AST SpaceMobile, Inc.
For the period ended Jun 30, 2025. Filed Aug 11, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2025 · Filed Aug 11, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-03-31; filed 2025-05-12.
0000950170-25-069403
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-06-30; filed 2025-08-11.
0000950170-25-106627
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 166 previous paragraphs and 191 current paragraphs.
77 unchanged; 52 reworded; 48 added; 36 removed; 1 previous and 14 current paragraphs rearranged.
Tables are not compared: 2 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (48)
Current report
In March 2025, we entered into agreements with Ligado for the Spectrum Usage Rights Transaction (defined below) which was approved by the Bankruptcy Court on June 23, 2025. The closing of the Spectrum Usage Rights Transaction is still subject to receipt of satisfactory regulatory approvals required for the proposed use of the spectrum, as well as other closing conditions.
Current report
On June 13, 2025, we announced a Term Sheet (defined below) among various parties including us, Ligado, Viasat, Inc. and Inmarsat Global Limited (“Inmarsat”). The Term Sheet provides that, among other things, as part of Ligado’s ongoing restructuring, Inmarsat will support us receiving long-term spectrum usage rights for 80 years or more with respect to up to 40 MHz of L-Band MSS spectrum in the United States and Canada held by Ligado, plus access to up to an additional 5 MHz in the 1670-1675 MHz Band in the United States. In addition, under the Term Sheet, Inmarsat has agreed to provide affirmative support for our planned regulatory applications with the FCC in the United States and Innovation, Science and Economic Development (“ISED”) in Canada seeking authority to operate a Non-Geostationary Orbit (“NGSO”) system within the L-Band mid-band spectrum in North America.
Current report
The Term Sheet supplements the definitive documents previously entered into between us and Ligado. Closing of the Ligado Transaction will be subject to receipt of satisfactory regulatory approvals required for the proposed use of the spectrum, as well as other closing conditions. The Term Sheet also provides that, of the $550.0 million consideration to be paid by us to Ligado, $535.0 million will be paid to Ligado for the benefit of Inmarsat so long as Ligado’s Chapter 11 plan is confirmed and the financial sponsors of Ligado provide a backstop commitment to Ligado that is acceptable to us, in support of a full refund of payments by Ligado in the event applicable regulatory approvals are not obtained and the closing does not occur.
Current report
On July 15, 2025, SpectrumCo entered into the Sound Point Credit Facility with Sound Point Agency LLC and the lenders from time to time party thereto. The proceeds of the loan borrowed under the Sound Point Credit Facility would be used to support certain payment obligations owed to Ligado relating to the Spectrum Usage Rights Transaction. The Sound Point Credit Facility will be available to SpectrumCo upon the satisfaction of certain conditions, including receipt of all required regulatory and FCC approvals relating to the Spectrum Usage Rights Transaction. Refer to discussion under “Spectrum Usage Rights Transaction and Related Financing” in the “Liquidity and Capital Resources” section below for further details.
Current report
No assurance can be provided that the Ligado transaction will be consummated or that the related financing will be disbursed. The Ligado transaction and the disbursement of the related financing are subject to a number of conditions, including regulatory approval. In addition, Ligado’s ongoing bankruptcy proceedings present risks that the Ligado transaction will not be consummated. Moreover, even if the Ligado transaction is consummated, the benefits of the Ligado transaction will be subject to, among other things, integration, technology and regulatory risks. The Ligado transaction may significantly increase our indebtedness (though any debt incurred pursuant to the Sound Point Credit Facility will be non-recourse to us) and our annual required cash spend.
Current report
Vodafone Joint Venture
Current report
On July 7, 2025, we entered into an agreement with Vodafone to create a jointly-owned European satellite service business (“SatCo”), headquartered in Luxembourg, to exclusively distribute AST SpaceMobile’s broadband satellite services to MNOs in European markets. In addition, SatCo is expected to deploy a small network of earth stations that integrate with operators of existing 4G/5G terrestrial networks, providing backhaul links, as well as extended coverage across Europe from our anticipated satellite constellation in LEO.
Current report
Vodafone Idea Strategic Partnership
Current report
On June 18, 2025, we announced a strategic partnership with Vodafone Idea (“Vi”), India’s leading telecom service provider, to expand mobile connectivity across India’s unconnected regions. AST SpaceMobile and Vi intend to collaborate on the design, implementation, and launch of the SpaceMobile Satellite System, a space-based Cellular Broadband ecosystem that will be designed to expand Vi’s telecom services of terrestrial connectivity, providing voice, video, data streaming, and internet access. We are expected to develop, manufacture, and manage the satellite constellation, and Vi is expected to oversee terrestrial network integration, operating spectrum, and market access.
Current report
On July 29, 2025, we issued $575.0 million aggregate principal amount of convertible senior notes due 2032, including the exercise in full of the option granted to the initial purchasers to purchase up to $75.0 million aggregate principal amount of notes. The 2032 2.375% Convertible Notes are our senior, unsecured obligations and bear interest at a fixed rate of 2.375% per year, payable semiannually in arrears on April 15 and October 15 of each year, beginning on April 15, 2026. The 2032 2.375% Convertible Notes will mature on October 15, 2032, unless earlier repurchased, redeemed, or converted. The 2032 2.375% Convertible Notes are convertible at the option of the holders under certain circumstances. Upon conversion, we will pay or deliver, as the case may be, cash, shares of our Class A Common Stock or a combination of cash and shares of our Class A Common Stock, at our election. Refer to discussion under “2032 2.375% Convertible Notes” in the “Liquidity and Capital Resources” section below for further details.
Current report
July 2025 Capped Calls
Current report
On July 29, 2025, in connection with the issuance of the 2032 2.375% Convertible Notes, we entered into privately negotiated July 2025 Capped Calls with certain financial institutions at a cost of approximately $54.0 million. The July 2025 Capped Calls cover, subject to anti-dilution adjustments, the number of shares of Class A Common Stock underlying the 2032 2.375% Convertible Notes. The July 2025 Capped Calls have an initial strike price of approximately $72.07 per share and an initial cap price of $120.12 per share, which are subject to certain adjustments under the terms of the July 2025 Capped Calls.
Current report
Repurchases of Existing Convertible Notes
Current report
On July 3, 2025 and July 31, 2025, we completed the repurchase of $225.0 million and $135.0 million, respectively, of the outstanding principal amount of the 2032 4.25% Convertible Notes in separate, privately negotiated repurchase transactions with a limited number of note holders and funded the repurchases with the net proceeds from a registered direct offering of 9,450,268 and 5,775,635 shares of our Class A Common Stock to the same note holders participating in the note repurchases. Refer to discussion under “2032 4.25% Convertible Notes” in the “Liquidity and Capital Resources” section below for further details.
Current report
On August 5, 2025, we entered into an agreement to acquire an entity that holds certain S-Band ITU priority rights to MSS frequencies in the range of 1980-2010 MHz and 2170-2200 MHz, for use in LEO (the “Transaction”). The Transaction has a total consideration of $64.5 million, to be paid in stock or cash at our election, with (i) $26.0 million to be paid at closing, (ii) $10.0 million to be paid on the second anniversary of closing, and (iii) $10.0 million to be paid on the third anniversary of closing. Additionally, we are obligated to pay $16.65 million upon the successful launch and effective in-service of a L/S satellite to be manufactured and $1.85 million upon continuous operation of such L/S satellite for a period of at least ninety (90) days. The Transaction is expected to close in the second half of 2025, subject to completion of customary closing conditions.
Current report
Three Months Ended June 30, 2025 Compared to the Three Months Ended June 30, 2024
Current report
Revenues increased by $0.3 million, or 28%, to $1.2 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The increase was primarily attributable to increase in revenue from completion of performance obligations under agreements with prime contractors for U.S. Government contracts.
Current report
Total general and administrative costs increased by $9.4 million, or 53%, to $27.2 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The increase was attributable to a $5.4 million increase in legal costs largely driven by our Spectrum Usage Rights Transaction and related financing and our joint venture with Vodafone, a $2.3 million increase in consultants and other professional services, $1.0 million increase in payroll and employee related costs driven by an increase in headcount, and a $0.7 million increase in other expense.
Current report
Six Months Ended June 30, 2025 Compared to the Six Months Ended June 30, 2024
Current report
Total engineering services costs increased by $15.1 million, or 37%, to $55.8 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase was attributable to a $9.8 million increase in payroll and employee related costs driven by an increase in headcount and higher stock-based compensation expenses, a $2.2 million increase in AIT facilities and activities and engineering development centers costs resulting from the expansion of our global facilities footprint, a $2.1 million increase in consultants and professional fees, and a $1.0 million increase in other expenses.
Current report
Total general and administrative costs increased by $15.5 million, or 51%, to $45.6 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase was attributable to a $6.7 million increase in legal costs largely driven by our Spectrum Usage Rights Transaction and related financing and our joint venture with Vodafone, a $5.8 million increase in consultants and other professional services, a $2.2 million increase in payroll and employee related costs driven by an increase in headcount, and a $0.8 million increase in other expenses.
Current report
Total R&D costs increased by $4.8 million, or 55%, to $13.5 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase in R&D costs was primarily attributable to the development and design of the Block 2 BB satellites beyond FM 1, partially offset by completion of the development of the Block 1 BB satellites.
Current report
Other expense, net was $0.4 million for the six months ended June 30, 2025, as compared to other income, net of $0.3 million for the six months ended June 30, 2024. The $0.7 million increase in other expense, net was primarily due to a $2.6 million decrease in other non-operating income and a $0.3 million increase in other expense, partially offset by a $2.2 million decrease in loss on disposal of fixed assets.
Current report
On March 22, 2025, pursuant to the Strategic Collaboration Term Sheet, we, AST LLC, Spectrum USA I, LLC, a subsidiary of AST LLC (“SpectrumCo”) and Ligado entered into certain definitive agreements that, among other things, provided for (1) a $550.0 million contingent payment from us to Ligado, (2) our obligation to make spectrum access usage payments of at least $80.0 million annually (“L-band Annual Payment”) (with the option to pay the excess of the amount owed by Ligado to utilize the L-band spectrum in our Class A Common Stock for the first three years), and revenue share payments in exchange for the right to use the up to 40 MHz of the L-band spectrum, (3) our obligation to pay a usage fee amount due in cash (plus a 30% premium with respect to each such payment payable in our Class A Common Stock) (the “Crown Castle Annual Payment”) for the right to use the up to 5 MHz of the 1670-1675 MHz Spectrum, and (4) issuance of 4,714,226 penny warrants (“Penny Warrants”) to Ligado exercisable for shares of our Class A Common Stock at an exercise price per share equal to $0.01 per share, subject to a 12-month lock-up.
Current report
On June 23, 2025, the Bankruptcy Court approved the transactions (the “Spectrum Usage Rights Transaction”) contemplated in the Strategic Collaboration Term Sheet. The closing of the Spectrum Usage Rights Transaction is subject to receipt of satisfactory regulatory approvals required for the proposed use of the spectrum, as well as other closing conditions.
Current report
Settlement Term Sheet
Current report
On June 13, 2025, we announced a Settlement Term Sheet (the “Term Sheet”) among various parties including us, Ligado, Viasat, Inc. and Inmarsat. Pursuant to the Term Sheet, once Ligado’s Chapter 11 plan is confirmed and as long as the financial sponsors of Ligado provide a backstop commitment to Ligado that is acceptable to us, in support of a full refund of payments by Ligado in the event applicable regulatory approvals are not obtained and the closing does not occur, we have agreed that, with respect to the $550.0 million otherwise owed to Ligado in connection with the Spectrum Usage Rights Transaction, we will pay $420.0 million to Ligado for the benefit of Inmarsat on October 31, 2025, $100.0 million to Ligado for the benefit of Inmarsat on March 31, 2026 and $15.0 million to Ligado for the benefit of Inmarsat on receipt of specified regulatory approvals and the closing of the Spectrum Usage Rights Transaction. The remaining $15.0 million would be paid to Ligado at closing. We intend to seek institutional financing based on this refund obligation (supported by the backstop commitment) to facilitate these obligations prior to the non-recourse senior-secured delayed-draw loan facility (described below) becoming available, although there is no assurance that it will be able to do so. Our obligation to make the L-band Annual Payment to Ligado began on June 23, 2025, and we have also commenced paying sublease spectrum amounts under the sublease with Crown Castle MM Holding LLC.
Current report
Sound Point Credit Facility
Current report
To support the consideration that may become payable under the definitive agreements related to the Spectrum Usage Rights Transaction described above, on July 15, 2025 (the “Credit Facility Closing Date”), SpectrumCo entered into a credit agreement (the “Credit Agreement”) with Sound Point Agency LLC, as administrative agent and collateral agent, and the lenders from time to time party thereto. The Credit Agreement provides for a non-recourse senior-secured delayed-draw term loan facility (“Sound Point Credit Facility”) in an aggregate principal amount of $550.0 million (“Loan Amount”). The Sound Point Credit Facility will be available to draw until October 5, 2026 with an option to extend for an additional 180 days (“Availability Period”) subject to payment of an additional 1% fee on the Loan Amount. The Sound Point Credit Facility will be available to SpectrumCo upon the satisfaction of certain conditions, including, among others, (i) entry into security documents and other related documents, (ii) receipt of all required regulatory and FCC approvals relating to the Spectrum Usage Rights Transaction, (iii) confirmation and occurrence of certain bankruptcy-related events pertaining to Ligado and (iv) certain other customary conditions to funding.
Current report
Loans drawn under the Sound Point Credit Facility will bear interest, at SpectrumCo’s option, at either (i) Term SOFR plus an applicable margin of 8.0% per annum or (ii) an alternate base rate plus an applicable margin of 9.0% per annum. The scheduled maturity date will depend on the funding date, ranging from 48 to 60 months after funding, and any prepayments made prior to 30 months after the funding date will be subject to a premium (which decreases over time).
Current report
SpectrumCo’s obligations under the Sound Point Credit Facility will be secured by a first-priority lien over substantially all of its assets and by a pledge by AST LLC of its equity interests in SpectrumCo. SpectrumCo’s obligations will not be guaranteed by us or any of our subsidiaries and will not be secured by any assets of us or any of our subsidiaries, except to the extent stated herein, and the affirmative and negative covenants apply only to SpectrumCo and any guarantor. Neither we nor AST LLC will be liable as a borrower or guarantor or otherwise for any payments owing in connection with the Sound Point Credit Facility, and the lenders’ recourse to the assets of AST LLC will be limited to AST LLC’s equity interests both in SpectrumCo and in the newly formed subsidiary that will purchase and collect the receivables associated with the revenues generated from use of the L-band spectrum. The Sound Point Credit Facility contains customary affirmative and negative covenants, customary events of default (subject to grace periods, where applicable), and a minimum liquidity covenant (applicable to SpectrumCo at all times following the funding date) calculated by reference to payments owed to Ligado in connection with the Spectrum Usage Rights Transaction.
Current report
No assurance can be provided that the Ligado transaction will be consummated or that the related financing will be disbursed. The Ligado transaction and the disbursement of the related financing are subject to a number of conditions, including regulatory approval. In addition, Ligado’s ongoing bankruptcy proceedings present risks that the Ligado transaction will not be consummated. Moreover, even if the Ligado transaction is consummated, the benefits of the Ligado transaction will be subject to, among other things, integration, technology and regulatory risks. The Ligado transaction may significantly increase our indebtedness (though any debt incurred pursuant to the Sound Point Credit Facility will be non-recourse to us) and our annual required cash spend.
Current report
On August 5, 2025, we entered into an agreement to acquire an entity that holds certain S-Band ITU priority rights to MSS frequencies in the range of 1980-2010 MHz and 2170-2200 MHz, for use in LEO. The Transaction has a total consideration of $64.5 million, to be paid in stock or cash at our election, with (i) $26.0 million to be paid at closing, (ii) $10.0 million to be paid on the second anniversary of closing, and (iii) $10.0 million to be paid on the third anniversary of closing. Additionally, we are obligated to pay $16.65 million upon the successful launch and effective in-service of a L/S satellite to be manufactured and $1.85 million upon continuous operation of such L/S satellite for a period of at least ninety (90) days. The Transaction is expected to close during the second half of 2025, subject to completion of customary closing conditions.
Current report
Under the 2024 Sales Agreement, we issued 928,441 and 2,918,407 shares of our Class A Common Stock during the three and six months ended June 30, 2025, respectively, and received proceeds of approximately $19.9 million and approximately $74.8 million, respectively, net of commissions paid to the agents and transaction costs. During the three and six months ended June 30, 2025, we paid commission of approximately $0.5 million and approximately $1.9 million to the agents with respect to such sales, respectively. Having utilized virtually the entire capacity of the 2024 ATM Equity Program, we terminated the 2024 ATM Equity Program on May 13, 2025 when we entered into the 2025 ATM Equity Program (defined below). Proceeds from the sale of the Class A Common Stock under the 2024 Sales Agreement were used for general corporate purposes.
Current report
2025 Equity Distribution Agreement
Current report
Under the 2025 Sales Agreement, we issued 11,129,048 shares of our Class A Common Stock during the three months ended June 30, 2025, and received proceeds of approximately $377.4 million, net of commissions paid to the agents and transaction costs. During the three months ended June 30, 2025, we paid commission of approximately $8.7 million to the agents with respect to such sales. In July 2025, we issued 2,476,311 shares of our Class A Common Stock and raised proceeds of approximately $111.3 million, net of commissions of approximately $2.6 million paid to the agents. Having utilized virtually the entire capacity of the 2025 ATM Equity Program, we terminated the 2025 ATM Equity Program on July 23, 2025. Proceeds from the sale of the Class A Common Stock under the 2025 Sales Agreement were and will continue to be used for general corporate purposes.
Current report
Prosperity Term Loan
Current report
Prosperity Capital Equipment Loan
Current report
Trinity Capital Equipment Loan
Current report
On June 27, 2025, we entered into a Master Equipment Financing Agreement (the “MEFA”) with Trinity Capital, Inc., as agent (the “Agent”) and lender, and the other lenders party (the “Lenders”) thereto, providing for a conditional commitment to provide financing in the total amount of up to $100.0 million. On June 27, 2025 and June 30, 2025, we, the Agent and the Lenders executed Equipment Financing Schedule No. 1 (“Schedule No. 1”) and No.2 (“Schedule No. 2,” and together with Schedule No. 1 and the MEFA, the “Agreements”) to the MEFA in the amount of $21.5 million (the “Draw 1 Total Cost”) and $3.5 million (the “Draw 2 Total Cost”), respectively. The remaining amount of up to $75.0 million may be funded in one or more draws on or before June 30, 2027 (the “Termination Date”), subject to the satisfaction of various conditions.
Showing the first 40 of 48 passages. Open the source sections for the rest.
Removed paragraphs (36)
Previous report
Spectrum Usage Rights Transaction
Previous report
On January 5, 2025, AST LLC entered into a Strategic Collaboration Term Sheet (defined below) with Ligado LLC under which we will receive long-term access to up to 45 MHz of lower mid-band spectrum in the United States and Canada for direct-to-device satellite applications. On March 22, 2025, we and certain of our subsidiaries entered into certain Definitive Agreements (defined below) with Ligado for usage rights for mid-band spectrum and issued 4,714,226 Penny Warrants (defined below) exercisable for shares of our Class A Common Stock, subject to a 12-month lock-up. Refer to discussion under “Spectrum Usage Rights Transactions” below for further details.
Previous report
DIU Agreement
Previous report
Revenues
Previous report
Engineering Services Costs
Previous report
General and Administrative Costs
Previous report
Research and Development Costs
Previous report
Depreciation and Amortization
Previous report
(Loss) Gain on Remeasurement of Warrant Liabilities
Previous report
Interest Expense
Previous report
Interest Income
Previous report
Other (Expense) Income, Net
Previous report
Income Tax Expense
Previous report
Revenues
Previous report
Engineering Services Costs
Previous report
General and Administrative Costs
Previous report
Total general and administrative costs increased by $6.1 million, or 50%, to $18.4 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase was attributable to a $4.8 million increase in consultants and professional services, a $1.1 million increase in payroll and employee related costs driven by an increase in head count, and a $0.2 million increase in other expenses.
Previous report
Research and Development Costs
Previous report
Depreciation and Amortization
Previous report
(Loss) Gain on Remeasurement of Warrant Liabilities
Previous report
Interest Expense
Previous report
Interest Income
Previous report
Other (Expense) Income, Net
Previous report
Income Tax Expense
Previous report
Spectrum Usage Rights Transactions
Previous report
On March 22, 2025, pursuant to the Strategic Collaboration Term Sheet, (1) we, AST LLC, Spectrum USA I, LLC, a subsidiary of AST LLC (“SpectrumCo”), and Ligado LLC entered into a Framework Agreement (the “Framework Agreement”), (2) SpectrumCo and Ligado LLC entered into a Strategic Collaboration and Spectrum Usage Agreement (the “Collaboration Agreement”), (3) AST LLC and One Dot Six LLC entered into a Spectrum Usage Rights Agreement (the “Usage Rights Agreement”), (4) we, Cerberus Capital Management, L.P. (“Cerberus”), and Fortress Credit Advisors LLC (“Fortress”) entered into a Side Letter Agreement (“Governance Side Letter”) and (5) we issued 4,714,226 penny warrants (“Penny Warrants”) exercisable for shares of our Class A Common Stock at an exercise price per share equal to $0.01 per share, subject to a 12-month lock-up (the “Warrant”, and together with the Framework Agreement, Collaboration
Previous report
Agreement, Usage Rights Agreement and Governance Side Letter, collectively, the “Definitive Agreements”).
Previous report
Pursuant to the Collaboration Agreement and subject to bankruptcy court approval of the Spectrum Usage Rights Transactions, among other things, Ligado LLC will provide to SpectrumCo the right to use its satellites, ground station assets and L-band spectrum, including substantially all of the capacity on SkyTerra-1 and, in exchange, SpectrumCo will pay to Ligado LLC (1) at least $80.0 million in annual payments in cash for use of the L-band spectrum; provided, that any portion of such amount in excess of the amount owed by Ligado to utilize the L-band spectrum may be paid in our equity rather than cash for three years after closing; provided, further, that such usage-right consideration amount covers 100% of amounts due from Ligado to utilize the L-band spectrum and (2) certain revenue share payments derived from the usage of the L-band spectrum and from North American operations, in each case until the earlier of (x) December 31, 2035 (which can be renewed to December 31, 2107 at SpectrumCo’s election) or (y) the termination of the Collaboration Agreement.
Previous report
Pursuant to the Framework Agreement, among other things, in consideration of the rights granted to the SpectrumCo under the Collaboration Agreement, we will pay to Ligado LLC: (1) $350.0 million in cash and (2) at our option, $200.0 million either in cash, convertible notes on market terms or a combination of the foregoing, in each case payable at the time specified in the Framework Agreement and on the terms and subject to the conditions set forth therein. The Framework Agreement also includes a break-up fee payable to us in the event that the Framework Agreement is terminated by us if the resolution of certain Ligado litigation materially adversely impacts the use of L-band spectrum by SpectrumCo.
Previous report
In addition, pursuant to the Spectrum Usage Agreement and subject to bankruptcy court approval of the Spectrum Usage Rights Transactions, (1) AST LLC will have access to spectrum under the Master Agreement (1670-1675 MHz Spectrum), dated as of July 16, 2007, by and among Crown Castle MM Holding LLC, OP LLC and TVCC One Six Holdings LLC (succeeded by One Dot Six LLC), as amended on December 2, 2022 and the Amended and Restated Long-Term De Facto Transfer Lease Agreement, dated as of December 2, 2022, by and between OP, LLC and One Dot Six LLC (collectively, the “CCI Agreement”) for space to ground use on a preemptable basis, and, in exchange, (2) AST LLC will pay an annual usage fee amount due in cash plus a 30% premium with respect to each such payment payable in our Class A Common Stock. For seven years after the execution of the Usage Rights Agreement, AST LLC will have the right to exercise an option to purchase spectrum under the CCI Agreement, so long as AST LLC pays Ligado the purchase price with respect to such option plus a premium of 30% with respect to such purchase price payable in our Class A Common Stock.
Previous report
Proceeds from the sale of the Class A Common Stock under the 2024 Sales Agreement were used for general corporate purposes. As of the date of this Quarterly Report, we have less than $0.1 million available under the 2024 ATM Equity Program.
Previous report
Term Loan
Previous report
Capital Equipment Loan
Previous report
We drew the entire $15.0 million facility on September 19, 2023 and incurred $0.1 million of transaction costs. The net proceeds were used for general corporate purposes.
Previous report
2032 Convertible Notes
Previous report
We did not have any off-balance sheet arrangements as of March 31, 2025.
Reworded paragraphs (52)
Previous wording
the negotiation of definitive agreements with MNOs and governmental entities relating to the SpaceMobile Service that would supersede preliminary agreements and memoranda of understanding;
Current wording
the negotiation of definitive agreements with Mobile Netwrok Operators (“MNOs”) and governmental entities relating to the SpaceMobile Service that would supersede preliminary agreements and memoranda of understanding;
Previous wording
our ability to consummate the proposed strategic transaction with Ligado, including our ability to realize the anticipated benefits of our proposed transaction with Ligado and to raise the contemplated financing to fund such transaction; and
Current wording
our ability to consummate the proposed strategic transaction with Ligado, including our ability to realize the anticipated benefits of our proposed transaction with Ligado and to satisfy the conditions to funding under the Sound Point Credit Facility; and
Previous wording
Such forward-looking statements relate to future events or future performance, but reflect management’s current beliefs, based on information currently available. A number of factors could cause actual events, performance or results to differ materially from the events, performance and results discussed in the forward-looking statements. For information identifying important factors that could cause actual results to differ materially from those anticipated in the forward-looking statements, please refer to Part I, Item 1A. Risk Factors included in our Annual Report on Form 10-K for the year ended December 31, 2024 and in Part II, Item 1A. Risk Factors included in this Quarterly Report. The Company’s securities filings can be accessed on the EDGAR section of the SEC’s website at www.sec.gov. Except as expressly required by applicable securities law, the Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.
Current wording
Such forward-looking statements relate to future events or future performance, but reflect management’s current beliefs, based on information currently available. A number of factors could cause actual events, performance or results to differ materially from the events, performance and results discussed in the forward-looking statements. For information identifying important factors that could cause actual results to differ materially from those anticipated in the forward-looking statements, please refer to Part I, Item 1A. Risk Factors included in our Annual Report on Form 10-K for the year ended December 31, 2024 and in Part II, Item 1A. Risk Factors included in our Quarterly Report on Form 10-Q for the quarter ended March 31, 2025. The Company’s filings with the SEC can be accessed on the EDGAR section of the SEC’s website at www.sec.gov. Except as expressly required by applicable securities law, the Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.
Previous wording
We are building the first and only global Cellular Broadband network in space to be accessible directly by everyday smartphones (2G/4G-LTE/5G devices) for commercial use, and other applications for government use utilizing our extensive IP and patent portfolio. The SpaceMobile Service is being designed to provide cost-effective, high-speed Cellular Broadband services to end-users who are out of terrestrial cellular coverage using existing mobile devices. The SpaceMobile Service currently is planned to be provided by a constellation of high-powered, large phased-array satellites in low Earth orbit (“LEO”) using low-band and mid-band spectrum controlled by Mobile Network Operators (“MNOs”). On March 22, 2025, we and certain of our subsidiaries entered into certain definitive agreements with Ligado Networks LLC (“Ligado LLC”) and its subsidiaries (together with Ligado LLC, “Ligado”) for usage rights for mid-band spectrum. Following the approval of the United States Bankruptcy Court for the District of Delaware and subject to the completion of certain conditions, we expect our network will be enhanced by our long-term access to up to 45 MHz of the lower mid-band satellite spectrum in the United States and Canada through our usage agreements. As of March 31, 2025, our IP portfolio consists of more than 3,650 patent and patent pending claims worldwide, of which approximately 1,650 have been officially granted or allowed. This includes 36 patent families worldwide. Our patents have various terms expiring starting 2039. We are headquartered in Texas where we operate 194,000 square feet satellite AIT facilities.
Current wording
We are building the first and only global Cellular Broadband network in space to be accessible directly by everyday smartphones (2G/4G-LTE/5G devices) for commercial use, and other applications for government use utilizing our extensive intellectual property (“IP”) and patent portfolio. The SpaceMobile Service is being designed to provide cost-effective, high-speed Cellular Broadband services to end-users who are out of terrestrial cellular coverage using existing mobile devices. The SpaceMobile Service currently is planned to be provided by a constellation of high-powered, large phased-array satellites in low Earth orbit (“LEO”) using low-band and mid-band spectrum controlled by MNOs.
Previous wording
We intend to work with MNOs to offer the SpaceMobile Service to the MNOs’ end-user customers. Our vision is that users will not need to subscribe to the SpaceMobile Service directly through us, nor will they need to purchase any new or additional equipment. Instead, users will be able to access the SpaceMobile Service when prompted on their mobile device that they are no longer within range of the land-based facilities of the MNOs or will be able to purchase a plan directly with their existing mobile provider. We intend to seek to use a revenue-sharing business model for the SpaceMobile Service in our agreements with MNOs.
Current wording
We intend to work with MNOs to offer the SpaceMobile Service to the MNOs’ end-user customers. We currently have partnerships with over 50 MNOs with nearly 3 billion subscribers globally. Our vision is that users will not need to subscribe to the SpaceMobile Service directly through us, nor will they need to purchase any new or additional equipment. Instead, users will be able to access the SpaceMobile Service when prompted on their mobile device that they are no longer within range of the land-based facilities of the MNOs or will be able to purchase a plan directly with their existing mobile provider. We intend to seek to use a revenue-sharing business model for the SpaceMobile Service in our agreements with MNOs.
Previous wording
The SpaceMobile Service is expected to be highly attractive to MNOs as it will enable them to improve and differentiate their service offering without significant incremental capital investments. The SpaceMobile Service is expected to enable MNOs to augment and extend their coverage without building towers or other land-based infrastructure, including where it is not cost-justified or is difficult due to geographical challenges. As a result of the incremental coverage created by the planned SpaceMobile Service, we believe that MNOs will have the opportunity to increase subscribers’ average revenue per user (“ARPU”).
Current wording
The SpaceMobile Service is expected to be highly attractive to MNOs as it will enable them to improve and differentiate their service offering without significant incremental capital investments. The SpaceMobile Service is expected to enable MNOs to augment and extend their coverage without building towers or other land-based infrastructure, including where it is not cost-justified or is difficult due to geographical challenges. As a result of the incremental coverage created by the planned SpaceMobile Service, we believe that MNOs will have the opportunity to increase subscribers’ average revenue per user.
Previous wording
We also intend to leverage our patented technology, including large phased array and high power capability of our BB satellites, for a variety of applications in the government sector. To this end, we have entered into agreements with prime contractors for the United States (“U.S.”) government to perform certain tasks, including a new contract award entered in February 2025 with the United States Space Development Agency (“SDA”) through a prime contractor with total expected revenue of $43.0 million to provide certain testing services utilizing the five Block 1 BB satellites (defined below) and one next generation Block 2 BB satellite and a new contract award entered in April 2025 with the Defense Innovation Unit (“DIU”) through a prime contractor with total expected revenue of up to approximately $20.0 million for SpaceMobile capabilities with multiple U.S. government agencies in support of government communications over land, sea, and air. We intend to seek to enter into other similar agreements with the U.S. government, either directly or through prime contractors, to develop and test certain non-communication applications and, once qualified, provide certain non-communication and communication services through our satellites.
Current wording
We also intend to leverage our patented technology, including large phased array and high power capability of our BlueBird (“BB”) satellites, for a variety of applications in the government sector. To this end, we have entered into agreements with prime contractors for the United States (“U.S.”) government to perform certain tasks, including a new contract award entered in February 2025 with the United States Space Development Agency (“SDA”) through a prime contractor with total expected revenue of $43.0 million to provide certain testing services utilizing the five Block 1 BB satellites (defined below) and one next generation Block 2 BB satellite and a new contract award entered in April 2025 with the Defense Innovation Unit (“DIU”) through a prime contractor with total expected revenue of up to approximately $20.0 million for SpaceMobile capabilities with multiple U.S. government agencies in support of government communications over land, sea, and air. We intend to seek to enter into other similar agreements with the U.S. government, either directly or through prime contractors, to develop and test certain non-communication applications and, once qualified, provide certain non-communication and communication services through our satellites.
Previous wording
On April 1, 2019, we launched our first test satellite, BlueWalker 1 (“BW1”), which was used to validate our satellite to cellular architecture and was capable of managing communications delays from LEO and the effects of doppler in a satellite to ground cellular environment using the 4G-LTE protocol.
Current wording
On April 1, 2019, we launched our first test satellite, BlueWalker 1, which was used to validate our satellite to cellular architecture and was capable of managing communications delays from LEO and the effects of doppler in a satellite to ground cellular environment using the 4G-LTE protocol.
Previous wording
We launched our Blue Walker 3 (“BW3”) test satellite on September 10, 2022, and announced the completion of the deployment of the communication phased array antenna of the BW3 test satellite in orbit on November 14, 2022. Using the BW3 test satellite, we successfully completed two-way 5G voice calls directly to standard unmodified smartphones, achieved repeated successful download speeds of above 21 Mbps to standard unmodified smartphones and spectral efficiency of approximately 3 bits per second per hertz. We have also successfully completed initial in-orbit and ground testing for non-communication government applications. We intend to continue testing capabilities of the BW3 test satellite, including further testing with cellular service providers and the U.S. government.
Current wording
We launched our Blue Walker 3 (“BW3”) test satellite on September 10, 2022, and announced the completion of the deployment of the communication phased array antenna of the BW3 test satellite in orbit on November 14, 2022. Using the BW3 test satellite, we successfully completed two-way 5G voice calls directly to standard unmodified smartphones, achieved repeated successful download speeds of above 21 megabits per second (“Mbps”) to standard unmodified smartphones and spectral efficiency of approximately 3 bits per second per hertz. We have also successfully completed initial in-orbit and ground testing for non-communication government applications. We intend to continue testing capabilities of the BW3 test satellite, including further testing with cellular service providers and the U.S. government.
Previous wording
We launched five first generation commercial BB satellites (“Block 1 BB satellites”) on September 12, 2024. The Block 1 BB satellites are of similar size and weight to the BW3 test satellite and have ten times higher throughput than the BW3 test satellite. In October 2024, we completed the deployment of the communication phased array antennas and Q/V antennas in orbit and performed a series of monitoring tests and activities to confirm the successful initial operations of the Block 1 BB satellites. In January 2025, we successfully made the first SpaceMobile video call from space with Vodafone using standard unmodified smartphones. In February 2025, we completed the voice and video call tests on standard unmodified smartphones with AT&T and Verizon in the U.S. and also completed the tests for non-communication applications for the U.S. government. All five Block 1 BB satellites have participated in the tests at various stages. In April 2025, together with Rakuten Mobile, Inc., we successfully conducted a two-way broadband video call in front of a live audience using unmodified smartphones on the SpaceMobile network enabled by a Block 1 BB satellite in orbit today. We expect to continue testing for SpaceMobile Service automation including beta testing prior to rollout of initial noncontinuous SpaceMobile Service in select markets including the United States, Europe and Japan.
Current wording
We launched five first generation commercial BB satellites (“Block 1 BB satellites”) on September 12, 2024. The Block 1 BB satellites are of similar size and weight to the BW3 test satellite and have ten times higher throughput than the BW3 test satellite. In October 2024, we completed the deployment of the communication phased array antennas and Q/V antennas in orbit and performed a series of monitoring tests and activities to confirm the successful initial operations of the Block 1 BB satellites. In January 2025, we successfully made the first SpaceMobile video call from space with Vodafone using standard unmodified smartphones. In February 2025, we completed the voice and video call tests on standard unmodified smartphones with AT&T and Verizon in the United States and also completed the tests for non-communication applications for the U.S. government. All five Block 1 BB satellites have participated in the tests at various stages. In April 2025, together with Rakuten Mobile, Inc., we successfully conducted a two-way broadband video call in front of a live audience using unmodified smartphones on the SpaceMobile network enabled by a Block 1 BB satellite in orbit today. On July 21, 2025, we and AT&T made the first-ever Voice over LTE call and short message service over satellite using AT&T’s spectrum and core network with a standard unmodified cell phone. We expect to continue testing for SpaceMobile Service automation including beta testing prior to rollout of initial noncontinuous SpaceMobile Service in select markets including the United States, Europe and Japan.
Previous wording
We received an initial license from the Federal Communications Commission (“FCC”) to launch and operate the Block 1 BB satellites using S- and UHF-band frequencies to support orbit raising maneuvers and Telemetry, Tracking, and Command operations, and to employ the V-band for routine gateway feeder link operations. In the United States, we obtained special temporary authorities (“STAs”) for service link operations from the FCC, under which we have begun testing in the United States employing low-band spectrum from AT&T and Verizon and received FCC authorization to test our space-based cellular broadband network on Band 14 - the dedicated spectrum for first responders and the public safety community on FirstNet, built with AT&T. We have also obtained the STAs in Turkey and the United Kingdom with Vodafone and in Japan with Rakuten. Further, we have submitted Part 5 applications to the FCC for launch of our first next-generation Block 2 BB satellite. Before we begin providing full commercial SpaceMobile Service, we will need to obtain additional approvals from the FCC including our application to request authority to add additional satellites and frequencies for use with the SpaceMobile Service in the United States, including the incorporation of Verizon frequencies, and we will need to obtain additional approvals from other regulatory authorities outside the United States.
Current wording
We received an initial license from the Federal Communications Commission (“FCC”) to launch and operate the Block 1 BB satellites using S- and UHF-band frequencies to support orbit raising maneuvers and Telemetry, Tracking, and Command operations, and to employ the V-band for routine gateway feeder link operations. In the United States, we obtained special temporary authorities (“STAs”) for service link operations from the FCC, under which we have begun testing in the United States employing low-band spectrum from AT&T and Verizon and received FCC authorization to test our space-based Cellular Broadband network on Band 14—the dedicated spectrum for first responders and the public safety community on FirstNet, built with AT&T. We have also obtained STAs in Turkey and the United Kingdom with Vodafone, in Canada with Bell Canada, and in Japan with Rakuten Mobile Inc. In July 2025, we received an experimental authorization from the FCC to launch and operate our first Block 2 BB satellite (“FM 1”) using S- and UHF-band frequencies to support orbit raising maneuvers and Telemetry, Tracking, and Command operations. Further, we have filed our Part 25 modification application for authority to launch and operate our full 248 LEO satellite network and authority to operate in the 700/800 MHz bands for supplemental coverage from space (“SCS”). We also have filed an amendment to our Part 25 modification application to add SCS use of 700 MHz spectrum licensed to FirstNet. The FCC has accepted and placed on public notice the part of our application to enable us to begin launching our satellite network. We expect the FCC to accept and place on public notice the rest of our application in the near future. Before we begin providing full commercial SpaceMobile Service, we will need a grant of our pending Part 25 license and we will need to obtain additional approvals from other regulatory authorities outside the United States. AST SpaceMobile has also filed with the FCC requests for new gateway STAs for several locations to communicate in the Q/V band with our full 248-satellite constellation, including FM 1 and the Block 2 BB satellites.
Previous wording
Our next generation of commercial BB satellites, “Block 2 BB satellites,” featuring up to approximately 2,400 square feet communication array, the largest communication array to be ever deployed in a LEO for commercial use and more than three times bigger than the communication array of the Block 1 BB satellites in orbit today, are designed to deliver up to 10 times the bandwidth capacity of the Block 1 BB satellites. We believe the larger aperture array is expected to provide greater spectrum reuse, enhanced signal strength and increased capacity, thereby reducing the necessary number of satellites to achieve service coverage as compared to smaller apertures. In addition, when we introduce our own AST5000 ASIC chip in the Block 2 BB satellites, we expect to achieve materially greater throughput capacity of up to 40 MHz per beam to support 120 Mbps peak data rates and up to 10,000 MHz of processing bandwidth per Block 2 BB satellite, require less power and offer a lower overall unit cost. We have reached key production milestones and are in the final production preparation phase of the first batch of the ASIC chip. Until we introduce our ASIC chip in Block 2 BB satellites, we expect to continue to manufacture and launch Block 2 BB satellites that are based on a Field Programmable Gate Arrays (“FPGA”) chip.
Current wording
Our next generation of commercial BB satellites, Block 2 BB satellites, featuring up to approximately 2,400 square feet communication array, the largest communication array to be ever deployed in a LEO for commercial use and more than three times bigger than the communication array of the Block 1 BB satellites in orbit today, are designed to deliver up to 10 times the bandwidth capacity of the Block 1 BB satellites. We believe the larger aperture array is expected to provide greater spectrum reuse, enhanced signal strength and increased capacity, thereby reducing the necessary number of satellites to achieve service coverage as compared to smaller apertures. In addition, when we introduce our own AST5000 Application Specific Integrated Circuit (“ASIC”) chip in the Block 2 BB satellites, we expect to achieve materially greater throughput capacity of up to 40 MHz per beam to support 120 Mbps peak data rates and up to 10,000 MHz of processing bandwidth per Block 2 BB satellite, require less power and offer a lower overall unit cost. We have reached key production milestones and are in the assembly stage of the first batch of the ASIC chip. We have also completed development of the electronic board with our new ASIC chip. Until we introduce our ASIC chip in Block 2 BB satellites, we expect to continue to manufacture and launch Block 2 BB satellites that are based on a Field Programmable Gate Arrays chip.
Previous wording
We have entered into launch agreements with multiple launch service providers which will allow us to accelerate a planned launch campaign during 2025 and 2026 to launch over 60 Block 2 BB satellites. We have commenced assembling and testing the Block 2 BB satellites in accordance with our plan to meet this launch campaign to enable Continuous SpaceMobile Service, which means with respect to a particular geographical market close to 100% reliable persistent service across the geographical areas within certain latitudes and a substantially high degree of reliable persistent service across the remaining geographical areas outside the said latitudes, coverage across key markets such as the United States, Europe, Japan and other strategic markets as well as to facilitate U.S. government applications. We expect to ship the first next-generation Block 2 BB satellite (“FM 1”) to the launch provider during the second quarter of 2025 for a launch scheduled in July 2025, which will commence our launch campaign of over 60 Block 2 BB satellites in 2025 through 2026 at a cadence of one launch approximately every one to two months on average. The timing of shipment and launch of the Block 2 BB satellites are contingent on a number of factors including satisfactory and timely completion of the assembly and testing of the Block 2 BB satellites, regulatory approvals for the shipment and launch, availability of capital, readiness of the launch vehicle, logistics and other factors, many of which are beyond our control.
Current wording
We have entered into launch agreements with multiple launch service providers which will allow us to accelerate a planned launch campaign during 2025 and 2026 to launch over 60 Block 2 BB satellites. We have commenced assembling and testing the Block 2 BB satellites in accordance with our plan to meet this launch campaign to enable Continuous SpaceMobile Service, which means with respect to a particular geographical market close to 100% reliable persistent service across the geographical areas within certain latitudes and a substantially high degree of reliable persistent service across the remaining geographical areas outside the said latitudes, coverage across key markets such as the United States, Europe, Japan and other strategic markets as well as to facilitate U.S. government applications. We expect to be ready to ship FM 1, our seventh satellite to be launched into orbit, in August 2025. We are engaged with the launch provider to mutually determine the launch date of FM 1. Our launch campaign of over 60 Block 2 BB satellites in 2025 through 2026 is planned at a cadence of one launch approximately every one to two months on average. The timing of shipment and launch of the Block 2 BB satellites are contingent on a number of factors including satisfactory and timely completion of the assembly and testing of the Block 2 BB satellites, regulatory approvals for the shipment and launch, availability of capital, readiness of the launch vehicle, logistics and other factors, many of which are beyond our control.
Previous wording
We are developing a phased satellite deployment plan and corresponding commercial launch plan of the SpaceMobile Service based on targeted geographical markets to provide the SpaceMobile Service to the most commercially attractive MNO markets. This prioritization of coverage is designed to minimize the capital required to initiate and operate commercial service that generates cash flows from operating activities sooner. We expect that such a successful commercial service would enable us to attract additional capital to continue to assemble and launch additional BB satellites to expand our capacity and geographic coverage area, although there can be no assurance that such capital would be available on terms acceptable to us, or at all.
Current wording
We are developing a phased satellite deployment plan and a corresponding commercial launch plan of the SpaceMobile Service based on targeted geographical markets to provide the SpaceMobile Service to the most commercially attractive MNO markets. This prioritization of coverage is designed to minimize the capital required to initiate and operate commercial service that generates cash flows from operating activities sooner. We expect that such a successful commercial service would enable us to attract additional capital to continue to assemble and launch additional BB satellites to expand our capacity and geographic coverage area, although there can be no assurance that such capital would be available on terms acceptable to us, or at all.
Previous wording
We are leveraging the technological expertise and manufacturing know-how derived from the assembly and testing of our Block 1 BB satellites in the development and assembly of our Block 2 BB satellites. We are actively engaged in planning and procurement of materials needed for assembly and readiness of the Block 2 BB satellites to meet our planned launches in 2025 and 2026. We have placed orders for procurement of substantially all materials and components needed, in accordance with our production plan, for the assembly, integration and testing of the next 20 Block 2 BB satellites. In addition, subject to our ability to raise additional capital, we plan to continue to accelerate the procurement of components and materials needed for us to complete fully assembled microns and phased array for 53 Block 2 BB satellites and complete 40 fully integrated and assembled Block 2 BB satellites. Our manufacturing, assembly, and testing strategy for Block 2 BB satellites includes continuous production and assembly of various components and sub systems for economies of scale, cost efficiencies, and unlocking capacity constraints, to build sufficient quantity of components and sub systems readily available on hand to be able to complete the final integration and testing of the required number of Block 2 BB satellites closer to the planned launch timelines. As of the date of this Quarterly Report, we have completed production of various components and sub systems and have completed assembly of microns for multiple Block 2 BB satellites. We will continue with manufacturing, assembly, integration and testing of the Block 2 BB satellites at our current capacity and once we complete our planned investments to increase the capacity to assemble, integrate, and test up to six Block 2 BB satellites per month in 2025, we plan to accelerate the manufacturing, assembly, integration and testing of the Block 2 BB satellites to meet our planned launches in 2025 and 2026.
Current wording
Our manufacturing, assembly, and testing strategy for Block 2 BB satellites includes continuous production and assembly of various components and sub systems for economies of scale, cost efficiencies, and unlocking capacity constraints, to build sufficient quantity of components and sub systems readily available on hand to be able to complete the final integration and testing of the required number of Block 2 BB satellites closer to the planned launch timelines. As of the date of this Quarterly Report, we have completed the microns for eight Block 2 BB satellites and completed acceptance and testing of substantially all components and sub systems for the integration and assembly of multiple Block 2 BB satellites. We will continue with manufacturing, assembly, integration and testing of the Block 2 BB satellites at our current capacity and once we complete our planned investments to increase the capacity to assemble, integrate, and test up to six Block 2 BB satellites per month in 2025, we plan to accelerate the manufacturing, assembly, integration and testing of the Block 2 BB satellites to meet our planned launches in 2025 and 2026.
Previous wording
We plan to achieve noncontinuous SpaceMobile Service in the selected, targeted geographical markets with the launch and operation of a total of 25 BB satellites (five Block 1 BB satellites and 20 Block 2 BB satellites). We believe the operation of a constellation of 25 BB satellites will enable us to potentially generate cash flows from operating activities to further support the buildup of the remaining constellation. We believe we can enable Continuous SpaceMobile Service coverage across key markets such as the United States, Europe, Japan and other strategic markets with the launch and operation of a total of approximately 45 to 60 BB satellites, and achieve Continuous SpaceMobile Service in all targeted geographical markets to meet our long term business goals with the launch and operation of a total of approximately 90 BB satellites. We anticipate launching and deploying additional satellites beyond the initial 90 satellites in order to enhance coverage and system capacity in response to incremental market demand. Continuous coverage is not expected to be available at all times in certain areas due to numerous factors, including number of active satellites in the region, latitude coverage range, and other factors. Our current plan is subject to numerous uncertainties, many of which are beyond our control, including satisfactory and timely completion of assembly and testing of the satellites, regulatory approvals, readiness of launch vehicles, availability of launch windows by the launch providers, logistics, our ability to raise additional capital for manufacturing of satellites and launch payments, proposed orbits and resulting satellite coverage, launch costs, ability to enter into agreements with MNOs and other factors, many of which are beyond our control. We may adopt a strategy for commercial launch of the SpaceMobile Service, including the nature and type of services offered and the geographic markets where we may launch such services, that may differ materially from our current plan.
Current wording
We plan to achieve noncontinuous SpaceMobile Service in the selected, targeted geographical markets with the launch and operation of a total of 25 BB satellites (five Block 1 BB satellites and 20 Block 2 BB satellites). We believe the operation of a constellation of 25 BB satellites will enable us to potentially generate cash flows from operating activities to further support the buildup of the remaining constellation. We believe we can enable Continuous SpaceMobile Service coverage across key markets such as the United States, Europe, Japan and other strategic markets with the launch and operation of a total of approximately 45 to 60 BB satellites, and achieve Continuous SpaceMobile Service in all targeted geographical markets to meet our long term business goals with the launch and operation of a total of approximately 90 BB satellites. We anticipate launching and deploying additional satellites beyond the initial 90 satellites in order to enhance coverage and system capacity in response to incremental market demand. Continuous coverage is not expected to be available at all times in certain areas due to numerous factors, including number of active satellites in the region, latitude coverage range, and other factors. Our current plan is subject to numerous uncertainties, many of which are beyond our control, including satisfactory and timely completion of assembly and testing of the satellites, regulatory approvals, readiness of launch vehicles, availability of launch windows by the launch providers, logistics, our ability to raise additional capital for manufacturing of satellites and launch payments, proposed orbits and resulting satellite coverage, launch costs, ability to enter into agreements with MNOs and other factors. We may adopt a strategy for commercial launch of the SpaceMobile Service, including the nature and type of services offered and the geographic markets where we may launch such services, that may differ materially from our current plan.
Previous wording
We are an early stage company and, as such, we are subject to all of the risks associated with early stage companies. Please refer to Risk Factors contained in Part I, “Item 1A. Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2024 and in Part II, “Item 1A. Risk Factors” included in this Quarterly Report.
Current wording
We are an early stage company and, as such, we are subject to all of the risks associated with early stage companies. Please refer to Risk Factors contained in Part I, “Item 1A. Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2024 and in Part II, “Item 1A. Risk Factors” included in our Quarterly Report on Form 10-Q for the quarter ended March 31, 2025.
Previous wording
Changes in the prices of satellite materials due to inflation, supply chain challenges, tariffs, and other macroeconomic factors may affect our capital costs estimates to build and launch the satellite constellation and adversely affect our financial condition. The extent of impact of these factors on our business will depend on future developments that are highly uncertain and cannot be predicted with confidence at this time. To date, these factors have not had a material impact to our technology development efforts or results of our operations. However, if macroeconomic conditions deteriorate or there are unforeseen developments, our results of operations and financial condition may be adversely affected.
Current wording
Changes in the prices of satellite materials due to inflation, supply chain challenges, tariffs, and other macroeconomic factors may affect our capital cost estimates to build and launch the satellite constellation and adversely affect our financial condition. The extent of impact of these factors on our business will depend on future developments that are highly uncertain and cannot be predicted with confidence at this time. To date, these factors have not had a material impact to our technology development efforts or results of our operations. However, if macroeconomic conditions deteriorate or there are unforeseen developments, our results of operations and financial condition may be adversely affected.
Previous wording
We operate from multiple locations that include our corporate headquarters and 194,000 square feet AIT facilities in Texas where the final AIT is performed, engineering and development centers in the United States, India and Scotland, and engineering, development and production centers in Spain and Israel. Our operations in Israel constitute approximately 1% of our consolidated total assets and approximately 11% of our consolidated total operating expenses. To date, our operations in Israel have not been materially impacted by the geopolitical conflict in the Middle East. We currently do not expect potential interruptions to our operations in Israel to have a material impact on the Company.
Current wording
We operate from multiple locations that include our corporate headquarters and over 200,000 square feet of AIT facilities in Texas where the final AIT is performed, engineering and development centers in the United States, India and Scotland, and engineering, development and production centers in Spain and Israel. Our operations in Israel constitute approximately 1% of our consolidated total assets and approximately 10% of our consolidated total operating expenses. To date, our operations in Israel have not been materially impacted by the geopolitical conflict in the Middle East. We currently do not expect potential interruptions to our operations in Israel to have a material impact on the Company.
Previous wording
Our historical financial performance has been, and we expect our financial performance in the future to be, driven by our ability to execute on our strategy. We believe that our future results of operations could differ materially from the historical results of operations as we initiate the limited, noncontinuous SpaceMobile Service in certain targeted geographical markets, secure additional contracts with the U.S. government or its prime contractors for non-commercial use of our BB satellites, complete the development of the Block 2 BB satellites, increase our capacity and scale to manufacture BB satellites for the planned launches, launch the Block 2 BB satellites, enter into commercial arrangements with additional MNOs, and close our proposed transaction with Ligado.
Current wording
Our historical financial performance has been, and we expect our financial performance in the future to be, driven by our ability to execute on our strategy. We believe that our future results of operations could differ materially from the historical results of operations as we initiate the limited, noncontinuous SpaceMobile Service in certain targeted geographical markets, secure additional contracts with the U.S. government or its prime contractors for non-commercial use of our BB satellites, complete the development of the Block 2 BB satellites, increase our capacity and scale to manufacture BB satellites for the planned launches, launch the Block 2 BB satellites, enter into commercial arrangements with additional MNOs, and close our proposed transaction with Ligado and related financing.
Previous wording
To date, we have not generated any revenues from our SpaceMobile Service and do not expect to generate revenue until we launch the limited, noncontinuous SpaceMobile Service. During the three months ended March 31, 2025, we recognized $0.7 million of revenue from performance obligations completed under agreements with prime contractors for U.S. government contracts and from resale of gateway equipment to a mobile network operator. We expect to continue to recognize revenue under these agreements with prime contractors for U.S. government contracts as and when we complete the remaining performance obligations. We currently plan to initiate a limited, noncontinuous SpaceMobile Service in targeted geographical markets in 2025, including in the United States, subject to obtaining additional regulatory approvals and executing definitive agreements with additional MNOs, and seek to generate revenue from such service.
Current wording
To date, we have not generated any revenues from our SpaceMobile Service and do not expect to generate revenue until we launch the limited, noncontinuous SpaceMobile Service. During the three and six months ended June 30, 2025, we recognized $1.2 million and $1.9 million of revenue, respectively, from performance obligations completed under agreements with prime contractors for U.S. government contracts and from resale of gateway equipment to MNOs. We expect to continue to recognize revenue under these agreements with prime contractors for U.S. government contracts and under gateway equipment resale agreements with MNOs as and when we complete the remaining performance obligations. We currently plan to initiate a limited, noncontinuous SpaceMobile Service in the United States.
Previous wording
R&D costs are charged to expense as incurred. R&D costs consist principally of development activities in which we typically engage third-party vendors and are largely driven by the achievement of milestones that trigger payments and costs of materials and supplies consumed in the R&D activities. R&D costs are expected to fluctuate quarter over quarter depending on achievement of milestones.
Current wording
Research and development (“R&D”) costs are charged to expense as incurred. R&D costs consist principally of development activities in which we typically engage third-party vendors and are largely driven by the achievement of milestones that trigger payments and costs of materials and supplies consumed in the R&D activities. R&D costs are expected to fluctuate quarter over quarter depending on achievement of milestones.
Previous wording
AST LLC is treated as a partnership for U.S. federal and state income tax purposes. Accordingly, all income, losses, and other tax attributes pass through to the members’ income tax returns, and no U.S. federal and state and local provision for income taxes has been recorded for AST LLC in the unaudited condensed consolidated financial statements. Certain foreign wholly-owned entities are taxed as corporations in the jurisdictions in which they operate, and accruals for such taxes are included in the unaudited condensed consolidated financial statements.
Current wording
AST LLC is treated as a partnership for U.S. federal and state income tax purposes. Accordingly, all income, losses, and other tax attributes pass through to the members’ income tax returns, and no U.S. federal and state and local provision for income taxes has been recorded for AST LLC in the unaudited condensed consolidated financial statements. Certain foreign entities are taxed as corporations in the jurisdictions in which they operate, and accruals for such taxes are included in the unaudited condensed consolidated financial statements.
Previous wording
Noncontrolling interest primarily represents the equity interest in AST LLC held by members other than us. We attribute a portion of net income or loss generated at AST LLC to the noncontrolling interest based on their ownership interests. As of March 31, 2025 and December 31, 2024, the noncontrolling interest in AST LLC was approximately 27.4% and 30.1%, respectively. The decrease in noncontrolling interest percentage during the three months ended March 31, 2025 was a result of the issuance of Class A Common Stock due to the conversion of the 2034 Convertible Notes, the issuance of Class A Common Stock under the 2024 Sales Agreement (as defined below), the redemption of AST LLC Common Units in exchange for Class A Common Stock, the exercise of options for Class A Common Stock and the vesting of restricted stock units.
Current wording
Noncontrolling interest primarily represents the equity interest in AST LLC held by members other than us. We attribute a portion of net income or loss generated at AST LLC to the noncontrolling interest based on their ownership interests. As of June 30, 2025 and December 31, 2024, the noncontrolling interest in AST LLC was approximately 26.3% and 30.1%, respectively. The decrease in noncontrolling interest percentage during the six months ended June 30, 2025 was a result of the issuance of Class A Common Stock due to the conversion of the 2034 Convertible Notes, the issuance of Class A Common Stock under the 2024 Sales Agreement and the 2025 Sales Agreement, the redemption of AST LLC Common Units in exchange for Class A Common Stock, the exercise of options for Class A Common Stock and the vesting of restricted stock units.
Previous wording
Total engineering services costs increased by $7.7 million, or 39%, to $27.2 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase was attributable to a $4.5 million increase in payroll and employee related costs driven by an increase in head count, a $1.2 million increase in AIT facilities and activities and engineering development centers costs, a $1.1 million increase in consultants and professional fees, and a $0.9 million increase from license and other costs.
Current wording
Total engineering services costs increased by $7.4 million, or 35%, to $28.6 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The increase was attributable to a $4.9 million increase in payroll and employee related costs driven by an increase in headcount and higher stock-based compensation expenses, a $1.4 million increase in consultants and professional fees, a $1.0 million increase in AIT facilities and activities and engineering development centers costs resulting from expansion of global facilities footprint, and a $0.1 million increase in other expenses.
Previous wording
Total R&D costs increased by $2.9 million, or 68% to $7.1 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase in R&D costs was primarily attributable to the development and design of the Block 2 BB satellites beyond FM1.
Current wording
Total R&D costs increased by $1.9 million, or 43%, to $6.4 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The increase in R&D costs was primarily attributable to the development and design of the Block 2 BB satellites beyond FM 1 and our ASIC chip, partially offset by completion of the development of the Block 1 BB satellites.
Previous wording
Total depreciation and amortization expense decreased by $9.0 million, or 45%, to $11.0 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The decrease was due to a lower depreciation expense recognized for the Block 1 BB satellites which we launched in September 2024 than the depreciation expense recognized in the comparative period for the BW3 test satellite which was fully depreciated as of August 30, 2024.
Current wording
Total depreciation and amortization expense decreased by $8.7 million, or 43%, to $11.7 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The decrease was due to a lower depreciation expense recognized for the Block 1 BB satellites, which we launched in September 2024, as compared to the depreciation expense recognized in the comparative period for the BW3 test satellite which was fully depreciated as of August 30, 2024.
Previous wording
The fair value adjustment for Private Placement Warrants outstanding at March 31, 2025 resulted in a loss of $3.2 million for the three months ended March 31, 2025 as compared to a gain of $18.2 million for the three months ended March 31, 2024. The increase in loss was largely driven by changes in our share price.
Current wording
The fair value adjustment for Private Placement Warrants outstanding at June 30, 2025 resulted in a loss of $65.0 million for the three months ended June 30, 2025 as compared to a loss of $66.1 million for the three months ended June 30, 2024. The decrease in loss was largely driven by changes in our share price.
Previous wording
Interest expense increased by $0.2 million, or 5%, to $4.7 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The small increase in interest expense was largely due to an increase in interest expense recognized on the 2032 Convertible Notes we issued on January 27, 2025, partially offset by decreases in interest expense recognized on the 2034 Convertible Notes which we converted into shares of our Class A Common Stock on January 22, 2025 and on a senior secured credit facility which we terminated on November 13, 2024.
Current wording
Interest expense increased by $0.7 million, or 15%, to $5.7 million for the three months ended June 30, 2025 as compared to the three months ended June 30, 2024. The increase in interest expense was largely due to an increase in interest expense recognized on the 2032 4.25% Convertible Notes we issued on January 27, 2025, partially offset by decreases in interest expense recognized on the 2034 Convertible Notes, which we converted into shares of our Class A Common Stock on January 22, 2025, and on a senior secured credit facility which we terminated on November 13, 2024.
Previous wording
Other expense, net was $0.7 million for the three months ended March 31, 2025, as compared to less than $0.1 million for the three months ended March 31, 2024. The increase in other expense, net was primarily due to an increase in foreign exchange losses.
Current wording
Other income, net was $0.3 million for the three months ended June 30, 2025, as compared to other income, net of $0.3 million for three months ended June 30, 2024. The net change of less than $0.1 million was primarily due to a $2.2 million decrease in loss on disposal of fixed assets and a $0.7 million increase in foreign exchange gain, offset by a $2.6 million decrease in other non-operating income and a $0.3 million increase in other expense.
Previous wording
The provision for income taxes was $0.2 million and $0.3 million for the three months ended March 31, 2025 and 2024, respectively. The consolidated effective tax rate for the three months ended March 31, 2025 and March 31, 2024 was (0.26%) and (0.74)%, respectively. Refer to Note 11 Income Taxes in the accompanying notes to the unaudited condensed consolidated financial statements for further information.
Current wording
The provision for income taxes was $(0.7) million and $(0.2) million for the three months ended June 30, 2025 and 2024, respectively. The consolidated effective tax rate for the three months ended June 30, 2025 and 2024 was (0.54)% and (0.18%), respectively. Refer to Note 11 Income Taxes in the accompanying notes to the unaudited condensed consolidated financial statements for further information.
Previous wording
Net loss attributable to noncontrolling interest was $17.9 million for the three months ended March 31, 2025 as compared to $20.1 million in the three months ended March 31, 2024. This decrease in net loss attributable to noncontrolling interest was due to a decrease in noncontrolling interest’s ownership percentage in AST LLC, partially offset by an increase in net loss generated at AST LLC.
Current wording
Net loss attributable to noncontrolling interest was $36.5 million for the three months ended June 30, 2025 as compared to $58.8 million for the three months ended June 30, 2024. This decrease in net loss attributable to noncontrolling interest was due to a decrease in noncontrolling interest’s ownership percentage in AST LLC, partially offset by an increase in net loss generated at AST LLC.
Previous wording
Revenues increased by $0.2 million, or 44%, to $0.7 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase in revenues was driven by a $0.4 million increase from resale of gateway equipment to a mobile network operator, partially offset by a $0.2 million decrease in revenues from agreements with prime contractors for U.S. government contracts.
Current wording
Revenues increased by $0.5 million, or 34%, to $1.9 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase in revenues was primarily attributable to increase in revenue from resale of gateway equipment to MNOs.
Previous wording
Interest income increased by $5.9 million to $8.2 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase was driven by a higher cash and cash equivalents balance held in interest bearing short-term money market funds.
Current wording
Interest income increased by $11.3 million to $16.2 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase was driven by a higher cash and cash equivalents balance held in interest bearing short-term money market funds.
Previous wording
Our current sources of liquidity are cash and cash equivalents on hand. As of March 31, 2025, we had $874.5 million of cash and cash equivalents on hand, including $0.7 million of restricted cash. We believe our existing cash and cash equivalents on hand will be sufficient to meet our anticipated cash requirements, including current working capital needs, planned operating expenses and capital expenditures for a period of the next 12 months from the date of this Quarterly Report.
Current wording
Our current sources of liquidity are cash and cash equivalents on hand. As of June 30, 2025, we had $939.4 million of cash and cash equivalents on hand, including $15.8 million of restricted cash. In July 2025, we raised additional net proceeds of approximately $111.3 million from the sale of shares of our Class A Common Stock under the 2025 ATM Equity Program (defined below) and approximately $506.0 million from the issuance of the 2032 2.375% Convertible Notes after deducting the initial purchasers’ discounts and commissions and the estimated offering expenses payable by us and paying the cost of the capped call hedge. We believe our existing cash and cash equivalents on hand will be sufficient to meet our anticipated cash requirements, including current working capital needs, planned operating expenses and capital expenditures for a period of the next 12 months from the date of this Quarterly Report.
Previous wording
The design, assembly, integration, testing and launch of satellites and related ground infrastructure is capital intensive. We currently estimate the average capital costs, consisting of direct materials and launch costs, for a constellation of over 90 Block 2 BB satellites to be approximately $21.0 million to $23.0 million per satellite, an increase from previous estimates of $19.0 million to $21.0 million per satellite, reflecting anticipated initial launch costs higher than that range, driven by recently secured near-term launch capacity and trending down over time as we optimize payloads and related launch terms and our ongoing evaluation of a multitude of launch opportunities, and anticipated higher direct materials cost due to recently announced tariffs. The estimated average capital cost per Block 2 BB satellite is based on securing future launch contracts with more favorable terms, diversifying our supply chain to include cost-effective and low-cost suppliers, cost reductions due to the benefits of economies of scale, continuous process improvements, and other factors. If we are unable to achieve the supply chain diversifications, cost reductions, process improvements, and secure favorable future launch contracts, the average capital cost of the Block 2 BB satellites will be higher and such variations could be material.
Current wording
The design, assembly, integration, testing and launch of satellites and related ground infrastructure is capital intensive. We continue to estimate the average capital costs, consisting of direct materials and launch costs, for a constellation of over 90 Block 2 BB satellites to be approximately $21.0 million to $23.0 million per satellite, with initial launches higher than that range and trending down over time as we optimize payloads and related launch terms and evaluate a multitude of launch opportunities. The estimated average capital cost per Block 2 BB satellite is based on securing future launch contracts with more favorable terms, diversifying our supply chain to include cost-effective and low-cost suppliers, cost reductions due to the benefits of economies of scale, continuous process improvements, and other factors. If we are unable to achieve the supply chain diversifications, cost reductions, process improvements, and secure favorable future launch contracts, the average capital cost of the Block 2 BB satellites will be higher and such variations could be material.
Previous wording
On January 5, 2025, AST LLC entered into a binding agreement (the “Strategic Collaboration Term Sheet”) with Ligado LLC under which we will receive long-term access to up to 45 MHz of lower mid-band spectrum in the United States and Canada for direct-to-device satellite applications. The Strategic Collaboration Term Sheet was entered into as part of the restructuring of Ligado LLC, which together with certain of its direct and indirect subsidiaries filed voluntary petitions for relief under Chapter 11 of United States Bankruptcy Code in the United States Bankruptcy Court for the District of Delaware on January 5, 2025. The transactions contemplated in the Strategic Collaboration Term Sheet (collectively, the “Spectrum Usage Rights Transactions”) are subject to the approval of the bankruptcy court.
Current wording
On January 5, 2025, AST LLC entered into a binding agreement (the “Strategic Collaboration Term Sheet”) with Ligado LLC under which we will receive long-term access to up to 45 MHz of lower mid-band spectrum in the United States and Canada for direct-to-device satellite applications. The Strategic Collaboration Term Sheet was entered into as part of the restructuring of Ligado LLC, which together with certain of its direct and indirect subsidiaries filed voluntary petitions for relief under Chapter 11 of United States Bankruptcy Code in the Bankruptcy Court.
Previous wording
To support the consideration payable under the Framework Agreement, on March 5, 2025 (“Commitment Date”), SpectrumCo received a $550.0 million (“Loan Amount”) institutional financing commitment in the form of a single draw non-recourse senior-secured delayed-draw term loan facility (“Facility”), available for nineteen months from the Commitment Date with an option to extend for an additional six months (“Availability Period”). The Facility includes a commitment fee, payable in cash or shares of our Class A Common Stock at our option, that is 2% of the Loan Amount due on the Commitment Date and upon entry into definitive documentation for the Facility (“Closing Date”). As of March 31, 2025, we paid $2.8 million of the commitment fee in cash. If we terminate the Facility prior to the end of the Availability Period, we will pay a termination fee, payable in cash or shares of our Class A Common Stock at our option, ranging from 1% to 5% of the Loan Amount depending on when we terminate the Facility. The Facility also includes an upfront fee that is 3% of the Loan Amount when we draw on the Facility as a reduction to proceeds received and some other fees that become payable starting from the Closing Date.
Current wording
The Sound Point Credit Facility requires us to pay a commitment fee equal to 2% of the Loan Amount. The Sound Point Credit Facility also includes a ticking fee equal to 0.15% of the Loan Amount payable on a monthly basis from the Credit Facility Closing Date to the date the Sound Point Credit Facility is drawn. If we terminate the Sound Point Credit Facility prior to the end of the Availability Period, we will be required to pay a termination fee, payable in cash or shares of our Class A Common Stock at our option, ranging from 1% to 5% of the Loan Amount depending on when we terminate the Sound Point Credit Facility. The Sound Point Credit Facility also requires us to pay an upfront fee equal to 3% of the Loan Amount that will become payable when we draw on the Sound Point Credit Facility (and will act as a reduction to proceeds received) and some other fees that will become payable starting from the Closing Date.
Previous wording
During the three months ended March 31, 2025, there were no material changes in the contractual minimum principal and interest payments required on all of our outstanding debt and operating leases described in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024, other than the full conversion of the 2034 Convertible Notes into shares of our Class A Common Stock as described below.
Current wording
During the six months ended June 30, 2025, the contractual minimum principal and interest payments required on all of our outstanding debt and operating leases described in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024 changed to reflect (i) the full conversion of the 2034 Convertible Notes into shares of our Class A Common Stock and (ii) the drawing of $25.0 million from the Trinity Capital Equipment Loan as described below. As of the date of this Quarterly Report, our contractual minimum principal and interest payments further changed to reflect: (i) the conversion of $360.0 million principal of the 2032 4.25% Convertible Notes into shares of our Class A Common Stock and (ii) issuance of $575.0 million 2032 2.375% Convertible Notes as described below.
Previous wording
As of March 31, 2025, we had contractual commitments with third parties in the aggregate amount of approximately $300.0 million related to procurement of BB satellite components, R&D programs, operational services, and capital improvements for meeting our goal of production of 40 fully integrated BB satellites and microns for 53 BB satellites. We have various rights to adjust the quantity of satellite components on the purchase orders and/or change the delivery timelines in accordance with our ongoing business plan. We also have rights to terminate these agreements in accordance with the terms of the agreement and potentially incur a termination fee in certain cases. In addition, we have launch agreements under which payments are due at scheduled milestones over the duration of the agreement, including certain milestones where payments are contingent and not due unless launch providers meet the milestones as defined in the agreement. As of March 31, 2025, the minimum commitments related to the future launches are approximately $300.0 - $350.0 million. We have contractual rights to cancel these launches or terminate the related agreements at any time by paying a termination fee, and in certain cases without incurring a termination fee, and any excess payments made to the launch providers for these launches will be refunded to us.
Current wording
As of June 30, 2025, we had contractual commitments with third parties in the aggregate amount of approximately $384.8 million related to procurement of BB satellite components, R&D programs, operational services, and capital improvements for meeting our goal of production of 40 fully integrated BB satellites and microns for 53 BB satellites. We have various rights to adjust the quantity of satellite components on the purchase orders and/or change the delivery timelines in accordance with our ongoing business plan. We also have rights to terminate these agreements in accordance with the terms of the agreement and potentially incur a termination fee in certain cases. In addition, we have launch agreements under which payments are due at scheduled milestones over the duration of the agreement, including certain milestones where payments are contingent and not due unless launch providers meet the milestones as defined in the agreement. As of June 30, 2025, the minimum commitments related to the future launches are approximately $145.0 - $175.0 million. We have contractual rights to cancel these launches or terminate the related agreements at any time by paying a termination fee, and in certain cases without incurring a termination fee, and any excess payments made to the launch providers for these launches will be refunded to us.
Showing the first 40 of 52 pairs. Open the source sections for the rest.
Rearranged current paragraphs (14)
Current report — wording carried from elsewhere
On March 22, 2025, we and certain of our subsidiaries entered into certain definitive agreements with Ligado Networks LLC (“Ligado LLC”) and its subsidiaries (together with Ligado LLC, “Ligado”) for usage rights for mid-band spectrum, which were approved by the United States Bankruptcy Court for the District of Delaware (the “Bankruptcy Court”) on June 23, 2025. Subject to the completion of certain conditions, including regulatory approval, as a result of the transaction with Ligado, we expect our network will be enhanced by our long-term access to up to 45 MHz of the lower mid-band satellite spectrum in the United States and Canada through our usage agreements. On August 5, 2025, we entered into an agreement to acquire an entity that holds certain S-Band International Telecommunication Union (“ITU”) priority rights to Mobile Satellite Services (“MSS”) frequencies in the range of 1980-2010 MHz and 2170-2200 MHz, for use in LEO. Upon closing, we expect our network will be further enhanced by up to 60 MHz of mid-band satellite spectrum globally. This transaction is expected to close in the second half of 2025, subject to completion of customary closing conditions.
Current report — wording carried from elsewhere
As of June 30, 2025, our IP portfolio consists of approximately 3,700 patent and patent pending claims worldwide, of which approximately 1,700 have been officially granted or allowed. This includes 36 patent families worldwide. Our patents have various terms expiring starting 2039. We are headquartered in Texas where we operate over 200,000 square feet satellite assembly, integrating and testing (“AIT”) facilities.
Current report — wording carried from elsewhere
We are progressing according to our previously announced plan for the procurement and production of Block 2 BB satellites in alignment with our planned 2025 and 2026 launch cadence. Supplier agreements and orders are in place for the procurement of substantially all materials and components needed, in accordance with our production plan, for the assembly, integration and testing necessary to complete 40 fully integrated and assembled Block 2 BB satellites and fully assembled microns and phased array for 53 Block 2 BB satellites.
Current report — wording carried from elsewhere
Interest income was $8.0 million for the three months ended June 30, 2025 as compared to interest income of $2.7 million for three months ended June 30, 2024. The increase was driven by a higher cash and cash equivalents balance held in interest bearing short-term money market funds.
Current report — wording carried from elsewhere
We report our results of operations under one operating segment. The following table sets forth a summary of our unaudited condensed consolidated statements of operations for the six months ended June 30, 2025 and 2024 (in thousands), and the discussion that follows compares the six months ended June 30, 2025 to the six months ended June 30, 2024.
Current report — wording carried from elsewhere
Percentage greater than or equal to 100 or not meaningful
Current report — wording carried from elsewhere
Total depreciation and amortization expense decreased by $17.7 million, or 44%, to $22.7 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The decrease was due to a lower depreciation expense recognized for the Block 1 BB satellites, which we launched in September 2024, as compared to the depreciation expense recognized in the comparative period for the BW3 test satellite, which was fully depreciated as of August 30, 2024.
Current report — wording carried from elsewhere
The fair value adjustment for Private Placement Warrants outstanding at June 30, 2025 resulted in a loss of $68.2 million for the six months ended June 30, 2025 as compared to a loss of $47.9 million for the six months ended June 30, 2024. The increase in loss was largely driven by changes in our share price.
Current report — wording carried from elsewhere
Interest expense increased by $1.1 million, or 11%, to $10.4 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. The increase in interest expense was largely due to an increase in interest expense recognized on the 2032 4.25% Convertible Notes we issued on January 27, 2025, partially offset by decreases in interest expense recognized on the 2034 Convertible Notes, which we converted into shares of our Class A Common Stock on January 22, 2025, and on a senior secured credit facility, which we terminated on November 13, 2024.
Current report — wording carried from elsewhere
The provision for income taxes was $(0.9) million and $(0.5) million for the six months ended June 30, 2025 and 2024, respectively. The consolidated effective tax rate for the six months ended June 30, 2025 and June 30, 2024 was (0.45%) and (0.31%), respectively. Refer to Note 11 Income Taxes in the accompanying notes to the unaudited condensed consolidated financial statements for further information.
Current report — wording carried from elsewhere
Net Loss Attributable to Noncontrolling Interest
Current report — wording carried from elsewhere
Net loss attributable to noncontrolling interest was $54.4 million for the six months ended June 30, 2025 as compared to $78.9 million in the six months ended June 30, 2024. This decrease in net loss attributable to noncontrolling interest was due to a decrease in noncontrolling interest’s ownership percentage in AST LLC, partially offset by an increase in net loss generated at AST LLC.
Current report — wording carried from elsewhere
On May 13, 2025, we entered into a new Equity Distribution Agreement (the “2025 Sales Agreement” or “2025 ATM Equity Program”) with B. Riley Securities, Inc., Barclays Capital Inc., BofA Securities, Inc., Cantor Fitzgerald & Co., Deutsche Bank Securities Inc., Roth Capital Partners, LLC, Scotia Capital (USA) Inc., UBS Securities LLC and William Blair & Company, L.L.C. (collectively, the “agents”) to sell shares of the Class A Common Stock having an aggregate sale price of up to $500.0 million through an “at the market offering” program under which the agents acted as sales agents. The agents were entitled to total compensation at a commission rate of up to 3.0% of the gross sales price per share sold.
Current report — wording carried from elsewhere
On January 27, 2025, we issued $460.0 million aggregate principal amount of convertible senior notes due 2032 (the “2032 4.25% Convertible Notes”), including the exercise in full of the option granted to the initial purchasers to purchase up to $60.0 million aggregate principal amount of notes. The net proceeds of the 2032 4.25% Convertible Notes were $446.3 million after deducting the initial purchasers’ discounts and commissions and the estimated offering expenses payable by us. We used approximately $44.5 million of the net proceeds to pay the cost of the privately negotiated capped call transactions (the “January 2025 Capped Calls”). The remaining net proceeds were and are expected to continue to be used for working capital or other general corporate purposes.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
On April 25, 2025, a subsidiary of ours entered a new contract with the DIU through a prime contractor with total expected revenue of up to approximately $20.0 million for SpaceMobile capabilities with multiple U.S. government agencies in support of government communications over land, sea, and air.