Item 1A. Risk Factors

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-06.

0000215466-26-000019

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 2 previous paragraphs and 69 current paragraphs.

1 unchanged; 1 reworded; 67 added; 0 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 1 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (67)

Current report

RISKS RELATED TO OUR INDUSTRY

Current report

Our results of operations, cash flows and operating costs are highly dependent upon the market prices of gold, silver, and copper and of key input commodities used in our business, which are volatile and beyond our control.

Current report

Gold, silver, and copper are actively traded commodities, and their prices are volatile. The high and low prices for each commodity during the 12 months ended December 31, 2025 are set forth in the following table:

Current report

Gold, silver, and copper prices are affected by many factors beyond the Company’s control, including U.S. dollar strength or weakness, speculation, global currency values, global and regional demand and production, political and economic conditions and other factors. In addition, Exchange Traded Funds (“ETFs”), which have substantially facilitated the ability of large and small investors to buy and sell precious metals, have become significant holders of gold, silver, and copper. Precious metals prices are also affected by prevailing interest rates and returns on other asset classes, expectations of the future rate of inflation and governmental monetary decisions regarding central bank holdings.

Current report

Because we derive all of our revenues from sales of these metals, our results of operations and cash flows will fluctuate as the prices of these metals change. A period of significant and sustained lower prices would materially and adversely affect our results of operations and cash flows. In response to environments of lower metal prices and/or higher treatment and refining charges, we may have to revise our operating plans, including reducing operating costs and capital expenditures, terminating or suspending mining operations at one or more of our properties and discontinuing certain exploration and development plans. These types of initiatives may not sufficiently offset reductions in revenues, and we may continue to incur losses associated with sustained lower metals prices and/or higher treatment and refining charges.

Current report

Operating costs at our mines are also affected by the price of input commodities, such as fuel, electricity, labor, chemical reagents, explosives, steel and concrete. Prices for these input commodities are volatile and can fluctuate due to conditions that are difficult to predict, including global competition for resources, inflation, currency fluctuations, consumer or industrial demand and other factors. An increase in the cost, or decrease in the availability, of input commodities, labor, or equipment, due to factors beyond the Company’s control may affect the timely conduct and cost of our operations and development projects. Continued volatility in the prices of commodities and other supplies we purchase could lead to higher costs, which would adversely affect results of operations and cash flows.

Current report

The estimation of mineral reserves and mineral resources is imprecise and depends upon subjective factors. Estimated mineral reserves and mineral resources may not be realized in actual production. Our results of operations and financial position may be adversely affected by inaccurate estimates.

Current report

The mineral reserve and mineral resource figures presented in our public filings are estimates made by our technical personnel and independent mining consultants with whom we contract. Mineral reserve and mineral resource estimates are a function of geological and engineering analyses that require us to make assumptions about production costs, recoveries and the market prices of gold, silver, copper, zinc, and lead. While the Company believes that its mineral reserve and mineral resource estimates are developed using well-established practices and with appropriate controls, mineral reserve and mineral resource estimation is an imprecise and subjective process. The accuracy of these estimates is a function of the quality of available data and of engineering and geological interpretation, judgment and experience. Assumptions about gold, silver, copper, zinc, and lead market prices are subject to great uncertainty as those prices fluctuate widely. Declines in the market prices of gold, silver, copper, zinc, or lead may render mineral reserves and mineral resources containing relatively lower grades of mineralization uneconomic to exploit, and we may be required to reduce mineral reserve and mineral resource estimates, discontinue development or mining at one or more of our properties or write down assets as impaired. Should we encounter mineralization or geologic formations at any of our mines or projects that are different from those predicted, we may adjust our mineral reserve and mineral resource estimates and alter our mining plans. No assurances can be given that all mineral reserves will be mined, as mineralized material that may qualify as reserves under applicable standards by virtue of being economic to mine may not generate attractive enough returns to be included in our mine plans, due to factors such as the impact of the gold streams at Palmarejo and Rainy River. As a result, we may elect not to mine portions of the mineralized material reported as reserves. In addition, no assurances can be given that any mineral resource estimate will ultimately be reclassified as proven or probable mineral reserves or that inferred resources will be upgraded to measured or indicated resources. Updates to our mining plans or new or updated technical or geological information may also impact anticipated metal recovery rates. Any of these adjustments may adversely affect actual operating performance, production, financial condition, results of operations and cash flows.

Current report

RISKS RELATED TO OUR OPERATIONS

Current report

Our future growth will depend upon our ability to expand existing mines and develop and start-up new mines, either through exploration at existing properties or by acquisition of other mining companies or properties.

Current report

Because mines have limited lives based on proven and probable mineral reserves, our ability to achieve significant additional growth in revenues and cash flows will depend upon our success in further developing and expanding existing properties and the opportunistic acquisition or development and start-up of exploration projects or new mining properties, such as the acquisition of mining concessions from a subsidiary of Fresnillo plc that are located adjacent to the existing Palmarejo site, the acquisition of SilverCrest Metals Inc. (“SilverCrest”) in February 2025, which operates the Las Chispas mine in Sonora, Mexico (the “SilverCrest Transaction”) and the integration of two Canadian mines, New Afton and Rainy River, as part of Coeur’s recent acquisition of New Gold Inc..

Current report

While initial development of our operating mines has been substantially completed, development work continues to expand these mines while leveraging existing infrastructure. For example, with the completion of the New Gold Transaction, work continues to progress New Afton’s K-Zone, where a maiden resource was recently declared. Likewise, work at Rainy River continues to ramp up underground mining activities and supplement existing open pit operations. Palmarejo completed open pit mining several years ago and evolved to be an underground-only operation, developing new underground mining operations. At Rochester, we completed the POA 11 expansion in 2024, which is a significant additional expansion that includes a three-stage crushing facility, a new leach pad, and a new Merrill-Crowe processing facility and related infrastructure to support the extension of Rochester’s mine life. At Kensington, we amended our operating permit in 2022 to allow for an additional 10 years of mine life by providing for expanded tailings and waste rock storage, increased mill throughput, enhanced infrastructure and other benefits (“POA 1”). We recently completed a multi-year exploration and underground mine development program to extend Kensington’s mine life. Our ability to timely complete these and future mine expansion and mine life extension projects is dependent on numerous factors, many of which are outside of our control, including, among others, availability of funding on acceptable terms, timing of receipt of permits and approvals from regulatory authorities, obtaining materials and equipment, as well as construction, engineering and other services, at favorable prices and terms, and disputes with third-party providers of materials, equipment or services. Construction services performed by contractors create a risk of delays or additional costs resulting from, among other factors: inability to negotiate contracts with favorable pricing and terms; delays in performance of the services; failure of a contractor to comply with applicable laws and regulations; termination of a contract by a contractor before completion of the services; failure by a contractor to obtain necessary equipment or materials; mismanagement by a contractor of its workforce; and insolvency or other financial difficulty encountered by a contractor which results in a delay in services or termination of a contract with the contractor. Expected benefits from the Rochester expansion are based on estimates of a variety of key factors, including mineral reserves and resources, grade, recovery rates, the ability of processing infrastructure such as the refinery to meet higher throughput rates, and operating costs among others. However, achieving results in line with those estimates is subject to risks and uncertainties such as variability in grade, recovery rates and cost inputs and any inability of infrastructure to accommodate higher throughput. We cannot provide assurance that we will be able to…

Excerpt shortened here; the source contains the full paragraph.

Current report

Further, we cannot guarantee that we will be able to successfully develop and start-up new mining properties, restart mining and processing activities at the Silvertip exploration property, integrate the operations of the New Afton and Rainy River mines, or acquire additional mining properties on favorable economic terms or at all. Moreover, as a result of the Mineral Claim Consultation Framework in British Columbia, staking and registering additional mineral claims in British Columbia may become more difficult and there is the risk that claims may not be granted or may be subject to additional requirements, which could adversely affect the Company’s ability to acquire and maintain mineral tenure, advance exploration programs and plan or finance development activities in British Columbia.

Current report

We regularly evaluate and engage in discussions or negotiations regarding acquisition opportunities. Any transactions that we contemplate or pursue would involve risks and uncertainties and would be subject to competition from other mining companies. There can be no assurance with respect to the timing, likelihood or business effect of any possible transaction.

Current report

We may be unable to successfully integrate, may not realize the expected benefits of recent or future acquisitions or may face risks associated with divestitures.

Current report

We regularly explore opportunities to selectively acquire other businesses or assets or to divest ourselves of all or part of certain assets in support of our growth plans and strategic objectives. There can be no assurance that the anticipated benefits of past acquisitions, including the SilverCrest Transaction and the recently completed New Gold Transaction, or any future acquisition, will be realized on the originally anticipated timeline or at all. The success and the ability to realize the anticipated benefits of any acquisition will depend upon our ability to effectively manage the integration, performance and operations of entities or properties we acquire. The process of managing acquired businesses or assets may involve unforeseen challenges and may require a disproportionate amount of our resources, which may divert focus and resources from other strategic opportunities and/or from operational matters during this process. As an example, the ramp up of the Silvertip exploration property, acquired in late 2017, was slower and less profitable than originally anticipated, due primarily to more significant mill availability and maintenance challenges than were anticipated at the time Silvertip was acquired, as well as deteriorating zinc and lead market conditions.

Current report

As a result of the SilverCrest Transaction, Coeur’s business expanded to include the Las Chispas mine in Sonora, Mexico. The commercial viability of the Las Chispas operation is dependent on various elements, including mining and processing costs, deposit characteristics such as size, grade, and infrastructure accessibility, as well as the cyclical nature of metal prices and governmental regulations. Factors such as weather events, permit issues, infrastructure failures, and community-related concerns also pose threats to Las Chispas. While the precise impact of these factors is uncertain, their convergence may render the Las Chispas mine economically unfeasible, potentially leading to closure.

Current report

Further, with the completion of the New Gold Transaction, Coeur’s presence in Canada has grown with the two Canadian operations of the New Afton gold-copper mine and Rainy River gold mine. Integration of New Gold and these operations is a complex process that includes strategic decisions on, among other factors, business strategy, staffing and system integration. The combined company’s performance may be adversely impacted if post-closing integration efforts are not able to be achieved in a timely manner or if the efficiencies and benefits contemplated are not able to be realized. Additionally, management focus on integration matters could result in less attention on the Company’s existing operations that could impact the performance of the Company’s existing business. Further, the commercial viability of each operation depends on several factors, including but not limited to, metal prices, operating costs, the accuracy of mineral reserve and mineral resource estimates, the ability to achieve and maintain production rates and governmental regulations.

Current report

In addition to the above, any acquisition would be accompanied by risks, including:

Current report

•a significant change in macroeconomic conditions, including commodity prices, treatment and refining charges or stock prices after we have committed to complete the transaction and established the purchase price or exchange ratio;

Current report

•additional debt incurred or issued to fund some or all of acquisition consideration, resulting in increased interest expense and other borrowing costs;

Current report

•issuance of equity securities as acquisition consideration (which occurred in the SilverCrest Transaction and the New Gold Transaction), resulting in ownership dilution of our existing stockholders;

Current report

•a material ore body may prove to be below our expectations;

Current report

•processing facilities may not operate as well as anticipated, and may require significant maintenance, downtime and capital investment, as was the case with the original mill at Silvertip;

Current report

•difficulties integrating and assimilating the operations and personnel of any acquired companies and supporting expanded operations, realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization;

Current report

•difficulties or loss of social license to operate resulting from failure of efforts to establish positive relationships and/or agreements with local communities or local indigenous peoples; and

Current report

•the acquired business or assets may have significant liabilities, such as environmental liabilities, or significant capital expenditures that we failed to discover or have underestimated.

Current report

We cannot predict the impact of future acquisitions on the price of our common stock or ensure that we will be able to obtain necessary acquisition or development financing on acceptable terms or at all. Unprofitable acquisitions, or additional liabilities, indebtedness or issuances of securities in connection with such acquisitions or any future mine development, may negatively affect our results of operations.

Current report

In connection with dispositions, the Company may provide representations, warranties and indemnities customary for such transactions. There is a risk that the Company may incur liability in the future associated with assets it no longer owns or in which it has a reduced interest.

Current report

Our operations outside the United States also expose us to economic and operational risks.

Current report

Our operations outside the United States also expose us to economic and operational risks. Local economic conditions, as well as epidemics, pandemics or natural disasters, can cause shortages of skilled workers and supplies, increase costs and adversely affect the security of operations. In addition, higher incidences of criminal activity and violence in the area of some of our foreign operations, including drug cartel-related violence in Mexico, could adversely affect our ability to operate in an optimal fashion and may impose greater risks of extortion and theft, greater risks to our personnel and property, greater risks to the transport of materials to refineries, and greater risks to the supply of services and goods to our operations, including specialized equipment. These conditions, including security concerns in certain communities surrounding the Palmarejo complex impacting third-party deliveries of supplies to Palmarejo, could adversely impact our operations and lead to lower productivity and higher costs, which would adversely affect results of operations and cash flows.

Current report

In addition, acts of civil disobedience are not uncommon in certain areas of Mexico where our operations or projects are located. In recent years, many mining companies have been the targets of actions to restrict their legally entitled access to mining concessions or property. Such acts of civil disobedience often occur without warning and can result in significant direct and indirect costs. We cannot provide assurance that there will be no disruptions to site access in the future, which could adversely affect our business.

Current report

We sell gold doré, gold concentrate, silver doré, silver concentrate and copper concentrate, in U.S. dollars, but we conduct certain operations outside the United States in local currency. Currency exchange movements could also adversely affect our results of operations.

Current report

Our mining assets are subject to geotechnical and hydrological risks, and a related incident could materially and adversely impact our production, profitability and financial condition, as well as the value of our common stock.

Current report

Our mining assets are subject to geotechnical and hydrological risks which could impact the structural integrity of our mines, stockpiles, leach pads and tailings storage facilities. No assurances can be given that unanticipated adverse geotechnical and hydrological conditions, such as landslides, pit wall failures, underground cave-ins, fracturing, convergence, subsidence or tailings dam instability will not occur in the future or that such events will be detected in advance. Geotechnical and hydrological instabilities can be difficult to predict and are often affected by risks and hazards outside of our control, such as severe weather and considerable rainfall, which may lead to periodic floods, mudslides, wall instability and seismic activity, which may result in slippage of material. The occurrence of significant leach pad failures at third-party sites in recent years may result in the introduction of additional laws and regulations, which could result in additional operational and compliance costs for our sites. Some of these risks may be heightened further by the remote location of our operations.

Current report

Waste rock in the form of tailings generated as a by-product of processed ore is produced at the Kensington, New Afton, Palmarejo and Rainy River mines. We place tailings into engineered containments, underground as structural backfill, and as thickened tailings into a former open pit. In response to several recent tailings facility failures at third-party operations that have involved loss of life and resulted in severe property and environmental ecosystem damage, we completed a comprehensive review of our tailings facilities and operational practices to characterize our risk profile. We concluded that our tailings facilities represent a low exposure risk profile for several reasons, including that our tailings facilities were constructed using construction methods recognized in the industry as the most stable tailings facility design using high strength and chemically stable rock in construction. Our facilities are continuously monitored and inspected by internal resources as well as third-party industry qualified experts. The significant dam failure events at third-party locations that have occurred in recent years may lead to regulatory governance changes stemming from updated laws, regulation or guidance, which could result in increased operational and compliance costs if we need to make changes to existing facilities. The failure of a tailings facility at one of our mine sites could result in severe, and in some cases catastrophic, property and environmental damage and loss of life. Geotechnical or hydrological failures could result in limited or restricted access to mine sites, suspension of operations, government investigations, fines and penalties, lawsuits filed by parties who suffer injuries or property damage from such events, increased monitoring costs, remediation costs, loss of mineral reserves and resources and other impacts, which could have a material adverse effect on our results of operations and financial position as well as the value of our common stock.

Current report

Our estimates of future production, costs, expenditures and financial results are imprecise, depend upon subjective factors, may not be realized in actual production and such estimates speak only as of their respective dates.

Current report

We have in the past, and may in the future, provide estimates and projections of our future production, costs, expenditures and financial results. Any such information is forward-looking. Neither our independent registered public accounting firm nor any other independent expert or outside party compiles or examines these forward-looking statements and, accordingly, do not express any opinion or any other form of assurance on these estimates and projections. Estimates and projections are made by our management and technical personnel and are qualified by, and subject to the assumptions contained or referenced in the filing, release or presentation in which they are made, including assumptions about the availability, accessibility, sufficiency and quality of mineralization, recovery rates, our costs of production, the market prices of gold and silver, and copper, our ability to sustain and increase production levels, the ability to produce and sell marketable concentrates and dorés and related treatment and refining charges, the sufficiency of our infrastructure, the performance of our personnel and equipment, our ability to maintain and obtain mining interests and permits, the state of government and community relations, and our compliance with existing and future laws and regulations. We sometimes state possible outcomes as high and low ranges which are intended to provide a sensitivity analysis as variables are changed but are not intended to represent that actual results could not fall outside of the suggested ranges. Actual results and experience may differ materially from these assumptions. Any production, cost, expenditure or financial results estimates speak only as of the date on which they are made, and we disclaim any intent or obligation to update such estimates, whether as a result of new information, future events or otherwise. Accordingly, these forward-looking statements should be considered in the context in which they are made, and undue reliance should not be placed on them.

Current report

Our use of derivative contracts to protect against market price volatility exposes us to risk of opportunity loss, mark-to-market fair value adjustments, potential cash collateral calls and exposure to counterparty credit risk.

Current report

We have in the past, and may in the future, enter into price risk management contracts to protect against fluctuations in the price of gold, and silver, and copper, foreign currency rates and changes in the prices of fuel and other input costs. These contracts could include forward sales or purchase contracts, futures contracts, purchased or sold put and call options and other derivative instruments. We entered into price risk management contracts on certain gold and silver sales in 2021, 2022, 2023 and 2024. We determined to implement these contracts to provide for a minimum level of revenue from the sales of the covered gold and silver ounces in order to mitigate the risk of not being able to fund all or a portion of the costs of several significant projects at our existing operations, such as the Rochester expansion, as well as provide greater certainty in our planning and budgeting process. The Company acquired existing zero cost collar hedges for 1,600 ounces of gold and 200,000 ounces of silver on February 14, 2025 as part of the SilverCrest Transaction. These hedges settled monthly through March 2025. As of December 31, 2025, no forward contracts remained outstanding. See Note 14 — Derivative Financial Instruments & Hedging Activities in the notes to the Consolidated Financial Statements.

Showing the first 40 of 67 passages. Open the source sections for the rest.

Reworded paragraphs (1)

Previous wording

Item 1A -- Risk Factors of the 2024 10-K sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors have been supplemented and updated in the Company’s Form 10-Q for the quarter ended March 31, 2025 (the “Q1 2025 10-Q”) and in the Company’s Form 10-Q for the quarter ended June 30, 2025 (the “Q2 2025 10-Q”). Except as supplemented and updated in the Q1 2025 10-Q and Q2 2025 10-Q, the risk factors set forth in the 2024 10-K remain current. Additional risks and uncertainties that the Company does not presently know about or that it currently deems immaterial also may impair our business operations.

Current wording

Item 1A– Risk factors of the 2025 10-K sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial conditions or operating results. Those risk factors have been supplemented and updated in this Form 10-Q. Except as supplemented and updated below, the risk factors set forth in the most recent Form 10-K remain current. Additional risks and uncertainties that the Company does not presently know or that it currently deems immaterial also may impair our business operations.