any of which could adversely affect our results of operations, financial position, and liquidity.

Previous wording

Energy conservation, energy efficiency, distributed generation, energy storage, technological advances, and other factors could reduce energy demand from our customers.

Current wording

Forecasted energy demand from potential new customers and electrification might not be realized. Energy conservation, energy efficiency, distributed generation, energy storage, technological advances, and other factors could reduce energy demand from our existing customers.

Previous wording

Ameren is a holding company; therefore, its primary assets are its investments in the common stock of its subsidiaries, including Ameren Missouri, Ameren Illinois, and ATXI. As a result, Ameren’s ability to pay dividends on its common stock depends on the earnings of its subsidiaries and the ability of its subsidiaries to pay dividends or otherwise transfer funds to Ameren. Similarly, Ameren’s ability to service its debt obligations is dependent upon the earnings of its operating subsidiaries and the distribution of those earnings and other payments, including payments of principal and interest under affiliate indebtedness. The payment of dividends to Ameren by its subsidiaries in turn depends on their results of operations, and other items affecting retained earnings, and available cash. Ameren’s subsidiaries are separate and distinct legal entities and have no obligation, contingent or otherwise, to pay any dividends or make any other distributions (except for payments required pursuant to the terms of affiliate borrowing arrangements and cash payments under the tax allocation agreement) to Ameren. Under the IRA, a 15% minimum tax on adjusted financial statement income, as defined in the law, is assessed against corporations whose average annual adjusted financial statement income exceeds $1 billion for three consecutive preceding tax years effective for tax years beginning after December 31, 2022. Once a corporation exceeds this three-year average annual adjusted financial statement income threshold, it will be subject to the minimum tax for all future tax years. As Ameren files a consolidated income tax return, it is reliant on its subsidiaries to pay the minimum tax once the threshold is exceeded. The payments related to the minimum tax by Ameren Missouri, Ameren Illinois, and ATXI are expected to be recovered, subject to approval by their respective regulators. Certain financing agreements, corporate organizational documents, and certain statutory and regulatory requirements may impose restrictions on the ability of Ameren Missouri, Ameren Illinois, and ATXI to transfer funds to Ameren in the form of cash dividends, loans, or advances.

Current wording

Ameren is a holding company; therefore, its primary assets are its investments in the common stock of its subsidiaries, including Ameren Missouri, Ameren Illinois, and ATXI. As a result, Ameren’s ability to pay dividends on its common stock depends on the earnings of its subsidiaries and the ability of its subsidiaries to pay dividends or otherwise transfer funds to Ameren. Similarly, Ameren’s ability to service its debt obligations is dependent upon the earnings of its operating subsidiaries and the distribution of those earnings and other payments, including payments of principal and interest under affiliate indebtedness. The payment of dividends to Ameren by its subsidiaries in turn depends on the subsidiaries’ results of operations, and other items affecting retained earnings, and available cash. Ameren’s subsidiaries are separate and distinct legal entities and have no obligation, contingent or otherwise, to pay any dividends or make any other distributions (except for payments required pursuant to the terms of affiliate borrowing arrangements and cash payments under the tax allocation agreement) to Ameren. Under the IRA, a 15% minimum tax on adjusted financial statement income, as defined in the law, is assessed against corporations whose average annual adjusted financial statement income exceeds $1 billion for three consecutive preceding tax years effective for tax years beginning after December 31, 2022. Once a corporation exceeds this three-year average annual adjusted financial statement income threshold, it will be subject to the minimum tax for all future tax years. As Ameren files a consolidated income tax return, it is reliant on its subsidiaries to pay the minimum tax once the threshold is exceeded. The payments related to the minimum tax by Ameren

Previous wording

A part of our core strategy focuses on disciplined cost management, including prudently monitoring all of our expenses. However, we have observed inflationary pressures related to prices of labor, services, materials and supplies, and other costs. We are uncertain whether these inflationary pressures will continue and at what rate. These inflationary pressures, as well as high interest rates, could impact our ability to control costs, to make substantial investments in our businesses, to recover costs and investments, to earn our allowed ROEs within frameworks established by our regulators, and/or to maintain affordability of our services for our customers. In addition, these inflationary pressures and high interest rates could adversely affect our customers’ usage of, or payment for, our services. Additionally, volatility in the commodities market could increase collateral postings and prepayments. Also, market volatility could significantly affect the investment performance of Ameren’s COLI. Significant increases in our costs could increase our financing needs and otherwise adversely affect our results of operations, financial position, and liquidity. For additional information on purchased power costs, see Outlook under Part II, Item 7, of this report.

Current wording

A part of our core strategy focuses on disciplined cost management, including prudently monitoring all of our expenses. Higher than expected inflation levels could continue to put pressure on the prices of labor, services, materials and supplies, and other costs. Elevated inflation levels, as well as elevated interest rates, tariffs, trade wars, or a recession could impact our ability to control costs, to make substantial investments in our businesses, to recover costs and investments, to earn our allowed ROEs within frameworks established by our regulators, and/or to maintain affordability of our services for our customers. In addition, these various economic pressures could adversely affect our customers’ usage of, or payment for, our services. Additionally, volatility in the commodities market could increase collateral postings and prepayments. Also, market volatility could significantly affect the investment performance of Ameren’s COLI. Significant increases in our costs could increase our financing needs and otherwise adversely affect our results of operations, financial position, and liquidity.

Showing the first 40 of 51 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

Our ability to complete construction projects successfully within projected estimates, including schedule, performance, and/or cost, and to implement Ameren Missouri’s Smart Energy Plan, which may include acquisition of generation facilities after they are constructed, is contingent upon many factors and subject to substantial risks. These factors include, but are not limited to, the following: project management expertise; the ability of suppliers, contractors, and developers to meet contractual commitments and timely complete projects, which is dependent upon the availability of necessary labor, materials, and equipment; escalating costs, including but not limited to changes to tariffs on materials or government actions; changes in the scope and timing of projects; the ability to obtain required regulatory, project, and permit approvals; the ability to obtain necessary rights-of-way, easements, and transmission connection agreements at an acceptable cost in a timely fashion; unsatisfactory performance by the projects when completed; the inability to earn an adequate return on invested capital; the ability to raise capital on reasonable terms; geopolitical conflict and other events beyond our control, including delays arising from government shutdowns or construction delays due to weather.

Current report — wording carried from elsewhere

Missouri, Ameren Illinois, and ATXI are expected to be recovered, subject to approval by their respective regulators. In addition, interpretations, regulations, amendments, or technical corrections that affect the amount and timing of income tax payments, credits available, or the transferability of production and investment tax credits could adversely affect our liquidity. Certain financing agreements, corporate organizational documents, and certain statutory and regulatory requirements may impose restrictions on the ability of Ameren Missouri, Ameren Illinois, and ATXI to transfer funds to Ameren in the form of cash dividends, loans, or advances.