FY2024 · Filed Feb 18, 2025

CEG$267.76-3.0%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits
Contents

Liquidity and Capital Resources

For discussion of the year ended December 31, 2023 compared to the year ended December 31, 2022, refer to Liquidity and Capital Resources of MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS in the 2023 Form 10-K which was filed with the SEC on February 27, 2024.

All results included throughout the liquidity and capital resources section are presented on a GAAP basis.

Our operating and capital expenditures requirements are provided by internally generated cash flows from operations, the sale of certain receivables, as well as funds from external sources in the capital markets and through bank borrowings. Our business is capital intensive and requires considerable capital resources. We annually evaluate our financing plan and credit line sizing, focusing on maintaining our investment grade ratings while meeting our cash needs to fund capital requirements, including construction expenditures, retire debt, pay dividends, fund pension and OPEB obligations, and invest in new and existing ventures. A broad spectrum of financing alternatives beyond the core financing options can be used to meet our needs and fund growth, including monetizing assets in the portfolio via project financing, asset sales, and the use of other financing structures (e.g., joint ventures, minority partners, etc.). Our access to external financing on reasonable terms depends on our credit ratings and current overall capital market business conditions. If these conditions deteriorate to the extent that we no longer have access to the capital markets at reasonable terms, we have access to credit facilities with aggregate bank commitments of $9 billion. We utilize our credit facilities to support our commercial paper programs, provide for other short-term borrowings and to issue letters of credit. See the “Credit Matters and Cash Requirements” section below for additional information. We expect cash flows to be sufficient to meet operating expenses, financing costs, and capital expenditure requirements. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Cash Flows from Operating Activities

Our cash flows from operating activities include the sale of energy, energy-related products, and sustainable solutions, as well as sales of nuclear PTCs. Our future cash flows from operating activities may be affected by future demand for, and market prices of, energy and our ability to continue to produce and supply power at competitive costs, as well as to obtain collections from customers.

The following table provides a summary of the change in cash flows from operating activities for the years ended December 31, 2024 and 2023:

For the Years Ended December 31,
Cash flows from operating activities20242023$ Change
Net income (loss)$3,738$1,577$2,161
Adjustments to reconcile net income (loss) to cash:
Collateral received (posted), net1,803(1,491)3,294
Option premiums received (paid), net21626190
Pension and non-pension postretirement benefit contributions(184)(54)(130)
Changes in working capital and other noncurrent assets and liabilities(a)(9,168)(8,355)(813)
Total non-cash operating activities(b)1,1312,996(1,865)
Net cash flows provided by (used in) operating activities$(2,464)$(5,301)$2,837

(a)Includes changes in Accounts receivable, Inventories, Accounts payable and accrued expenses, Income taxes, and Other assets and liabilities.

(b)See the Consolidated Statements of Cash Flows for details of non-cash operating activities, includes Depreciation, amortization, and accretion, Asset impairments, Gain on sale of assets and businesses, Deferred income taxes and amortization of ITCs, Net fair value changes related to derivatives, and Net realized and unrealized activity associated with NDTs and equity investments. See Note 22 — Supplemental Financial Information of the Combined Notes to Consolidated Financial Statements for additional information on the Other non-cash operating activities line.

Changes in our cash flows from operations were generally consistent with changes in results of operations, as adjusted by changes in working capital in the normal course of business, except as discussed below. Significant operating cash flow impacts for 2024 and 2023 were as follows:

In 2024, $1,570 million of cash was received related to the sale of nuclear PTCs. See Note 6 — Government Assistance of the Combined Notes to Consolidated Financial Statements for additional information.

Depending upon whether we are in a net mark-to-market liability or asset position, collateralmay be required to be posted with or collected from our counterparties, respectively. In addition, the collateral posting and collection requirements differ depending on whether the transactions are on an exchange or in the over-the-counter markets. See Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on collateral.

Option premiums received (paid), net relate to options contracts that we purchase and sell as part of our established policies and procedures to manage risks associated with market fluctuations in commodity prices. Note 15 — Derivative Financial Instruments of the Combined Notes to Consolidated Financial Statements for additional information on derivative contracts.

Increase in cash outflows forpension and non-pension postretirement benefit contributions is primarily due to our annual qualified pension contribution of $161 million and $21 million made in February 2024 and July 2023, respectively. See Note 14 — Retirement Benefits of the Combined Notes to Consolidated Financial Statements for additional information on pension and non-pension postretirement benefit plans.

A net increase in cash outflows forchanges in working capital and other noncurrent assets and liabilities primarily driven by an increase in cash collections applied to the Deferred Purchase Price (DPP) partially offset by an increase in liabilities associated with state-sponsored programs requiring refund or pass through of the nuclear PTC, as well as price changes related to natural gas purchases in 2024. See Note 7 — Accounts Receivable of the Combined Notes to Consolidated Financial Statements for additional information on the sales of customer accounts receivable.

Cash Flows from Investing Activities

The following table provides a summary of the change in cash flows from investing activities for the years ended December 31, 2024 and 2023:

For the Years Ended December 31,
Cash flows from investing activities20242023$ Change
Collection of DPP, net$10,217$7,340$2,877
Acquisitions of assets and businesses(32)(1,690)1,658
Investment in NDT funds, net(277)(228)(49)
Capital expenditures(2,565)(2,422)(143)
Other investing activities853154
Net cash flows provided by (used in) investing activities$7,428$3,031$4,397

Significant investing cash flow impacts for 2024 and 2023 were as follows:

Collection of DPP, net increased primarily due to the increased cash collections applied to DPP as a result of a decrease in the drawn Facility balance in 2024 compared to 2023. In addition, more cash collections were reinvested in the Facility in 2024. See Note 7 — Accounts Receivable of the Combined Notes to Consolidated Financial Statements for additional information.

See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information related to the STPacquisitionin November 2023.

Variances incapital expenditures are primarily due to the timing of cash payments for capital projects. See the "Credit Matters and Cash Requirements" section below for additional information on projected capital expenditure spending.

Cash Flows from Financing Activities

The following table provides a summary of the change in cash flows from financing activities for the years ended December 31, 2024 and 2023:

For the Years Ended December 31,
Cash flows from financing activities20242023$ Change
Long-term debt, net$799$3,027$(2,228)
Changes in short-term borrowings, net(1,644)485(2,129)
Dividends paid on common stock(444)(366)(78)
Repurchases of common stock(999)(992)(7)
Other financing activities(1)42(43)
Net cash flows provided by (used in) financing activities$(2,289)$2,196$(4,485)

Significant financing cash flow impacts for 2024 and 2023 were as follows:

Long-term debt, net varies due to debt issuances and redemptions each year. Refer to the Debt Issuances and Redemptions tables below for additional information.

Changes in short-term borrowings, net is driven by repayments on and issuances of notes due in less than 365 days. Refer to Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Refer to ITEM 5. — MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES for additional information on dividends. See below for quarterly dividends declared.

Repurchases of common stock is related to our share repurchase program that commenced in March 2023. See Note 19 — Shareholders' Equity of the Combined Notes to Consolidated Financial Statements for additional information.

Debt Issuances and Redemptions

See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on our long-term debt. Debt activity for 2024 and 2023 was as follows:

During 2024, the following long-term debt was issued (redeemed):

TypeInterest RateMaturityAmount
Green Senior Notes(a)5.75%March 2054$900
Energy Efficiency Project Financing(b)2.20% - 5.51%March 2025 - April 202821
CR Nonrecourse Debt3-month SOFR + 2.25% (c)December 2027(22)
Continental Wind Nonrecourse Debt6.00%February 2033(28)
West Medway II Nonrecourse Debt1-month SOFR + 3.225%March 2026(36)
Antelope Valley DOE Nonrecourse Debt2.29% - 3.56%January 2037(26)
RPG Nonrecourse Debt4.11%March 2035(9)
Total long-term debt issued (redeemed)$800

(a)The Green Senior Notes were issued to finance or refinance, in whole or in part, one or more new or existing Eligible Projects. Eligible Projects are defined as investments and expenditures made by us in the 24 months prior to or after the issuance of the notes within the following eligible green categories: clean generation fleet, clean hydrogen, energy storage, and clean commercial offerings.

(b)Energy Efficiency Project Financing represents funding to install energy conservation measures. The maturity dates represent the expected date of project completion, upon which the respective customer assumes the outstanding debt.

(c)The interest rate for long-term debt redemptions prior to July 2024 were based on SOFR + 2.76%. Beginning in July 2024 these redemptions are based on SOFR + 2.25%.

During 2023, the following long-term debt was issued (redeemed):

TypeInterest RateMaturityAmount
2053 Senior Notes6.50%October 2053$900
2028 Senior Notes5.60%March 2028750
2033 Senior Notes5.80%March 2033600
2034 Senior Notes6.13%January 2034500
Tax-Exempt Notes Reoffering4.10% - 4.45%2025 - 2053(a)435
Energy Efficiency Project Financing(b)2.20% - 4.96%March 2024 - June 202411
Energy Efficiency Project Financing2.44% - 6.96%May 2023 - March 2024(44)
CR Nonrecourse Debt3-month SOFR + 2.76%(c)December 2027(39)
West Medway II Nonrecourse Debt1-month SOFR + 2.975% - 3.225%(d)(e)March 2026(26)
Continental Wind Nonrecourse Debt6.00%February 2033(25)
Antelope Valley DOE Nonrecourse Debt2.29% - 3.56%January 2037(25)
RPG Nonrecourse Debt4.11%March 2035(9)
Total long-term debt issued (redeemed)$3,028

(a)The Tax-exempt notes have a maturity date of March 2025 - April 2053, and a mandatory purchase date that ranges from March 2025 - June 2029.

(b)For Energy Efficiency Project Financing, the maturity dates represent the expected date of project completion, upon which the respective customer assumes the outstanding debt.

(c)The interest rate for long-term debt redemptions prior to June 2023 were based on LIBOR + 2.50%. Beginning in June 2023, these redemptions are based on SOFR + 2.76%. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on the CR nonrecourse debt.

(d)The interest rate for long-term debt redemptions prior to May 2023 were based on LIBOR + 2.875%. Beginning in May 2023, these redemptions are based on SOFR + the variable interest rate of 2.975% - 3.225%. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on the West Medway II nonrecourse debt.

(e)The nonrecourse debt has an average blended interest rate.

Dividends

Quarterly dividends declared by our Board of Directors during 2024 and for the first quarter of 2025 were as follows:

PeriodDeclaration DateShareholder of Record DateDividend Payable DateCash per Share
First Quarter of 2024February 26, 2024March 8, 2024March 19, 2024$0.3525
Second Quarter of 2024May 1, 2024May 29, 2024June 10, 2024$0.3525
Third Quarter of 2024July 30, 2024August 12, 2024September 6, 2024$0.3525
Fourth Quarter of 2024November 1, 2024November 15, 2024December 6, 2024$0.3525
First Quarter of 2025February 18, 2025March 7, 2025March 18, 2025$0.3878

Credit Matters and Cash Requirements

We fund liquidity needs for capital expenditures, working capital, energy hedging and other financial commitments through cash flows from operations, public debt offerings, commercial paper markets and large, diversified credit facilities. As of December 31, 2024, we have access to facilities with aggregate bank commitments of $9 billion. We had access to the commercial paper markets and had availability under our revolving credit facilities during 2024 to fund our short-term liquidity needs, when necessary. We routinely review the sufficiency of our liquidity position, including appropriate sizing of credit facility commitments, by performing various stress test scenarios, such as commodity price movements, increases in margin-related transactions, changes in hedging levels, and the impacts of hypothetical credit downgrades. We closely monitor events in the financial markets and the financial institutions associated with the credit facilities, including monitoring credit ratings and outlooks, credit default swap levels, capital raising, and merger activity. See PART I, ITEM 1A. RISK FACTORS for additional information regarding the effects of uncertainty in the capital and credit markets.

We believe our cash flow from operating activities, access to credit markets and our credit facilities provide sufficient liquidity to support the estimated future cash requirements discussed below, including the cash consideration necessary to close on our proposed acquisition of Calpine. See Note 2 — Mergers, Acquisitions, and Dispositions of the Combined Notes to Consolidated Financial Statements for additional information.

Security Ratings

Our access to the capital markets, including the commercial paper market, and our financing costs in those markets, may depend on our securities ratings. A loss of investment grade credit rating would have required a three-notch downgrade by S&P or Moody's from their current levels as of December 31, 2024 of BBB+ and Baa1, to BB+ and Ba1 or below, respectively. As of December 31, 2024, we had $6.7 billion of available capacity under our credit facilities and $3 billion of cash on hand. In the event of a credit downgrade below investment grade and a resulting requirement to provide incremental collateral exceeding available capacity under our credit facilities and cash on hand, we would be required to access additional liquidity through the capital markets. Our borrowings are not subject to default or prepayment as a result of a downgrade of our securities, although such a downgrade could increase fees and interest charges under our credit agreements. Our credit ratings were affirmed following the announcement of our proposed acquisition of Calpine.

If we had lost our investment grade credit ratings as of December 31, 2024, we would have been required to provide incremental collateral estimated to be approximately $1.9 billion to meet collateral obligations for derivatives, non-derivatives, NPNS, and applicable payables and receivables, net of the contractual right of offset under master netting agreements.

See Note 15 — Derivative Financial Instruments and Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Capital Expenditures

Our most recent estimate of capital expenditures is approximately $3 billion and $3.5 billion for 2025 and 2026, respectively. Approximately 35% of projected capital expenditures are for the acquisition of nuclear fuel, which includes additional nuclear fuel to increase inventory levels in response to the potential for the continuing Russia and Ukraine conflict to impact our long-term nuclear fuel supply. Additionally, the above estimates of capital expenditures includes $1.7 billion of growth capital expenditures, including our planned restart of Crane, nuclear uprates, behind-the-meter infrastructure, and license renewals. The remaining amounts primarily reflect additions and upgrades to existing generation facilities (including material condition improvements during nuclear refueling outages). See ITEM 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, Other Key Business Drivers for more information on the Russia and Ukraine conflict.

Planned additions and upgrades and other investments are subject to periodic review and revision to reflect changes in economic conditions impacting our generating assets and other factors, including, but not limited to, market power prices, results of capacity auctions, potential legislative and regulatory actions, impacts of inflation, changes in the cost of materials and labor, and financing costs.

We anticipate funding these capital expenditures with a combination of internally generated funds and borrowings.

Pension and Other Postretirement Benefits

We consider various factors when making qualified pension funding decisions, including actuarially determined minimum contribution requirements under ERISA, contributions required to avoid benefit restrictions and at-risk status as defined by the Pension Protection Act, and management of the pension obligation. The Pension Protection Act requires the attainment of certain funding levels to avoid benefit restrictions (such as an inability to pay lump sums or to accrue benefits prospectively) and at-risk status (which triggers higher minimum contribution requirements and participant notification). The contributions in the table below reflect a funding strategy to make levelized annual contributions to offset the growth of the liability. Unlike the qualified pension plans, our non-qualified pension plans are not subject to statutory minimum contribution requirements.

OPEB plans are also not subject to statutory minimum contribution requirements, though we have funded a portion of our plans. Annually, we evaluate whether additional funding for those plans is needed.

Expected contributions in 2025 or future years could be affected by adjustments in our pension and OPEB funding strategy, market conditions, or pension regulation changes. See Note 14 — Retirement Benefits of the Combined Notes to Consolidated Financial Statements for additional information on pension and OPEB contributions.

Cash Requirements for Other Financial Commitments

The following table summarizes our projected cash payments as of December 31, 2024 under existing financial commitments with fixed or minimum payments required:

2025Beyond 2025TotalTime Period
Long-term debt$1,028$7,446$8,4742025 - 2054
Interest payments on long-term debt(a)4385,8056,2432025 - 2054
Operating leases(b)584094672025 - 2056
Purchase power obligations(c)8911,0561,9472025 - 2036
Fuel purchase agreements(d)1,3818,63010,0112025 - 2040
Other purchase obligations(e)1,4001,9923,3922025 - 2057
SNF obligation—1,3661,3662025 - 2040
Pension contributions(f)1637018642025 - 2030
Total cash requirements$5,359$27,405$32,764

(a)Interest payments are estimated based on final maturity dates of debt securities outstanding at December 31, 2024 and do not reflect anticipated future refinancing, early redemptions, or debt issuances. Variable rate interest obligations are estimated based on rates as of December 31, 2024.

(b)Capacity payments associated with contracted generation lease agreements are net of sublease and capacity offsets of $47 million and $230 million for 2025 and beyond 2025, respectively and $277 million in total.

(c)Purchase power obligations primarily include expected payments for REC purchases and capacity payments associated with contracted generation agreements, which may be reduced based on plant availability. Expected payments exclude payments on renewable generation contracts that are contingent in nature.

(d)Represents commitments to purchase nuclear fuel and related services and natural gas-related transportation and capacity.

(e)Represents the future estimated value at December 31, 2024 of the cash flows associated with all contracts, both cancellable and non-cancellable, entered into with third parties for the provision of services and materials, entered into in the normal course of business not specifically reflected elsewhere in this table. These estimates are subject to significant variability from period to period.

(f)These amounts represent our expected contributions to our qualified pension plans.

See Note 18 — Commitments and Contingencies of the Combined Notes to Consolidated Financial Statements for additional information of our other commitments potentially triggered by future events. Additionally, see below for where to find additional information regarding the financial commitments in the table above in the Combined Notes to Consolidated Financial Statements.

ItemLocation within Combined Notes to Consolidated Financial Statements
Long-term debtNote 16 — Debt and Credit Agreements
Interest payments on long-term debtNote 16 — Debt and Credit Agreements
Operating leasesNote 11 — Leases
SNF obligationNote 18 — Commitments and Contingencies
Pension contributionsNote 14 — Retirement Benefits

Sales of Customer Accounts Receivable

We had an accounts receivable financing facility with a number of financial institutions and a commercial paper conduit to sell certain receivables. The facility was amended effective December 31, 2024 resulting in an increased funding limit secured by certain receivables. See Note 7 — Accounts Receivable and Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.

Project Financing

Project financing is based upon a nonrecourse financial structure, in which project debt is paid back from the cash generated by a specific asset or portfolio of assets. Borrowings under these agreements are secured by the assets and equity of each respective project. Lenders do not have recourse against us in the event of a default. If a project financing entity does not maintain compliance with its specific debt covenants, there could be a requirement to accelerate repayment of the associated debt or other project-related borrowings earlier than the stated maturity dates. In these instances, if such repayment were not satisfied, or restructured, the lenders or security holders would generally have rights to foreclose against the project-specific assets and related collateral. The potential requirement to repay the debt or other borrowings earlier than otherwise anticipated could lead to impairments due to a higher likelihood of disposing of the respective project-specific assets significantly before the end of their useful lives. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on project finance credit facilities and nonrecourse debt.

Credit Facilities

We meet our short-term liquidity requirements primarily through the issuance of commercial paper. We may use our credit facilities for general corporate purposes, including meeting short-term funding requirements and the issuance of letters of credit. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information on our credit facilities.

Capital Structure

At December 31, 2024, our capital structure consisted of the following:

Percentage of Capital Structure
Long-term debt38%
Member’s equity62%

NRC Minimum Funding Requirements

NRC regulations require that licensees of nuclear generating facilities demonstrate reasonable assurance that sufficient funds will be available in certain minimum amounts for radiological decommissioning of the facility. These NRC minimum funding levels are typically based upon the assumption that decommissioning activities will commence after the end of the current licensed life of each unit. If a unit fails the NRC minimum funding test, then the plant’s owners or parent companies would be required to take steps, such as providing financial guarantees through surety bonds, letters of credit, or parent company guarantees or making additional cash contributions to the NDT fund to ensure sufficient funds are available. See Note 10 — Asset Retirement Obligations of the Combined Notes to Consolidated Financial Statements for additional information.

If a nuclear plant were to retire before the end of its licensed life, there is a risk that it will no longer meet the NRC minimum funding requirements due to the earlier commencement of decommissioning activities and a shorter time period over which the NDT funds could appreciate in value. A shortfall could require that we address the shortfall by providing additional financial assurances, such as surety bonds, letters of credit, or parent company guarantees for our share of the funding assurance. However, the amount of any assurance will ultimately depend on the decommissioning approach, the associated level of costs, and the NDT fund investment performance going forward. No later than two years after shutting down a plant, we must submit a Post-shutdown Decommissioning Activities Report (PSDAR) to the NRC that includes the planned option for decommissioning the site.

Upon issuance of any additional financial assurance mechanisms to address a decommissioning funding shortfall, subject to satisfying various regulatory preconditions, each site would be able to utilize the respective NDT funds for radiological decommissioning costs, which represent the majority of the total expected decommissioning costs. However, under the regulations, the NRC must approve an exemption in order for us to utilize the NDT funds to pay for non-radiological decommissioning costs (i.e., spent fuel management and site restoration costs, if applicable). Any amounts not covered by an exemption would be borne by us without reimbursement.

As of December 31, 2024, the Crane NDT is fully funded under the SAFSTOR scenario that was the planned decommissioning option, as described in the Crane PSDAR filed with the NRC in April 2019. We will continue to file Crane's decommissioning funding status with the NRC annually until restart, at which point we will file decommissioning funding status reports in accordance with applicable NRC requirements. Additionally, as of December 31, 2024, we have adequate NDT funds for the remaining radiological decommissioning cost at Zion

Station related to the Independent Spent Fuel Storage Installation. Decommissioning costs other than radiological may require funding from us. See Note 10 — Asset Retirement Obligations of the Combined Notes to Consolidated Financial Statements for additional information.