For the period ended Dec 31, 2024. Filed Mar 28, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Mar 28, 2025
Contents
Item 1. BUSINESS*
General
Lion CG was incorporated under theCompany Act(British Columbia) on May 11, 1993, originally under the name Acquaterre Mineral Development Ltd. On November 30, 1993, the Company changed its name to Aquaterre Mineral Development Ltd. and became Quaterra Resources Inc. on November 13, 1997. On November 22, 2021, the Company changed of its name from Quaterra Resources Inc. to Lion Copper and Gold Corp.
Lion CG's domicile is British Columbia, Canada and the Company operates under theBusiness Corporations Act (British Columbia).
The Company's registered and records offices are located at Suite 1200 - 750 West Pender Street, Vancouver, British Columbia, Canada, V6C 2T8. The Company's head office is located at 143 South Nevada Street, Yerington, NV, 89447.
We make available, free of charge, on or through our Internet website, at www.lioncg.com, our Annual Report on Form 10-K, our quarterly reports on Form 10-Q and our current reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act. Our Internet website and the information contained therein or connected thereto are not intended to be, and are not incorporated into this Annual Report on Form 10-K.
Since our incorporation, substantially all our capital has been deployed to the development of our exploration stage business. We have not undertaken any material mergers or acquisitions other than in the ordinary course of business. There have been no public takeover offers by third parties with respect to our shares and we have made no public takeover offers with respect to another company's shares.
Intercorporate Relationships
The chart below illustrates our corporate structure on December 31, 2024, including our subsidiaries, the jurisdictions of incorporation, and the percentage of voting securities held.
| Note 1: | Quaterra Alaska, Inc. is 100% owned by Lion Copper and Gold Corp. On April 5, 2022, the Company completed the assignment of the two option agreements for the Butte Valley Property to Falcon Butte Minerals Corp ("Falcon Butte"), a private British Columbia company established to acquire mineral resource properties. |
|---|---|
| Note 2: | On December 13, 2022, Quaterra Alaska Inc., assigned and transferred 100% of its outstanding interest in Blue Copper LLC, which holds the Groundhog property, the Butte Valley Royalty, and an interest in the Nieves project, to Blue Copper Resources Corp. As consideration, on the date of transfer of assets to Blue Copper Resources Corp, Quaterra Alaska was issued 57,513,764 common shares of Blue Copper Resources Corp which represented 79.3% of all issued and outstanding shares at December 13, 2022 and December 31, 2022. Blue Copper Resources Corp was renamed to Falcon Copper Corp on October 6, 2023. |
| Note 3: | On October 4, 2021, Blue Copper LLC was incorporated in the state of Montana, USA. Blue Copper LLC acquired and staked a district scale exploration and resource discovery opportunity (the "Blue Copper Prospect", or "Blue Copper Project"), comprising more than 7,430 acres in Powell County and Lewis & Clark County in Montana, USA. |
|---|---|
| Note 4: | On March 30, 2022, Six Mile Mining Company, a 100% wholly owned subsidiary of the Company, was dissolved and its assets were transferred to Quaterra Alaska Inc. which is a 100% wholly owned subsidiary of the Company. |
Business Operations
Company Summary
The Company is a mineral exploration company engaged in the acquisition, exploration and development of copper projects currently in Nevada and Montana in the United States. The amounts shown as mineral properties represent acquisition costs incurred to date, less amounts recovered and/or written off, and do not necessarily represent present or future values. The underlying value of mineral properties and related capitalized costs are dependent on the existence of economically recoverable reserves, securing and maintaining title and beneficial interest in the properties, and obtaining necessary financing.
The Company is an exploration stage issuer as defined in S-K 1300. Under S-K 1300, a mining company can be classified as an exploration stage issuer, a development stage issuer, or a production stage issuer. To be classified as a development stage issuer or production stage issuer, a company must have established Mineral Reserves, and the Company has not established Mineral Reserves on any of its mineral properties.
The Company's only material property is the Yerington Copper Project located in Nevada.
For more information about our mineral properties, please refer to*"ITEM 2. PROPERTIES" below.*
Seasonality
The Company's business operations, including exploration of the Yerington Copper Project, are not subject to material restrictions on our operations due to seasonality.
Copper Price History
Copper is a critical industrial metal used extensively in construction, electrical systems, and manufacturing. Its price is subject to significant volatility drive by global supply and demand dynamics, geopolitical developments, and commodity market speculation.
Over the past decade, copper prices have exhibited considerable fluctuation. Following a sharp decline during the 2008 global financial crisis, prices rebounded in 2009, supported by rising demand from emerging economics. However, prices subsequently declined, reflecting slower economic growth and uncertainty in key consuming regions.
More recently, copper prices have experienced a renewed upward trend. In 2021 and 2022, prices reached multi-year highs, driven by global supply chain disruptions and inflationary pressures. Additionally, the increased use of copper in electric vehicles, renewable power systems, and energy infrastructure has contributed to stronger long-term demand fundamentals.
Competitive Conditions
The Company competes with other mining companies in the recruitment and retention of qualified managerial and technical employees, for supplies and equipment, as well as for capital. As a result of this competition in the mining industry, some of which is with large established mining companies holding substantial capabilities and with greater financial and technical resources than ours, we may be unable to effectively develop and operate mines or obtain financing on terms we consider acceptable.
Governmental Regulations and Environmental Laws
The exploration and development of a mining property is subject to regulation by a number of federal and state government authorities. These include the United States Environmental Protection Agency ("EPA") and the United States Bureau of Land Management ("BLM") as well as the various state environmental protection agencies. The regulations address many environmental issues relating to air, soil and water contamination and apply to many mining related activities including exploration, mine construction, mineral extraction, ore milling, water use, waste disposal and use of toxic substances. In addition, we are subject to regulations relating to labor standards, occupational health and safety, mine safety, general land use, export of minerals and taxation. Many of the regulations require permits or licenses to be obtained and the filing of Notices of Intent and Plans of Operations, the absence of which or inability to obtain will adversely affect the ability for us to conduct our exploration, development and operation activities. The failure to comply with the regulations and terms of permits and licenses may result in fines or other penalties or in revocation of a permit or license or loss of a prospect.
Federal
On lands owned by the United States, mining rights are governed by the General Mining Law of 1872, as amended, which allows the location of mining claims on certain federal lands upon the discovery of a valuable mineral deposit and compliance with location requirements. The exploration of mining properties and development and operation of mines is governed by both federal and state laws. Federal laws that govern mining claim location and maintenance and mining operations on federal lands are generally administered by the BLM. Additional federal laws, governing mine safety and health, also apply. State laws also require various permits and approvals before exploration, development or production operations can begin. Among other things, a reclamation plan must typically be prepared and approved, with bonding in the amount of projected reclamation costs. The bond is used to ensure that proper reclamation takes place, and the bond will not be released until that time. Local jurisdictions may also impose permitting requirements (such as conditional use permits or zoning approvals).
Nevada
In Nevada, initial stage surface exploration activities that do not disturb the surface, do not require any permits. Notice-level exploration permits (“NOI”) are required (through the BLM) for the MacArthur Mine Propertyand portions of the Yerington Mine Property to perform drilling or other surface disturbing activities with less than five acres extent. More extensive disturbance requires submittal and approval of a “Plan of Operations” and either an “Environmental Assessment” or “Environmental Impact Statement” from the BLM.
In Nevada, we are also required to post bonds with the State of Nevada to secure our environmental and reclamation obligations on private land, with amount of such bonds reflecting the level of rehabilitation anticipated by the then proposed activities.
If in the future we are successful in defining a commercially viable mineral deposit on our property interests, then if and when we commence any mineral production, we will also need to comply with laws that regulate or propose to regulate our mining activities, including the management and handling of raw materials, disposal, storage and management of hazardous and solid waste, the safety of our employees and post-mining land reclamation.
We cannot predict the impact of new or changed laws, regulations or permitting requirements, or changes in the ways that such laws, regulations or permitting requirements are enforced, interpreted or administered. Health, safety and environmental laws and regulations are complex, are subject to change and have become more stringent over time. It is possible that greater than anticipated health, safety and environmental capital expenditures or reclamation and closure expenditures will be required in the future. We expect continued government and public emphasis on environmental issues will result in increased future investments for environmental controls at our operations.
Environmental Regulation
Our mineral projects are subject to various federal, state and local laws and regulations governing protection of the environment. These laws are continually changing and, in general, are becoming more restrictive. The development, operation, closure, and reclamation of mining projects in the United States requires numerous notifications, permits, authorizations, and public agency decisions. Compliance with environmental and related laws and regulations requires us to obtain permits issued by regulatory agencies, and to file various reports and keep records of our operations. Certain of these permits require periodic renewal or review of their conditions and may be subject to a public review process during which opposition to our proposed operations may be encountered. We are currently operating under various permits for activities connected to mineral exploration, reclamation, and environmental considerations. Our policy is to conduct business in a way that safeguards public health and the environment. We believe that our operations are conducted in material compliance with applicable laws and regulations.
Changes to current local, state or federal laws and regulations in the jurisdictions where we operate could require additional capital expenditures and increased operating and/or reclamation costs. Although we are unable to predict what additional legislation, if any, might be proposed or enacted, additional regulatory requirements could impact the economics of our projects.
U.S. Federal Laws
The Comprehensive Environmental, Response, Compensation, and Liability Act ("CERCLA"), and comparable state statutes, impose strict, joint and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims requiring cleanup actions, demands for reimbursement for government-incurred cleanup costs, or natural resource damages, or for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances released into the environment. The Federal Resource Conservation and Recovery Act ("RCRA"), and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. CERCLA, RCRA and comparable state statutes can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after activities on such sites have been completed.
The Clean Air Act ("CAA"), as amended, restricts the emission of air pollutants from many sources, including exploration, development, mining and processing activities. The Company's current exploration activities and any future development, mining or processing operations by the Company may produce air emissions, including fugitive dust and other air pollutants from stationary equipment, storage facilities and the use of mobile sources such as trucks and heavy construction equipment, which are subject to review, monitoring and/or control requirements under the CAA and state air quality laws. New facilities may be required to obtain permits before development, mining and processing work can begin, and existing facilities may be required to incur capital costs in order to remain in compliance. In addition, permitting rules may impose limitations on our production levels or result in additional capital expenditures in order to comply with the rules.
The National Environmental Policy Act ("NEPA") requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. If a proposed action could significantly affect the environment, the agency must prepare a detailed statement known as an Environmental Impact Statement ("EIS"). The EPA, other federal agencies, and any interested third parties will review and comment on the scoping of the EIS and the adequacy of and findings set forth in the draft and final EIS. This process can cause delays in issuance of required permits or result in changes to a project to mitigate its potential environmental impacts, which can in turn impact the economic feasibility of a proposed project.
The Clean Water Act ("CWA"), and comparable state statutes, impose restrictions and controls on the discharge of pollutants into waters of the United States. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. The CWA regulates storm water at mining facilities and requires a storm water discharge permit for certain activities. Such a permit requires the regulated facility to monitor and sample storm water run-off from its operations. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the United States unless authorized by an appropriately issued permit. The CWA and comparable state statutes provide for civil, criminal and administrative penalties for unauthorized discharges of pollutants and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused by the release and for natural resource damages resulting from the release.
The Safe Drinking Water Act ("SDWA") and the Underground Injection Control ("UIC") program promulgated thereunder, regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in some states and in others the responsibility for the program has been delegated to the state. The program requires that a permit be obtained before drilling a disposal or injection well. Violation of these regulations and/or contamination of groundwater by exploration, development, mining, processing or other related activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SWDA and state laws. In addition, third party claims may be filed by landowners and other parties claiming damages for alternative water supplies, property damages, and bodily injury.
Nevada
Other Nevada regulations govern operating and design standards for the construction and operation of any source of air contamination and landfill operations. Any changes to these laws and regulations could have an adverse impact on our financial performance and results of operations by, for example, requiring changes to operating constraints, technical criteria, fees or surety requirements.
Employees
As of March 28, 2025, we have eight full and part time employees and approximately 50 individuals working on a part-time consulting basis. Our operations are managed by our officers with input from our directors. We engage geological, metallurgical,environmental and engineering consultants from time to time as required to assist in evaluating our property interests and recommending and conducting work programs.