Alcoa Corp
For the period ended Jun 30, 2024. Filed Aug 2, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2024 · Filed Aug 2, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-03-31; filed 2024-05-02.
0000950170-24-052174
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-06-30; filed 2024-08-02.
0000950170-24-090092
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 244 previous paragraphs and 263 current paragraphs.
107 unchanged; 66 reworded; 86 added; 63 removed; 8 previous and 4 current paragraphs rearranged.
Tables are not compared: 8 previous and 8 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (86)
Current report
Additionally, Alcoa continued to execute initiatives to further enhance its operations and reduce controllable costs. The Company’s smelters in Canada and Norway set year-to-date production records, and the Alumar smelter established stability and increased operating capacity to approximately 72 percent. The full curtailment of the Kwinana refinery in Australia was completed in June 2024, as planned.
Current report
On August 1, 2024, Alcoa completed the acquisition of all of the ordinary shares of Alumina Limited (Alumina Shares) through a wholly owned subsidiary, AAC Investments Australia 2 Pty Ltd. Alumina Limited holds a 40% ownership interest in the AWAC joint venture. Under the Scheme Implementation Deed (the Agreement) entered into in March 2024, as amended in May 2024, holders of Alumina Shares received 0.02854 Alcoa CHESS Depositary Interests (CDIs) for each Alumina Share (the Agreed Ratio), except that i) holders of Alumina Shares represented by American Depositary Shares, each of which represented 4 Alumina Shares, received 0.02854 shares of Alcoa common stock and ii) a certain shareholder received, for certain of their Alumina Shares, 0.02854 shares of Alcoa non-voting convertible preferred stock. The Alcoa CDIs are quoted on the Australian Stock Exchange under the trading symbol AAI.
Current report
At closing, Alumina Shares outstanding of 2,760,056,014 and 141,625,403 were exchanged for 78,772,422 and 4,041,989 shares of Alcoa common stock and Alcoa preferred stock, respectively. Based on Alcoa’s closing share price as of July 26, 2024, the Agreed Ratio implies a value of A$1.45 per Alumina Share and aggregate purchase consideration of approximately $2,800 for Alumina Limited.
Current report
The transaction consisted in substance of the acquisition of Alumina Limited’s noncontrolling interest in AWAC, the assumption of Alumina Limited’s indebtedness (approximately $385 as of August 1, 2024), and the recognition of deferred tax assets (approximately $100) related to Alumina Limited’s prior net operating losses. The accounting for the transaction is not yet complete and the final value of assets and liabilities acquired is subject to change. Alcoa’s fees and expenses related to the transaction include financial advisor fees, filing fees, legal and accounting fees, and regulatory fees. The Company expects to incur approximately $35 of transaction costs related to the transaction. In the third quarter of 2024, Net income attributable to noncontrolling interest will be reported through July 31, 2024 and cease thereafter.
Current report
Alumar Smelter
Current report
During the second quarter of 2024, the Company resumed the controlled pace for the restart of the Alumar smelter and continued actions to improve the smelter’s overall performance, after the smelter experienced operational instability in the prior quarter. The site was operating at approximately 72 percent of the site’s total annual capacity of 268 kmt (Alcoa share) as of June 30, 2024.
Current report
Improving the competitiveness of the complex is dependent on finding competitive energy for both the smelter and refinery. While electricity and gas prices have declined since the global energy crisis in 2022, power prices remain uneconomical due to (i) a lack of material indirect carbon dioxide cost compensation from the Spanish government; (ii) substantial transmission costs; and (iii) permitting delays and adjustments to renewable power generation projects associated with two long-term power purchase agreements with renewable energy providers that Alcoa entered into in 2022. Additionally, Alcoa initiated a process for the potential sale of the complex during the first quarter of 2024 which is expected to conclude in the second half of 2024. Any long-term solution for the complex requires the support of the government and workers’ representatives.
Current report
Net income (loss) attributable to Alcoa Corporation was $20 in the second quarter of 2024 compared with $(252) in the first quarter of 2024. The favorable change of $272 is primarily a result of:
Current report
Lower restructuring charges
Current report
Favorable mark-to-market results on derivative instruments
Current report
Favorable equity earnings
Current report
Higher taxes on higher earnings
Current report
Increased interest expense
Current report
Net income (loss) attributable to Alcoa Corporation was $(232) in the six-month period of 2024 compared with $(333) in the six-month period of 2023. The favorable change of $101 is primarily a result of:
Current report
Lower equity losses
Current report
Sales increased $307 primarily as a result of:
Current report
Higher shipments of aluminum
Current report
Higher volumes and price from bauxite offtake and supply agreements
Current report
Lower shipments of alumina
Current report
Sales increased $151 primarily as a result of:
Current report
Higher shipments of aluminum and alumina
Current report
Lower volumes and price from bauxite offtake and supply agreements
Current report
Higher energy costs primarily due to unfavorable natural gas prices
Current report
Favorable raw material costs
Current report
Lower energy costs across both segments
Current report
Selling, general administrative, and other expenses increased $9 in comparison to the first quarter of 2024 and increased $23 in comparison to the six-month period of 2023. Both the sequential and year-to-date increases are primarily a result of higher labor costs.
Current report
Depreciation increased $2 primarily as a result of:
Current report
Higher depreciation due to the write off of assets for projects no longer being pursued
Current report
Depreciation increased $18 primarily as a result of:
Current report
Interest expense increased $13 in comparison to the first quarter of 2024 and increased $14 in comparison to the six-month period of 2023. Both the sequential and year-to-date increases are primarily a result of additional interest on the $750 7.125% Senior Notes issued in March 2024.
Current report
Other (income) expenses, net
Current report
Favorable mark-to-market results on derivative instruments due to higher power prices in the current quarter
Current report
Lower ELYSIS capital contributions, reducing loss recognition
Current report
Other (income) expenses, net was $37 in the six-month period of 2024 compared with $60 in the six-month period of 2023. The favorable change of $23 was primarily a result of:
Current report
Lower ELYSIS capital contributions, reducing loss recognition
Current report
In the second quarter of 2024, Restructuring and other charges, net of $18 primarily related to:
Current report
$8 for the curtailment of the Kwinana refinery
Current report
$8 for Wenatchee take-or-pay energy contract
Current report
$4 for Wenatchee take-or-pay energy contract
Current report
In the six-month period of 2024, Restructuring and other charges, net of $220 primarily related to:
Showing the first 40 of 86 passages. Open the source sections for the rest.
Removed paragraphs (63)
Previous report
On March 11, 2024, the Company and Alumina Limited entered into a Scheme Implementation Deed (the Agreement) for Alcoa’s acquisition of all Alumina Limited ordinary shares (the Transaction), following an agreement reached on February 26, 2024, between Alcoa and Alumina Limited, on terms and process for the acquisition of Alumina Limited (the Process Deed). Under the Agreement, Alumina Limited shareholders would receive consideration of 0.02854 Alcoa common shares for each Alumina Limited share (the Agreed Ratio). Upon completion of the transaction, Alumina Limited shareholders would own 31.25 percent, and Alcoa shareholders would own 68.75 percent of the combined company, on a fully diluted basis. Based on Alcoa’s closing share price as of February 23, 2024, the last trading day prior to the announcement of the Process Deed, the Agreed Ratio implies a value of A$1.15 per Alumina Limited share and an equity value of approximately $2,200 for Alumina Limited.
Previous report
Alcoa expects the transaction to close in the third quarter of 2024 following a shareholder vote and the receipt of regulatory approvals. Both Alcoa and Alumina Limited shareholders will benefit from cost synergies, simplification of the organizational structure, and increased flexibility in funding and capital allocation decisions upon completion of the transaction.
Previous report
In addition to the implied premium over recent share prices, Alumina Limited shareholders’ ownership will be diversified to a large-scale, global upstream aluminum portfolio and interests in Alcoa common shares will be traded in Australia through a secondary listing on the Australian Securities Exchange via CHESS Depositary Interests.
Previous report
Net loss attributable to Alcoa Corporation was $252 in the first quarter of 2024 compared with $150 in the fourth quarter of 2023. The unfavorable change of $102 is primarily a result of:
Previous report
Higher restructuring charges
Previous report
Higher production costs
Previous report
Lower average realized prices of aluminum
Previous report
Absence of a charge to tax expense to record a valuation allowance against the deferred tax assets of AWAB
Previous report
Net loss attributable to Alcoa Corporation was $252 in the first quarter of 2024 compared with $231 in the first quarter of 2023. The unfavorable change of $21 is primarily a result of:
Previous report
Higher restructuring charges
Previous report
Higher production costs
Previous report
Lower taxes on lower earnings
Previous report
Higher equity earnings
Previous report
Sales increased $4 primarily as a result of:
Previous report
Higher shipments of alumina
Previous report
Lower shipments of aluminum
Previous report
Sales decreased $71 primarily as a result of:
Previous report
Higher shipments of alumina and aluminum
Previous report
Selling, general administrative, and other expenses decreased $4 primarily as a result of:
Previous report
Lower information technology services and external legal fees
Previous report
Higher labor costs
Previous report
Selling, general administrative, and other expenses increased $6 primarily as a result of:
Previous report
Higher labor costs
Previous report
Depreciation decreased $2 primarily as a result of:
Previous report
Absence of asset write offs recognized in the fourth quarter of 2023 for projects no longer being pursued
Previous report
Depreciation increased $8 primarily as a result of:
Previous report
Interest expense decreased $1 in comparison to the fourth quarter of 2023 and increased $1 in comparison to the first quarter of 2023.
Previous report
Other expenses (income), net
Previous report
Additional costs related to site separation commitments associated with the Warrick Rolling Mill sale
Previous report
Other expenses (income), net was $59 in the first quarter of 2024 compared with $54 in the first quarter of 2023. The unfavorable change of $5 was primarily a result of:
Previous report
Decrease in costs related to site separation commitments associated with the Warrick Rolling Mill sale
Previous report
In the fourth quarter of 2023, Restructuring and other charges, net of $(11) primarily related to:
Previous report
$(19) for the sale of unused carbon credits at a previously closed location
Previous report
$197 for the curtailment of the Kwinana alumina refinery
Previous report
In the three-month period of 2023, Restructuring and other charges, net of $149 primarily related to:
Previous report
(Benefit from) provision for income taxes
Previous report
The decrease in tax expense of $168 is primarily attributable to the full valuation allowance of $152 recorded against the deferred tax assets of AWAB in the fourth quarter of 2023 and lower income in the jurisdictions where taxes are paid.
Previous report
Alumina production decreased 4% primarily as a result of:
Previous report
Alumina production decreased 3% primarily as a result of:
Previous report
Third-party sales increased $56 primarily as a result of:
Showing the first 40 of 63 passages. Open the source sections for the rest.
Reworded paragraphs (66)
Previous wording
During the first quarter of 2024, Alcoa entered into a binding agreement to acquire Alumina Limited, which holds a 40 percent ownership interest in the AWAC joint venture. The acquisition is intended to enhance Alcoa’s position as a leading pure play, upstream aluminum company globally, while simplifying the Company’s corporate structure and governance, resulting in greater operational flexibility and strategic optionality. In addition to announcing the Alumina Limited acquisition, the Company continued to make progress on key near term actions to further optimize its portfolio and to reduce controllable costs during the first quarter of 2024.
Current wording
Alcoa continued to progress the acquisition of Alumina Limited during the second quarter of 2024 and announced the completion of the acquisition on August 1, 2024. The acquisition is intended to enhance Alcoa’s position as a leading pure play, upstream aluminum company globally, while simplifying the Company’s corporate structure and governance, resulting in greater operational and financial flexibility and strategic optionality.
Previous wording
For Alcoa shareholders, the transaction will enhance Alcoa’s vertical integration along the value chain across bauxite mining, alumina refining, and aluminum smelting, increases Alcoa’s economic interest in its bauxite and alumina assets, simplifies governance, and reaffirms Alcoa’s commitment to Western Australia.
Current wording
For Alcoa shareholders, the transaction enhances Alcoa’s vertical integration along the value chain across bauxite mining, alumina refining, and aluminum smelting, increases Alcoa’s economic interest in its bauxite and alumina assets, simplifies governance, and reaffirms Alcoa’s commitment to Western Australia. In addition to the implied premium over prior share prices, Alumina Limited shareholders’ ownership is diversified to a large-scale, global upstream aluminum portfolio.
Previous wording
Under the terms of the Agreement, Alcoa also agreed to provide a shareholder loan to AWAC in place of required capital contributions by Alumina Limited if Alumina Limited’s net debt position exceeds $420. Based on AWAC’s current 2024 cash flow forecast, Alcoa does not expect any support to be required in 2024. Subject to certain accelerated repayment triggers, Alumina Limited would be required to pay its equity calls (plus accrued interest) no later than September 1, 2025 in the event the transaction is not completed. Alcoa’s fees and expenses related to the transaction include financial advisor fees, filing fees, legal and accounting fees, and regulatory fees, some of which will be paid regardless of whether the transaction is completed. Alcoa and Alumina Limited are also subject to termination fees in the event the transaction is not completed.
Current wording
Additionally, under the terms of the Agreement, Alcoa agreed to provide a shareholder loan to AWAC in place of required capital contributions by Alumina Limited if Alumina Limited’s net debt position exceeded $420 prior to the acquisition closing. Alcoa was not required to and did not provide any shareholder loans to AWAC under this provision.
Previous wording
In January 2024, Alcoa announced the full curtailment of the Kwinana refinery which will be completed in the second quarter of 2024. The refinery has an annual nameplate capacity of 2.2 million metric tons and has been operating at approximately 80 percent of its nameplate capacity since January 2023, when the Company reduced production in response to a domestic natural gas shortage in Western Australia due to production challenges experienced by key gas suppliers. The Company’s decision to fully curtail the refinery was made based on a variety of factors, including the refinery’s age, scale, operating costs, and current bauxite grades, in addition to market conditions. The refinery currently has approximately 780 employees and this number will be reduced to approximately 250 in the third quarter of 2024, after alumina production has ceased. Certain processes will continue until about the third quarter of 2025, when the employee number will be further reduced to approximately 50. In addition to the employees separating as a result of the curtailment, approximately 150 employees will either terminate through the productivity program announced in the third quarter of 2023 or redeploy to other Alcoa operations.
Current wording
In June 2024, Alcoa completed the full curtailment of the Kwinana refinery, as planned, which was announced in January 2024. The Company’s decision to fully curtail the refinery was made based on a variety of factors, including the refinery’s age, scale, operating costs, and current bauxite grades, in addition to market conditions.
Previous wording
During the first quarter of 2024, Alcoa completed the restart of approximately 6 percent of pots at the San Ciprián smelter in compliance with the February 2023 updated viability agreement. Although both purchase prices for energy and sales prices improved during the first quarter of 2024, the San Ciprián complex remains unviable for the long-term based on current and forward market assumptions for delivered energy in Spain and sales prices, and near-term government support remains unlikely. While continuing to optimize the smelter and refinery operations and preserve cash, and as part of Alcoa’s efforts to find a long-term solution for the complex, Alcoa initiated a process for the potential sale of the complex during the first quarter of 2024 and anticipates completing the bid process by June 2024. Any long-term solution requires the support of the government and workers’ representatives.
Current wording
During the second quarter of 2024, Alcoa continued its focus on improving the competitiveness of both the San Ciprián refinery and smelter, while progressing the process for the potential sale of the complex. Alcoa completed the restart of approximately 6 percent of pots at the San Ciprián smelter in the first quarter of 2024, in compliance with the February 2023 updated viability agreement.
Previous wording
The refinery and smelter incurred significant losses in the first quarter of 2024 and in prior years, which have been funded with internal credit lines that are now nearing their limits (with less than $100 available to be drawn), and which the operations have no ability to repay. While the Company had restricted cash of $86 remaining at March 31, 2024 (see Aluminum below) to be made available for capital improvements at the site and smelter restart costs, the workers’ representatives have rejected the use of this cash to fund operating losses at the smelter. Based on current economic conditions, and barring reaching an acceptable outcome on either achieving economic viability or completing a sale of the complex, the San Ciprián operations are expected to incur substantial losses in the remainder of 2024 and Alcoa anticipates that available funding will be exhausted in the second half of 2024. At that point, Alcoa will not provide additional funding and difficult decisions will have to be considered regarding the future of the San Ciprián complex.
Current wording
The refinery and smelter incurred substantial losses in the first half of 2024 and in prior years, which have been funded with internal credit lines that are nearing their limits and for which the operations have no ability to repay. The operations have approximately $100 of available funding with cash on hand and availability under internal credit lines. Although aluminum and alumina prices improved during the first half of 2024, the San Ciprián complex remains unviable based on current and forward market assumptions for delivered energy in Spain and sales prices. While the Company had restricted cash of $86 remaining at June 30, 2024 (see Aluminum below) to be made available for capital improvements at the site and smelter restart costs, the workers’ representatives have rejected the use of this cash to fund operating losses at the smelter. Based on current economic conditions, and barring reaching an acceptable outcome on either achieving economic viability or completing a sale of the complex, the San Ciprián operations are expected to incur losses in 2024 and Alcoa anticipates that available funding will be exhausted by the end of 2024. At that point, Alcoa will not provide additional funding and difficult decisions will have to be considered regarding the future of the San Ciprián complex.
Previous wording
On March 21, 2024, the Company completed an offering of $750 aggregate principal amount of 7.125 percent senior notes due in 2031. This was the Company’s first notes issuance under its new Green Finance Framework, which prioritizes climate change mitigation expenditures related to circular or low carbon products, pollution prevention technologies, renewable energy, and water management. Net proceeds from the issuance, which can be allocated to qualifying expenditures on a two-year look back and three-year look forward, are expected to cover expenses associated with both new and existing decarbonization and water management projects, research and development, renewable energy, and the production of low carbon alumina and aluminum products. The net proceeds will also support the Company’s cash position and ongoing cash needs, including with respect to its previously announced portfolio actions. The Company does not expect to allocate part of the net proceeds to significant capital investments in breakthrough technologies as those are not expected to occur within the applicable time period.
Current wording
In March 2024, the Company completed an offering of $750 aggregate principal amount of 7.125 percent senior notes due in 2031. This was the Company’s first notes issuance under its Green Finance Framework, which prioritizes climate change mitigation expenditures related to circular or low carbon products, pollution prevention technologies, renewable energy, and water management. The Company is utilizing net proceeds from the issuance, which can be allocated to qualifying expenditures on a two-year look back and three-year look forward, to cover expenses associated with both new and existing decarbonization and water management projects, research and development, renewable energy, and the production of low carbon alumina and aluminum products. The net proceeds also support the Company’s cash position and ongoing cash needs, including with respect to its previously announced portfolio actions. The Company does not expect to allocate part of the net proceeds to significant capital investments in breakthrough technologies as those are not expected to occur within the applicable time period.
Previous wording
The Company paid a quarterly cash dividend of $0.10 per share of the Company’s common stock in March 2024, totaling $19.
Current wording
The Company paid a quarterly cash dividend of $0.10 per share of the Company’s common stock in June 2024, totaling $18.
Previous wording
Increased offtake from a joint venture supply agreement
Current wording
Increased offtake from an aluminum joint venture supply agreement
Previous wording
Cost of goods sold as a percentage of sales decreased 1% primarily as a result of:
Current wording
Cost of goods sold as a percentage of sales decreased 5% primarily as a result of:
Previous wording
Higher production costs, primarily in the Aluminum segment
Current wording
Lower production costs primarily in the Aluminum segment
Previous wording
Cost of goods sold as a percentage of sales increased 2% primarily as a result of:
Current wording
Cost of goods sold as a percentage of sales decreased 2% primarily as a result of:
Previous wording
Other expenses (income), net was $59 in the first quarter of 2024 compared with $(11) in the fourth quarter of 2023. The unfavorable change of $70 was primarily a result of:
Current wording
Other (income) expenses, net was $(22) in the second quarter of 2024 compared with $59 in the first quarter of 2024. The favorable change of $81 was primarily a result of:
Previous wording
Decrease in equity losses from the Ma’aden aluminum joint venture primarily due to higher sales volume, partially offset by higher production costs
Current wording
Increase in equity income from the Ma’aden aluminum joint venture primarily due to higher aluminum prices
Previous wording
Decrease in equity losses from the Ma’aden bauxite and alumina joint venture primarily due to higher shipments, partially offset by increased raw material and production costs
Current wording
Decrease in equity losses from the Ma’aden bauxite and alumina joint venture primarily due to lower raw material and production costs, and higher alumina prices
Previous wording
Unfavorable currency revaluation impacts primarily due to losses recognized in the current quarter primarily due to the U.S. dollar strengthening against the Brazilian real, partially offset by the absence of gains recognized in the first quarter of 2023 due to the U.S. dollar weakening against the Brazilian real
Current wording
Unfavorable currency revaluation impacts primarily due to losses recognized in the current quarter due to the U.S. dollar strengthening against the Brazilian real, partially offset by the absence of gains recognized in the first quarter due to the U.S. dollar strengthening against the Norwegian krone
Previous wording
Decrease in equity losses from the Ma’aden aluminum joint venture primarily due to the absence of a charge for a utility settlement and higher shipments, partially offset by lower aluminum prices
Current wording
Decrease in equity losses from the Ma’aden aluminum joint venture primarily due to the absence of a charge for a utility settlement and higher shipments
Previous wording
Mark-to-market results on derivative instruments primarily due to the absence of gains in the first quarter of 2023 driven by elevated power prices
Current wording
Mark-to-market results on derivative instruments primarily due to higher power prices in the current year
Previous wording
Unfavorable currency revaluation impacts primarily due to the absence of gains recognized in the fourth quarter of 2023 due to the U.S. dollar weakening against the Brazilian real and losses recognized in the current quarter primarily due to the U.S. dollar strengthening against the Brazilian real
Current wording
Unfavorable currency revaluation impacts primarily due to the U.S. dollar strengthening against the Brazilian real in the current year, partially offset by the absence of gains recognized in the prior year due to the U.S. dollar weakening against the Brazilian real
Previous wording
$197 for the curtailment of the Kwinana alumina refinery
Current wording
$197 for the curtailment of the Kwinana refinery
Previous wording
The Benefit from income taxes in the first quarter of 2024 was $(18) on a loss before taxes of $(325) or 5.5%. In comparison, the fourth quarter of 2023 Provision for income taxes was $150 on a loss before taxes of $(77) or (194.8)%.
Current wording
The Provision for income taxes in the second quarter of 2024 was $61 on income before taxes of $92 or 66.3%. In comparison, the first quarter of 2024 Benefit from income taxes was $(18) on a loss before taxes of $(325) or 5.5%.
Previous wording
The Benefit for income taxes in the three-month period of 2024 was $(18) on a loss before taxes of $(325) or 5.5%. In comparison, the three-month period of 2023 Provision for income taxes was $52 on a loss before taxes of $(180) or (28.9)%.
Current wording
The Provision for income taxes in the six-month period of 2024 was $43 on a loss before taxes of $(233) or (18.5)%. In comparison, the six-month period of 2023 Provision for income taxes was $74 on a loss before taxes of $(279) or (26.5)%.
Previous wording
The decrease in tax expense of $70 is primarily attributable to lower income in the jurisdictions where taxes are paid.
Current wording
The decrease in tax expense of $31 is primarily attributable to lower income in the jurisdictions where taxes are paid.
Previous wording
Net loss attributable to noncontrolling interest was $(55) in the first quarter of 2024 compared with $(77) in the fourth quarter of 2023. These amounts are entirely related to Alumina Limited’s 40% ownership interest in several affiliated operating entities.
Current wording
Net income (loss) attributable to noncontrolling interest was $11 in the second quarter of 2024 compared with $(55) in the first quarter of 2024. These amounts are entirely related to Alumina Limited’s 40% ownership interest in several affiliated operating entities. Alcoa will recognize Net income (loss) attributable to Noncontrolling interest through the closing of the Alumina Limited acquisition.
Previous wording
The change is primarily a result of lower taxes and higher average realized price of alumina, partially offset by higher restructuring costs.
Current wording
The change is primarily a result of lower restructuring costs, favorable mark-to-market results on derivative instruments, and higher average realized price of alumina, partially offset by higher production costs and higher taxes.
Previous wording
Net loss attributable to noncontrolling interest was $(55) in the three-month period of 2024 compared with $(1) in the three-month period of 2023. These amounts are entirely related to Alumina Limited’s 40% ownership interest in several affiliated operating entities.
Current wording
Net income (loss) attributable to noncontrolling interest was $(44) in the six-month period of 2024 compared with $(20) in the six-month period of 2023. These amounts are entirely related to Alumina Limited’s 40% ownership interest in several affiliated operating entities. Alcoa will recognize Net income (loss) attributable to Noncontrolling interest through the closing of Alumina Limited acquisition.
Previous wording
The change is primarily a result of higher restructuring costs and higher production costs, partially offset by lower raw material and energy costs, and lower taxes.
Current wording
The change is primarily a result of higher restructuring costs, higher elimination of intercompany profit in inventory, and higher production costs, partially offset by higher average realized price of alumina, lower raw material and energy costs, and favorable mark-to-market results on derivative instruments.
Previous wording
Business Update. The average API of $356 per metric ton trended favorably compared to the prior quarter reflecting a 6% sequential increase. During the first quarter, the Alumina segment also experienced lower energy and raw materials costs compared to the fourth quarter of 2023.
Current wording
Business Update. The average API of $392 per metric ton trended favorably compared to the prior quarter reflecting a 10% sequential increase.
Previous wording
On January 8, 2024, Alcoa announced the full curtailment of the Kwinana refinery which will be completed in the second quarter of 2024. The refinery currently has approximately 780 employees and this number will be reduced to approximately 250 in the third quarter of 2024, after alumina production has ceased. Certain processes will continue until about the third quarter of 2025, when the employee number will be further reduced to approximately 50. In addition to the employees separating as a result of the curtailment, approximately 150 employees will either terminate through the productivity program announced in the third quarter of 2023 or redeploy to other Alcoa operations.
Current wording
In June 2024, Alcoa completed the full curtailment of the Kwinana refinery, as planned, which was announced in January 2024. As of March 2024, the refinery had approximately 780 employees and this number will be reduced to approximately 250 in the third quarter of 2024 to manage certain processes that will continue until about the third quarter of 2025. At that time, the employee number will be further reduced to approximately 50. In addition to the employees separating as a result of the curtailment, approximately 150 employees will either terminate through the productivity program announced in the third quarter of 2023 or redeploy to other Alcoa operations.
Previous wording
In the first quarter, Alcoa recorded a restructuring charge of $197 related to the curtailment of the refinery. The charge includes $123 for water management costs, $41 for severance and employee termination costs, $15 for asset retirement obligations, $13 for take-or-pay contracts, and $5 for asset impairments. Related cash outlays of approximately $215 (which includes existing employee related liabilities and asset retirement obligations) are expected through 2025, with approximately $140 to be spent in 2024. During the first quarter of 2024, cash outlays were $2.
Current wording
In the second quarter of 2024, Alcoa recorded restructuring charges of $8 related to the curtailment of the refinery including $6 for water management costs and $2 for contract terminations. In the first quarter of 2024, Alcoa recorded restructuring charges of $197 including $123 for water management costs, $41 for employee related costs, $15 for asset retirement obligations, $13 for take-or-pay contracts, and $5 for asset impairments. Related cash outlays of approximately $225 (which includes existing employee related liabilities and asset retirement obligations) are expected through 2025, with approximately $145 to be spent in 2024. The Company spent $22 and $24 against the reserve in the second quarter and six-month period of 2024, respectively.
Previous wording
Capacity. The Alumina segment had a base capacity of 13,843 kmt with 1,452 kmt of curtailed refining capacity. There was no change in curtailed capacity during the quarter.
Current wording
Capacity. The Alumina segment had a base capacity of 13,843 kmt with 3,204 kmt of curtailed refining capacity. In the second quarter of 2024, curtailed capacity increased 1,752 kmt due to the full curtailment of the Kwinana refinery (see above).
Previous wording
Increased production at the San Ciprián refinery as the refinery was operating at 50 percent capacity in the first quarter of 2024, and 35 to 50 percent capacity in the first quarter of 2023
Current wording
Increased production at the San Ciprián refinery as the refinery was operating at 50 percent capacity in the six-month period of 2024 and 30 to 50 percent capacity in the six-month period of 2023
Previous wording
Higher shipments of alumina primarily due to increased trading activity
Current wording
Lower shipments of alumina primarily due to the full curtailment of the Kwinana refinery
Previous wording
Higher shipments, primarily due to the Warrick smelter restart
Current wording
Higher alumina shipments primarily due to the Warrick smelter restart
Previous wording
Lower alumina shipments primarily due to lower alumina production
Current wording
Lower alumina shipments primarily due to lower production at the Australia refineries
Previous wording
Lower energy costs across the refineries primarily due to favorable natural gas prices
Current wording
Lower energy costs primarily due to favorable natural gas prices
Previous wording
Higher production costs primarily related to operating certain of the Australia refineries with lower grade bauxite and higher labor costs
Current wording
Higher production costs primarily related to operating certain of the Australia refineries with lower grade bauxite
Previous wording
Forward Look. For the second quarter of 2024 in comparison to the first quarter of 2024, the Alumina segment anticipates increased costs due to seasonal maintenance and other mining costs.
Current wording
Forward Look. For the third quarter of 2024 in comparison to the second quarter of 2024, the Alumina segment anticipates increased production costs related to lower bauxite grades in Australia.
Previous wording
Business Update. Aluminum prices increased sequentially with LME prices on a 15-day lag averaging $2,201 per metric ton in the first quarter of 2024. During the first quarter, the Aluminum segment also experienced lower energy and raw materials costs compared to the fourth quarter of 2023.
Current wording
Business Update. Aluminum prices increased sequentially with LME prices on a 15-day lag averaging $2,486 per metric ton in the second quarter of 2024.
Previous wording
In March 2024, Alcoa completed the restart of approximately 6 percent of total pots at the San Ciprián smelter as required by the February 2023 updated viability agreement. The Company incurred restart expenses of $2 in the first quarter of 2024. In connection with the December 2021 agreement and the February 2023 updated viability agreement, the Company has restricted cash of $86 remaining at March 31, 2024 to be made available for capital improvements at the site and smelter restart costs. The workers’ representatives have rejected the use of this cash to fund operating losses at the smelter.
Current wording
In March 2024, Alcoa completed the restart of approximately 6 percent of total pots at the San Ciprián smelter as required by the February 2023 updated viability agreement. The Company incurred restart expenses $2 during the six-month period of 2024. In connection with the December 2021 agreement and the February 2023 updated viability agreement, the Company has restricted cash of $86 remaining at June 30, 2024 to be made available for capital improvements at the site and smelter restart costs. The workers’ representatives have rejected the use of this cash to fund operating losses at the smelter.
Showing the first 40 of 66 pairs. Open the source sections for the rest.
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
Prior to the curtailment, the refinery had been operating at approximately 80 percent of its annual nameplate capacity of 2.2 million metric tons since January 2023, when the Company reduced production in response to a domestic natural gas shortage in Western Australia due to production challenges experienced by key gas suppliers.
Current report — wording carried from elsewhere
As of March 2024, the refinery had approximately 780 employees and this number will be reduced to approximately 250 in the third quarter of 2024 to manage certain processes that will continue until about the third quarter of 2025. At that time, the employee number will be further reduced to approximately 50.
Current report — wording carried from elsewhere
Decrease in equity losses from the Ma’aden bauxite and alumina joint venture primarily due to higher shipments, higher alumina prices, and lower production costs
Current report — wording carried from elsewhere
Provision for (benefit from) income taxes
Rearranged previous paragraphs (8)
Previous report — wording carried elsewhere
Decrease in value add product sales
Previous report — wording carried elsewhere
Higher depreciation in Brazil and Australia for mine reclamation and bauxite residue storage asset retirement obligations
Previous report — wording carried elsewhere
$6 related to the February 2023 updated viability agreement for the San Ciprián aluminum smelter
Previous report — wording carried elsewhere
In the three-month period of 2024, Restructuring and other charges, net of $202 primarily related to:
Previous report — wording carried elsewhere
Reduced production at the Australia refineries due to lower bauxite grade
Previous report — wording carried elsewhere
Favorable raw material costs primarily on lower prices for caustic soda
Previous report — wording carried elsewhere
Lower raw material costs primarily on lower market prices for carbon materials
Previous report — wording carried elsewhere
Decrease in value add product sales