Supply of Electric Power
Capacity
Ameren Missouri sells nearly all of its capacity to the MISO and purchases the capacity it needs to supply its native load sales from the MISO. In the April 2023 MISO capacity auction, Ameren Missouri’s generation resources exceeded its native load capacity requirements for the June 2023 through May 2024 period. Ameren Illinois purchases capacity from the MISO and through bilateral contracts resulting from IPA procurement events. In 2022, the FERC issued an order approving changes to the annual MISO capacity auction. Historically, the auctions were designed to cover annual peak demand plus a target reserve margin. Beginning with the April 2023 auction for the June 2023 to May 2024 planning year, auctions include four seasonal load forecasts and available capacity levels and are designed to cover each season’s peak demand plus a target reserve margin. The seasonal auction structure was established to help to address variability in resources as the MISO begins to rely more heavily on renewable generation.
Ameren Missouri’s electric supply is primarily generated from its energy centers. Factors that could cause Ameren Missouri to purchase power include, among other things, energy center outages, the fulfillment of renewable energy requirements, extreme weather conditions, the availability of power at a cost lower than its generation cost, and the lack of sufficient owned generation availability.
Ameren Missouri files a long-term nonbinding integrated resource plan with the MoPSC every three years. The most recent integrated resource plan was filed in September 2023 and includes Ameren Missouri’s preferred plan for meeting customers’ projected long-term energy needs in a manner that maintains system reliability and customer affordability while transitioning to clean energy generation in an environmentally responsible manner. The preferred plan includes, among other things, the following:
adding an 800-MW natural gas-fired simple-cycle energy center by 2027 and an additional 1,200-MW natural gas-fired combined-cycle energy center by 2033, representing investment opportunities of $0.8 billion and $1.7 billion, respectively;
adding 2,800 MWs of renewable generation by 2030, which includes the 900 MWs of solar generation projects discussed in Note 2 – Rate and Regulatory Matters under Part II, Item 8, of this report, and an additional 1,900 MWs by 2036, representing investment opportunities of $5.3 billion and $4.1 billion, respectively;
adding 400 MWs of battery storage by 2030 and an additional 400 MWs by 2035, representing investment opportunities of $0.6 billion and $0.7 billion, respectively;
adding 1,200 MWs of other clean dispatchable generation resources by 2040 and an additional 1,200 MWs by 2043;
retiring all of Ameren Missouri’s coal-fired energy centers by 2042;
accelerating the retirement date of the Rush Island coal-fired energy center from 2025 to 2024;
extending the retirement date of the Sioux coal-fired energy center from 2030 to 2032 to ensure reliability during the transition to clean energy generation, which is subject to the approval of a change in depreciable lives of the energy center’s assets by the MoPSC;
retiring 1,800 MWs of Ameren Missouri’s natural gas-fired energy centers by 2040 to comply with Illinois law;
the continued implementation of customer energy-efficiency and demand response programs; and
the expectation that Ameren Missouri will seek and receive NRC approval for an extension of the operating license for the Callaway Energy Center beyond its current 2044 expiration date.
The addition of renewable or natural gas-fired generation facilities is subject to obtaining necessary project approvals, including FERC approval and the issuance of a CCN by the MoPSC, as applicable. Ameren Missouri would be adversely affected if the MoPSC does not allow recovery of the remaining investment and decommissioning costs associated with the retirement of an energy center, as well as the ability to earn a return on that remaining investment and those decommissioning costs. In connection with the accelerated retirement of the Rush Island Energy Center, Ameren Missouri is seeking approval from the MoPSC to finance the costs associated with the retirement, including the remaining unrecovered net plant balance associated with the facility, through the issuance of securitized utility tariff bonds pursuant to the Missouri securitization statute. The next integrated resource plan is expected to be filed in September 2026.
Ameren Missouri continues to evaluate its longer-term needs for new generating capacity. The need for investment in new sources of energy is dependent on several key factors, including continuation of and customer participation in energy-efficiency programs, the amount of distributed generation from customers, load growth, technological advancements, costs of generation alternatives, environmental regulation of coal-fired and natural gas-fired power plants, and state renewable energy requirements, which could lead to the retirement of current baseload assets before the end of their current useful lives or alterations in the way those assets operate, which could result in increased capital expenditures and/or increased operations and maintenance expenses. Because of the significant time required to plan, acquire permits for, and build a baseload energy center, Ameren Missouri continues to study alternatives and to take steps to preserve options to meet future demand. Steps include evaluating the potential for further diversification of Ameren Missouri’s generation portfolio through renewable energy generation, including wind and solar generation, natural gas-fired generation, including the potential to switch to hydrogen fuel and/or blend hydrogen fuel with natural gas and install carbon capture technology, extending the operating license for the Callaway Energy Center, additional customer energy-efficiency and demand response programs, distributed energy resources, and energy storage.
Missouri law required Ameren Missouri to offer solar rebates through December 2023 and currently requires Ameren Missouri to offer net metering to certain customers that install renewable generation at their premises. The difference between the cost of the solar rebates and the amount set in base rates was deferred as a regulatory asset or liability under the RESRAM, and earn carrying costs at short-term interest rates. Customers that elect to enroll in net metering are allowed to net their generation against their distribution usage within each billing month.
In Illinois, while electric transmission and distribution service rates are regulated, power supply prices are not. Although electric customers are allowed to purchase power from an alternative retail electric supplier, Ameren Illinois is required to be the provider of last resort for its electric distribution customers. In 2023, 2022, and 2021, Ameren Illinois procured power on behalf of its customers for 28%, 28%, and 23%, respectively, of its total kilowatthour sales. Power purchased by Ameren Illinois for its electric distribution customers who do not elect to purchase their power from an alternative retail electric supplier comes either through procurement processes conducted by the IPA or through markets operated by the MISO. The IPA administers an RFP process through which Ameren Illinois procures its expected supply. The purchased power and related procurement costs incurred by Ameren Illinois are passed directly to its electric distribution customers through a cost recovery mechanism. Transmission costs are charged to customers who purchase electricity from Ameren Illinois through a cost recovery mechanism. The purchased power, power procurement, and transmission costs are reflected in Ameren Illinois Electric Distribution’s results of operations, but do not affect Ameren Illinois Electric Distribution’s earnings because these costs are offset by corresponding revenues. Ameren Illinois charges distribution service rates to electric distribution customers who purchase electricity, regardless of supplier, which does affect Ameren Illinois Electric Distribution’s earnings.
Pursuant to the CEJA, Ameren Illinois is required to file a Grid Plan with the ICC every four years. Ameren Illinois expects to file a revised Grid Plan with the ICC in March 2024 after its initial Grid Plan for the years 2023 to 2027 was rejected by the ICC’s December 2023 order in Ameren Illinois’ MYRP proceeding. For additional information regarding Ameren Illinois’ MYRP proceeding, see Note 2 – Rate and Regulatory Matters under Part II, Item 8, of this report. The Grid Plan outlines how Ameren Illinois expects to invest in electric distribution infrastructure in order to support grid modernization, clean energy, energy efficiency, and the state of Illinois’ renewable energy, equity, climate, electrification, and environmental goals. Ameren Illinois’ next Grid Plan is required to be filed by mid-January 2026.
Illinois law requires Ameren Illinois to offer rebates and net metering to certain customers who install renewable generation or paired energy storage systems at their premises. The cost of the customer generation rebate program is deferred as a regulatory asset, which earns a return at the applicable WACC. Customers that elect to receive a generation rebate and are enrolled in net metering are allowed to net their power supply service charges, but not their distribution service charges. Customers that elect to receive energy storage rebates and have not received generation rebates are allowed to net their power supply and distribution service charges. By law, Ameren Illinois’ electric distribution revenues are decoupled from sales volumes, which ensures that the electric distribution revenues authorized in a regulatory rate review are not affected by changes in sales volumes.