Skip to main content

AES CORP

For the period ended Sep 30, 2026. Filed Nov 3, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2026 · Filed Nov 3, 2026

AES$14.87-0.1%Stored close · as of Nov 6, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Notes to Condensed Consolidated Financial Statements

10 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Notes to Condensed Consolidated Financial Statements

For the Three and Nine Months Ended September 30, 2026 and 2025

  1. FINANCIAL STATEMENT PRESENTATION

Consolidation—In this Quarterly Report, the terms “AES,” “the Company,” “us,” or “we” refer to the consolidated entity, including its subsidiaries and affiliates. The terms “The AES Corporation” or “the Parent Company” refer only to the publicly held holding company, The AES Corporation, excluding its subsidiaries and affiliates.

The condensed consolidated financial statements of the Company include the accounts of The AES Corporation and its controlled subsidiaries. Furthermore, VIEs in which the Company has an ownership interest and is the primary beneficiary, thus controlling the VIE, have been consolidated. Intercompany transactions and balances are eliminated in consolidation. Investments in entities where the Company has the ability to exercise significant influence, but not control, are accounted for using the equity method of accounting or, in the case of Alto Maipo, the fair value option.

Consolidated VIEs — At September 30, 2026, the Company consolidates entities that have been identified as VIEs under ASC 810, Consolidation. These entities are primarily limited liability entities or partnership arrangements with third-party investors structured to develop, construct, and operate power generation facilities and related assets. These entities were generally determined to have insufficient equity to finance their activities during development and construction without additional subordinated financial support. The Company also has tax equity arrangements entered into with third parties in order to monetize certain tax credits associated with renewables facilities. These tax equity partnerships meet the definition of a VIE as the holders of the membership interests, as a group, lack the characteristics of a controlling financial interest, including substantive kickout rights. Under these arrangements, the third-party investors are allocated earnings, tax attributes, and distributable cash in accordance with the respective limited liability company agreements. The assets of these tax equity partnerships are generally restricted from transfer under the terms of their limited liability company agreements. The third-party investor’s ownership interest is recorded as either Redeemable stock of subsidiaries or Noncontrolling interests in the Condensed Consolidated Balance Sheets based on applicable guidance. See Note 11—Redeemable Stock of Subsidiaries and Note 12—Equity for further information.

Determining whether the Company is the primary beneficiary of a VIE requires judgment, including an assessment of contractual rights, operational responsibilities, and exposure to variability in returns. AES is considered the primary beneficiary of these VIEs when it has the power to direct the activities that most significantly affect their economic performance, such as construction, budgeting, operations, and maintenance, and it has the obligation to absorb expected losses and the right to receive benefits through its variable interests. As of September 30, 2026, the Company may be required to contribute up to $2.7 billion in additional equity to certain consolidated VIEs, with these contributions generally contingent upon the underlying assets achieving specific project milestones. Certain consolidated VIEs are financed with non-recourse project‑level debt. Creditors of these VIEs have no recourse to the Company beyond the VIE’s assets. See Note 8—Obligations for further information.

Unconsolidated VIEs— The Company has noncontrolling interests in VIEs accounted for under the equity method. These entities include partnerships in which the limited partners do not have substantive rights over the significant activities of these entities, as well as renewable energy project joint ventures that have insufficient equity to finance their activities during development and construction without additional subordinated financial support. AES is not the primary beneficiary because it does not have a controlling financial interest in these entities, as it does not have the power to direct the activities that most significantly impact these VIEs' performance; therefore, AES does not consolidate any of these entities. AES’ investment in these entities totaled approximately $159 million and $127 million as of September 30, 2026 and December 31, 2025, respectively, which are included in Investments in and advances to affiliates on the Condensed Consolidated Balance Sheets. See Note 7—Investments In and Advances to Affiliates for further information. AES' maximum exposure to loss is limited to its current investments in these entities.

Interim Financial Presentation—The accompanying unaudited condensed consolidated financial statements and footnotes have been prepared in accordance with GAAP, as contained in the FASB ASC, for interim financial information and Article 10 of Regulation S-X issued by the SEC. Accordingly, they do not include all the information and footnotes required by GAAP for annual fiscal reporting periods. In the opinion of management, the interim financial information includes all adjustments of a normal recurring nature necessary for a fair presentation of the results of operations, financial position, comprehensive income, changes in equity, and cash flows. The results of

11 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

operations for the three and nine months ended September 30, 2026 are not necessarily indicative of expected results for the year ending December 31, 2026. The accompanying condensed consolidated financial statements are unaudited and should be read in conjunction with the 2025 audited consolidated financial statements and notes thereto, which are included in the 2025 Form 10-K filed with the SEC on March 2, 2026 (the “2025 Form 10-K”).

Proposed Merger—On March 1, 2026, the Company entered into an Agreement and Plan of Merger (the “Merger Agreement”), by and among the Company, Horizon Parent, L.P., a Delaware limited partnership (“Parent”), and Horizon Merger Sub, Inc., a Delaware corporation and wholly-owned subsidiary of Parent (“Merger Sub”). Pursuant to the Merger Agreement, Merger Sub will merge with and into the Company (the “Merger”), with the Company continuing as the surviving corporation in the Merger. Parent is controlled by investment vehicles affiliated with one or more funds, accounts or other entities managed or advised by Global Infrastructure Management, LLC and the EQT Infrastructure VI fund.

At the effective time of the Merger, each share of the Company’s common stock outstanding immediately before the effective time (other than (i) shares of Company common stock held by any holder who properly exercises and perfects appraisal rights under Delaware law in respect of such shares and (ii) any shares of Company common stock held in the treasury of the Company or owned, directly or indirectly, by Parent or Merger Sub) will be converted automatically into the right to receive $15.00 in cash, without interest, per share.

The Board of Directors of the Company has unanimously approved the Merger Agreement, including the Merger and the other transactions contemplated thereby, and the Board of Directors of the Company has resolved to recommend that the Company stockholders approve the Merger and adopt the Merger Agreement.

The Merger Agreement includes certain representations, warranties, and covenants. Among other things, the Company has agreed (subject to certain exceptions) to conduct its business in the ordinary course consistent with past practice and not to take specified actions prior to closing without Parent’s consent. The Company is also required to hold a special meeting of its stockholders to seek approval of the Merger and, subject to certain exceptions, it has agreed not to solicit or engage in discussions or negotiations regarding alternative business combination proposals and not to withdraw or modify the Board’s recommendation in favor of the Merger.

In addition, subject to the terms of the Merger Agreement, the Company, Parent, and Merger Sub are required to use reasonable best efforts to obtain all required regulatory approvals, including certain regulatory approvals from the PUCO, the New York Public Service Commission, the FERC, and the Committee on Foreign Investment in the United States, and the expiration or termination of the applicable waiting period under the Hart-Scott-Rodino Antitrust Improvements Act of 1976, as amended (the “HSR Act”), as well as the receipt of certain approvals under the applicable laws of certain foreign countries, so long as such approval does not result in a Burdensome Condition (as defined in the Merger Agreement).

Consummation of the Merger is subject to various closing conditions, including: (1) approval of the stockholders of the Company, (2) receipt of the specified regulatory approvals without the imposition of a Burdensome Condition, (3) absence of any law or order prohibiting the consummation of the Merger, (4) subject to materiality qualifiers, the accuracy of each party’s representations and warranties, (5) each party’s compliance in all material respects with its obligations and covenants under the Merger Agreement, and (6) the absence of a material adverse effect with respect to the Company and its subsidiaries. Approval by the stockholders of the Company was obtained on June 26, 2026. At 11:59 p.m. Eastern Time on June 22, 2026, the waiting period under the HSR Act expired with respect to the Merger. On September 17, 2026, the PUCO issued an order approving the Merger. The OCC filed a motion for rehearing of the approval, arguing that the approval should have included an investment-grade credit rating maintenance requirement and ring-fencing requirement, which AES Ohio responded to on October 29, 2026. The PUCO’s approval order remains operative.

On October 15, 2026, the European Commission (“EC”) unconditionally approved the Merger under Council Regulation No. 139/2004 (as amended). Additionally, on October 19, 2026, the New York Public Service Commission issued a declaratory ruling that the Merger requires no further review under New York Public Service Law Section 70. Further, on October 28, 2026, the European Commission closed its preliminary review of the Merger in accordance with Article 10(4) of Regulation (EU) 2022/2560 of the European Parliament and of the Council of 14 December 2022 on foreign subsidies distorting the internal market (the “EU Foreign Subsidies Regulation Approval”). The Merger remains subject to certain additional regulatory approvals and other customary closing conditions. The completion of the Merger is not conditioned on receipt of financing by Parent.

The Merger Agreement contains certain termination rights for both the Company and Parent, including if the Merger is not consummated by June 1, 2027 (subject to extension for an additional two successive three-month periods if all of the conditions to closing, other than the conditions related to obtaining regulatory approvals, have been satisfied). The Merger Agreement also provides for certain termination rights for each of the Company and

12 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Parent, and provides that, upon termination of the Merger Agreement under certain specified circumstances, Parent would be required to pay a termination fee of $100 million or approximately $588 million (depending on the specific circumstances of termination) to the Company, and under other specified circumstances, the Company would be required to pay Parent a termination fee of approximately $321 million.

Cash, Cash Equivalents, and Restricted Cash— The following table provides a summary of cash, cash equivalents, and restricted cash amounts reported on the Condensed Consolidated Balance Sheets that reconcile to the total of such amounts as shown on the Condensed Consolidated Statements of Cash Flows (in millions):

September 30, 2026December 31, 2025
Cash and cash equivalents$1,972$1,382
Restricted cash (current assets) (1)591691
Debt service reserves and other deposits (noncurrent assets) (2)12489
Cash, Cash Equivalents, and Restricted Cash$2,687$2,162

(1)Includes approximately $410 million and $451 million of cash maintained in accordance with certain covenants of non-recourse debt agreements and $155 million and $153 million of cash held as collateral to cover potential liabilities for current and future insurance claims being assumed by AGIC, AES' captive insurance company, as of September 30, 2026 and December 31, 2025, respectively. See Note 8—Obligations for further information.

(2)Includes approximately $111 million and $80 million of cash maintained in accordance with certain covenants of non-recourse debt agreements as of September 30, 2026 and December 31, 2025, respectively. See Note 8—Obligations for further information.

Tax Credit Transferability—Historically, the Company has financed renewables projects with investments from tax equity investors who are allocated certain tax benefits associated with renewables projects (e.g., investment tax credits) through partnership agreements. The U.S. Inflation Reduction Act of 2022 (the “IRA”) allows the owners of renewable energy projects to directly transfer ITCs to unrelated tax credit buyers. This provides the Company with the flexibility to obtain financing on any particular project with (i) the transfer of tax credits or (ii) investments from tax equity investors who are allocated tax benefits. The Company may also elect to retain the tax credit and use it to reduce its tax liability.

The Company accounts for tax credits that it will retain or transfer under ASC 740—Income Taxes, as a reduction in income tax expense by either including the expected amount of the tax credit to be claimed or the cash to be received when transferred, respectively, in the calculation of its annual effective tax rate throughout the year the renewables project is placed in service. The Company applies the flow-through method to account for its investment tax credits. The estimated tax credits are updated on a quarterly basis, with the year-end calculation including only the tax credits that are associated with projects placed in service, comprising credits claimed or transferred during the year. In assessing realizability for credits to be transferred, the Company includes cash it anticipates receiving in establishing any valuation allowance and establishes a valuation allowance equal to its best estimate of any discount on the transfer. In many cases, ITCs are generated at partnerships which are non-tax paying entities for U.S. federal income tax purposes. These entities cannot utilize tax credits, but rather allocate credits to their partners, who report their share of the partnership credits on their individual tax returns. Once a project is placed in service, any portion of the tax credit to be transferred which is allocated to a noncontrolling interest holder is recorded as a noncash deemed contribution within Noncontrolling interests or Redeemable stock of subsidiaries, as applicable, on the Condensed Consolidated Balance Sheets as this represents an increase in the partners’ capital account. To the extent any of the expected transfer proceeds are contractually obligated to be distributed to the noncontrolling interest holder, the Company records a corresponding noncash deemed distribution within Noncontrolling interestsor Redeemable stock of subsidiaries, as applicable. The receipt of cash from the transfer of tax credits, inclusive of the portion allocated to noncontrolling interest holders, is treated as an operating cash inflow on the Condensed Consolidated Statements of Cash Flows. Proceeds from the transfer of tax credits are excluded from the supplemental disclosure of Cash payments for income taxes, net of refunds.

During the nine months ended September 30, 2026, the Company executed agreements for $535 million to transfer ITCs directly to a third party at a discount. Of this amount, $39 million was allocated to AES and $496 million was allocated to noncontrolling interests and treated as a contribution from noncontrolling interest holders. The Company received cash proceeds from these tax credit transfers of $535 million during the nine months ended September 30, 2026. In addition, during the nine months ended September 30, 2026, we received cash proceeds of $448 million related to tax credit transfer agreements executed in 2025, and of this amount, we distributed $414 million to noncontrolling interest holders.

During the nine months ended September 30, 2025, the Company executed agreements to transfer ITCs directly to third parties for $921 million. Of this amount, $353 million was allocated to AES and $568 million was allocated to noncontrolling interests and treated as a contribution from noncontrolling interest holders. The Company received cash proceeds from these tax credit transfers of $567 million during the nine months ended September 30, 2025 and received the remaining $161 million in October 2025 and $193 million in the first quarter of

13 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

  1. In addition, during the nine months ended September 30, 2025, the Company received cash proceeds of $75 million related to a tax credit transfer agreement executed in 2024.

New Accounting Pronouncements Adopted in 2026—The Company assessed all accounting pronouncements adopted in 2026 and determined they were either not applicable or did not have a material impact on the Company’s condensed consolidated financial statements.

New Accounting Pronouncements Issued But Not Yet Effective—The following table provides a brief description of recent accounting pronouncements that could have a material impact on the Company’s condensed consolidated financial statements once adopted. Accounting pronouncements not listed below were assessed and determined to be either not applicable or are expected to have no material impact on the Company’s condensed consolidated financial statements.

New Accounting Standards Issued But Not Yet Effective
ASU Number and NameDescriptionDate of AdoptionEffect on the financial statements upon adoption
2024-03: Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40)The amendments in this Update require disclosure, in the notes to financial statements, of specified information about certain costs and expenses. The amendments require that at each interim and annual reporting period an entity:1. Disclose the amounts of (a) purchases of inventory, (b) employee compensation, (c) depreciation, (d) intangible asset amortization, and (e) depreciation, depletion, and amortization recognized as part of oil- and gas-producing activities (DD&A) (or other amounts of depletion expense) included in each relevant expense caption. A relevant expense caption is an expense caption presented on the face of the income statement within continuing operations that contains any of the expense categories listed in (a)–(e).2. Include certain amounts that are already required to be disclosed under current generally accepted accounting principles (GAAP) in the same disclosure as the other disaggregation requirements.3. Disclose a qualitative description of the amounts remaining in relevant expense captions that are not separately disaggregated quantitatively.4. Disclose the total amount of selling expenses and, in annual reporting periods, an entity’s definition of selling expenses.The date for each amendment in this Update is effective for fiscal years beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted.This ASU only affects disclosures, which will be provided when the amendment becomes effective.
2025-06: Intangibles—Goodwill and Other—Internal-Use Software (Subtopic 350-40): Targeted Improvements to the Accounting for Internal-Use SoftwareThe amendments in this Update remove all references to prescriptive and sequential software development stages (referred to as “project stages”) throughout Subtopic 350-40. Therefore, an entity is required to start capitalizing software costs when both of the following occur:1. Management has authorized and committed to funding the software project.2. It is probable that the project will be completed and the software will be used to perform the function intended.In evaluating the probable-to-complete recognition threshold, an entity is required to consider whether there is significant uncertainty associated with the development activities of the software. The two factors to consider in determining whether there is significant development uncertainty are whether:1. The software being developed has technological innovations or novel, unique, or unproven functions or features, and the uncertainty related to those technological innovations, functions, or features, if identified, has not been resolved through coding and testing.2. The entity has determined what it needs the software to do (for example, functions or features), including whether the entity has identified or continues to substantially revise the software’s significant performance requirements.The amendments in this Update are effective for fiscal years beginning after December 15, 2027, and interim reporting periods within those annual reporting periods. Early adoption is permitted as of the beginning of an annual reporting period.The Company is currently evaluating the impact of adopting the standard on its consolidated financial statements.

14 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

2025-07: Derivatives and Hedging (Topic 815) and Revenue from Contracts with Customers (Topic 606): Derivatives Scope Refinements and Scope Clarification for Share-Based Noncash Consideration from a Customer in a Revenue ContractIssue 1: Derivatives Scope RefinementsThe amendments in this Update exclude from derivative accounting non-exchange-traded contracts with underlyings that are based on operations or activities specific to one of the parties to the contract.Issue 2: Scope Clarification for Share-Based Noncash Consideration from a Customer in a Revenue ContractThe amendments in this Update clarify that an entity should apply the guidance in Topic 606, including the guidance on noncash consideration to a contract with share-based noncash consideration (for example, shares, share options, or other equity instruments) from a customer for the transfer of goods or services.The amendments in this Update are effective for fiscal years beginning after December 15, 2026, and interim reporting periods within those annual reporting periods. Early adoption is permitted.AES evaluated the provisions of ASU 2025-07 in relation to its existing derivative portfolio, revenue arrangement, and compensation programs. Although certain amendments clarify the scope of derivative accounting based on an entity’s own operations, AES’ current derivative portfolio primarily consists of interest rate swaps, foreign currency forward and commodity instruments that are not expected to be affected by the Update. In addition, AES does not receive share-based noncash consideration from customers within the scope of the amendments. Accordingly, adoption is not expected to have a material impact on AES’ consolidated financial statements.
2025-09: Hedge Accounting ImprovementsIssue 1: Similar Risk Assessment for Cash Flow Hedges The amendments in this Update permit grouping forecasted transactions in a cash flow hedge based on similar risk exposures, subject to initial and ongoing risk assessments.Issue 2: Hedging Forecasted Interest Payments on Choose‑Your‑Rate DebtThe amendments in this Update provide a model to facilitate the application of cash flow hedge accounting for forecasted interest payments on variable‑rate debt that permits borrowers to change the interest rate index and reset frequency (“choose‑your‑rate” debt).Issue 3: Cash Flow Hedges of Nonfinancial Forecasted TransactionsThe amendments in this Update expand hedge accounting for forecasted purchases and sales of nonfinancial assets by allowing hedging of eligible price components and subcomponents, subject to specific criteria.Issue 4: Net Written Options as Hedging InstrumentsThe amendments in this Update eliminate the requirement to apply the net written option test to compound derivatives consisting of a swap and a written option that are designated as hedging instruments in cash flow or fair value hedges of interest rate risk.Issue 5: Foreign‑Currency‑Denominated Debt Used in Dual HedgesThe amendments in this Update eliminate recognition and presentation mismatches in dual hedge strategies by excluding fair value hedge basis adjustments from net investment hedge effectiveness assessments and requiring related foreign exchange gains and losses to be recognized in earnings.The amendments in this Update are effective for annual reporting periods beginning after December 15, 2026, and interim periods within those annual reporting periods, and should be applied prospectively for all hedging relationships that exist at the date of adoption.AES evaluated the provisions of ASU 2025-09 in relation to its existing derivative portfolio and hedge-accounting strategies. Although certain amendments are applicable to AES’ portfolio hedges of forecasted debt transactions and debt arrangements that permit a choice of interest-rate indices, the amendments principally provide additional flexibility in hedge designation and continuity. AES does not currently engage in material nonfinancial component hedging, net written option hedging strategies, or dual-hedge strategies affected by the Update. Accordingly, adoption is not expected to have a material impact on AES’ consolidated financial statement, although certain hedge documentation, accounting policies, and related controls will be updated.
2025-11: Interim Reporting (Topic 270)—Narrow-Scope ImprovementsThe amendments in this Update clarify interim disclosure requirements and the applicability of Topic 270 by organizing existing GAAP interim disclosure requirements into a single framework and clarifying when additional disclosures are required for material events occurring after the most recent annual reporting period.The amendments in this Update are effective for fiscal years beginning after December 15, 2027, and interim reporting periods within those annual reporting periods.This ASU only affects disclosures, which will be provided when the amendment becomes effective.

15 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

2025-12: Codification ImprovementsThe amendments in this Update include 33 issues that represent changes to the Codification that clarify, correct errors, or make minor improvements, making the Codification easier to understand and apply. The amendments in this Update are varied in nature and may affect the application of guidance in cases in which the original guidance may have been unclear.The amendments in this Update are effective for fiscal years beginning after December 15, 2026, and interim reporting periods within those annual reporting periods. Early adoption is permitted on an issue-by-issue basis as of the beginning of an annual reporting period.AES evaluated the provisions of ASU 2025-12 in relation to its existing accounting policies. The majority of the amendments represent clarifications, corrections, or minor improvements to existing guidance and are not expected to affect AES' accounting. Accordingly, adoption is not expected to have a material impact on its consolidated financial statements, although certain accounting policies, documentation and related controls may be updated.
2026-01: Equity (Topic 505): Initial Measurement of Paid-in-Kind Dividends on Equity-Classified Preferred StockThe amendments in this Update require that paid-in-kind dividends on equity-classified preferred stock be initially measured on the basis of the paid-in-kind dividend rate stated in the preferred stock agreement.The amendments in this Update are effective for fiscal years beginning after December 15, 2026, and interim reporting periods within those annual reporting periods. Early adoption is permitted.AES evaluated the provisions of ASU 2026-01 in relation to its existing capital structure and equity arrangements. Although the amendments establish guidance for the initial measurement of paid-in-kind (“PIK”) dividends on equity-classified preferred stock, AES does not currently have preferred stock arrangements with PIK dividend features within the scope of the Update. Accordingly, adoption will not have a material impact on AES’ consolidated financial statements.
2026-02: Environmental Credits and Environmental Credit Obligations (Topic 818)The amendments in this Update improve GAAP by providing specific authoritative guidance for environmental credit obligations.The amendments in this Update are effective for fiscal years beginning after December 15, 2027, and interim reporting periods within those annual reporting periods. Early adoption is permitted.The Company is currently evaluating the impact of adopting the standard on its consolidated financial statements.
  1. INVENTORY

The following table summarizes the Company’s inventory balances as of the dates indicated (in millions):

September 30, 2026December 31, 2025
Spare parts and supplies$401$392
Fuel and other raw materials216220
Total$617$612
  1. FAIR VALUE

The fair value of current financial assets and liabilities, debt service reserves, and other deposits approximate their reported carrying amounts. The estimated fair values of the Company’s assets and liabilities have been determined using available market information. Because these amounts are estimates and based on hypothetical transactions to sell assets or transfer liabilities, the use of different market assumptions and/or estimation methodologies may have a material effect on the estimated fair value amounts. For further information on our valuation techniques and policies, see Note 5—Fair Value in Item 8.—Financial Statements and Supplementary

16 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Data of our 2025 Form 10-K.

Recurring Measurements

The following table presents, by level within the fair value hierarchy, the Company’s financial assets and liabilities that were measured at fair value on a recurring basis as of the dates indicated (in millions). For the Company’s investments in marketable debt securities, the security classes presented were determined based on the nature and risk of the security and are consistent with how the Company manages, monitors, and measures its marketable securities:

September 30, 2026December 31, 2025
Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
Assets
Contingent consideration (1)$—$—$8$8$—$—$—$—
DEBT SECURITIES:
Available-for-sale:
Certificates of deposit—3—3—3—3
Government debt securities—3—3————
Total debt securities—6—6—3—3
EQUITY SECURITIES:
Mutual funds59——5957——57
Common stock————1——1
Total equity securities59——5958——58
DERIVATIVES:
Interest rate derivatives—716—716—279—279
Foreign currency derivatives—6—6—24—24
Commodity derivatives78778163109725186
Total derivatives — assets7879988851093755489
TOTAL ASSETS$137$805$16$958$167$378$5$550
Liabilities
Contingent consideration (2)$—$—$212$212$—$—$205$205
DERIVATIVES:
Interest rate derivatives—3—3—59—59
Foreign currency derivatives—50—50—28—28
Commodity derivatives7625401411104245197
Total derivatives — liabilities76784019411012945284
TOTAL LIABILITIES (2)$76$78$252$406$110$129$250$489

(1)Payments contingent upon specified events related to the disposition of Uplight completed in August 2026. See Note 7—Investments in and Advances to Affiliates for further information.

(2)Includes $6 million of contingent consideration reported in Current held-for-sale liabilitieson the Condensed Consolidated Balance Sheets related to the JK Projects as of September 30, 2026.

As of September 30, 2026, all available-for-sale debt securities had stated maturities within one year. For the three and nine months ended September 30, 2026, no impairments of marketable securities were recognized in earnings or other comprehensive income (loss). Credit-related impairments are recognized as an allowance with a corresponding impact recognized as a credit loss in Other expense. Gains and losses on sale of investments are determined using the specific-identification method. The following table presents gross proceeds from the sale of available-for-sale securities for the periods indicated (in millions):

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
Gross proceeds from sale of available-for-sale securities$1$—$3$4

The Company accounts for equity securities without readily determinable fair values using the measurement alternative in accordance with ASC 321. These securities are measured at cost minus impairment, if any, plus or minus changes resulting from observable price changes in orderly transactions for the identical or similar investments of the same issuer. Upward adjustments resulting from observable price changes are recorded in Other incomeand impairments and downward adjustments are recorded in Other expense. As of both December 31, 2025 and September 30, 2026, the carrying amount of equity securities accounted for using the measurement alternative was $19 million, inclusive of $22 million of cumulative upward adjustments recorded in Other income in prior years and a $48 million downward adjustment recorded in Other expensein June 2025 to reflect observable price changes for our investment in 5B Holdings Ptd. Ltd. ("5B").

The following tables present a reconciliation of assets and liabilities measured at fair value on a recurring basis using significant unobservable inputs (Level 3) for the three and nine months ended September 30, 2026 and 2025 (derivative balances are presented net), in millions. Transfers between Level 3 and Level 2 principally result from changes in the significance of unobservable inputs used to calculate the credit valuation adjustment.

17 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Derivative Assets and Liabilities
Three Months Ended September 30, 2026Interest RateForeign CurrencyCommodityContingent Consideration Assets and LiabilitiesTotal
Balance at July 1, 2026$—$—$(25)$(205)$(230)
Total realized and unrealized gains (losses):
Included in earnings——(1)(5)(6)
Included in other comprehensive income (loss) — derivative activity——(6)—(6)
Included in other comprehensive income (loss) — foreign currency translation activity———(1)(1)
Included in regulatory liabilities——(1)—(1)
Acquisitions———(18)(18)
Settlements——11415
Dispositions———1111
Balance at September 30, 2026$—$—$(32)$(204)$(236)
Total losses for the period included in earnings attributable to the change in unrealized gains (losses) relating to assets and liabilities held at the end of the period$—$—$—$(5)$(5)
Derivative Assets and Liabilities
Three Months Ended September 30, 2025Interest RateForeign CurrencyCommodityContingent Consideration LiabilitiesTotal
Balance at July 1, 2025$—$35$(22)$(144)$(131)
Total realized and unrealized gains (losses):
Included in earnings—1—67
Included in other comprehensive income (loss) — derivative activity——8—8
Acquisitions———(8)(8)
Settlements—(10)(1)—(11)
Transfers of assets (liabilities), net out of Level 3—(26)——(26)
Balance at September 30, 2025$—$—$(15)$(146)$(161)
Total gains for the period included in earnings attributable to the change in unrealized gains (losses) relating to assets and liabilities held at the end of the period$—$—$—$6$6

18 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Derivative Assets and Liabilities
Nine Months Ended September 30, 2026Interest RateForeign CurrencyCommodityContingent Consideration Assets and LiabilitiesTotal
Balance at January 1, 2026$—$—$(40)$(205)$(245)
Total realized and unrealized gains (losses):
Included in earnings———(7)(7)
Included in other comprehensive income (loss) — derivative activity——7—7
Included in other comprehensive income (loss) — foreign currency translation activity———(1)(1)
Included in regulatory liabilities——6—6
Acquisitions———(34)(34)
Settlements——(5)3227
Dispositions———1111
Balance at September 30, 2026$—$—$(32)$(204)$(236)
Total losses for the period included in earnings attributable to the change in unrealized gains (losses) relating to assets and liabilities held at the end of the period$—$—$—$(7)$(7)
Derivative Assets and Liabilities
Nine Months Ended September 30, 2025Interest RateForeign CurrencyCommodityContingent Consideration LiabilitiesTotal
Balance at January 1, 2025$(1)$52$(21)$(145)$(115)
Total realized and unrealized gains (losses):
Included in earnings—3—(12)(9)
Included in other comprehensive income (loss) — derivative activity—15—6
Included in regulatory liabilities——5—5
Acquisitions———(19)(19)
Settlements—(30)(3)30(3)
Transfers of assets (liabilities), net into Level 3——(1)—(1)
Transfers of assets (liabilities), net out of Level 31(26)——(25)
Balance at September 30, 2025$—$—$(15)$(146)$(161)
Total losses for the period included in earnings attributable to the change in unrealized gains (losses) relating to assets and liabilities held at the end of the period$—$(12)$—$(12)$(24)

The following table summarizes the significant unobservable inputs used for Level 3 derivative assets (liabilities) as of September 30, 2026 (in millions, except range amounts):

Type of DerivativeFair ValueUnobservable InputAmount or Range (Average)
Commodity:
CAISO energy swap$(33)Forward CAISO energy prices per MWh from 2032 through 2038$4.76 to $127.94 ($52.10)
MISO energy swap(4)Forward MISO energy prices per MWh from 2032 through 2040$29.88 to $114.88 ($56.54)
Other5
Total$(32)

For the CAISO and MISO energy swaps, increases (decreases) in the estimates above would decrease (increase) the value of the derivatives.

Contingent consideration is primarily related to future milestone payments associated with acquisitions of renewables development projects. The estimated fair value of contingent consideration is determined using probability-weighted discounted cash flows based on internal forecasts, which are considered Level 3 inputs. Changes in Level 3 inputs, particularly changes in the probability of achieving development milestones, could result in material changes to the fair value of the contingent consideration and could materially impact the amount of expense or income recorded each reporting period. Contingent consideration is updated quarterly with any prospective changes in fair value recorded through earnings. Gains and losses on the remeasurement of contingent consideration are recognized in Other income and Other expense, respectively, on the Condensed Consolidated Statements of Operations.

19 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Nonrecurring Measurements

The Company measures fair value using the applicable fair value measurement guidance. Impairment expense, shown as pre-tax loss below, is measured by comparing the fair value at the evaluation date to the then-latest available carrying amount and is included in Asset impairment reversals (expense) or Other non-operating expense, as applicable, on the Condensed Consolidated Statements of Operations. The following table summarizes our major categories of asset groups measured at fair value on a nonrecurring basis and their level within the fair value hierarchy (in millions):

Measurement Date · Carrying Amount (1) · Fair Value
Nine Months Ended September 30, 2025 · Level 1 · Level 2 · Level 3 · Pre-tax Loss
Held-for-sale businesses: (2)
Mong Duong (3)3/31/2025$383$—$371$—$17
Equity method investments: (4)
Uplight9/30/2025$60$—$—$—$60

(1)Represents the carrying values of the asset groups at the dates of measurement, before fair value adjustment.

(2)See Note 18—Held-for-Sale and Dispositions for further information.

(3)The pre-tax loss recognized was calculated using the fair value of the Mong Duong disposal group less costs to sell of $5 million.

(4)See Note 7—Investments in and Advances to Affiliates for further information.

AES Clean Energy Development Projects— On a quarterly basis, the Company reviews the status of development projects to identify projects that are no longer viable and will be abandoned. The fair value of each abandoned project with no salvage value is determined to be zero as there are no future projected cash flows, resulting in a full write-off of the carrying value of project development intangibles and capitalized development costs incurred.

The Company recognized $128 million and $132 million of pre-tax asset impairment expense related to AES Clean Energy Development Projects during the nine months ended September 30, 2026 and 2025, respectively. See Note 16—Asset Impairment Expense for further information.

Mong Duong — In November 2023, the Company entered into an agreement to sell its entire 51% ownership interest in Mong Duong 2, a coal-fired plant in Vietnam, and 51% equity interest in Mong Duong Finance Holdings B.V., an SPV accounted for as an equity affiliate (collectively "Mong Duong"). As of May 31, 2025, due to delays in closing the transaction and the pending expiration of the agreement in November 2025, the Company determined Mong Duong no longer met the held-for-sale criteria and the asset group was reclassified as held and used.

During the nine months ended September 30, 2025, the Company recognized a $243 million increase in the carrying value of the Mong Duong asset group due to the derecognition of a $239 million valuation allowance on the loan receivable accounted for under ASC 310, which had been recognized in Asset impairment expense between December 31, 2023 and March 31, 2025 while Mong Duong was classified as held-for-sale, and the elimination of $4 million in net estimated costs to sell from the measurement of the asset group. Upon reclassification out of held-for-sale, the loan receivable was remeasured at amortized cost and individual non-loan assets were remeasured at the lower of (i) carrying value before Mong Duong was classified as held for sale, adjusted for any depreciation expense or impairment losses that would have been recognized had the asset been continuously classified as held and used, or (ii) fair value at the date of the subsequent determination that held-for-sale criteria was no longer met. See Note 16—Asset Impairment Expense for further information.

Financial Instruments Not Measured at Fair Value in the Condensed Consolidated Balance Sheets

The following table presents (in millions) the carrying amount, fair value, and fair value hierarchy of the Company’s financial assets and liabilities that are not measured at fair value in the Condensed Consolidated Balance Sheets as of the periods indicated, but for which fair value is disclosed:

20 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

CarryingAmount · Fair Value
Total · Level 1 · Level 2 · Level 3
Assets:Financing receivables (1)$784$784$—$—$784
Liabilities:Non-recourse debt26,03726,418—25,0411,377
Recourse debt6,3616,150—6,150—
CarryingAmount · Fair Value
Total · Level 1 · Level 2 · Level 3
Assets:Financing receivables (1)$855$955$—$—$955
Liabilities:Non-recourse debt23,17823,749—20,4483,301
Recourse debt5,9845,003—5,003—

(1)For both periods presented, amounts primarily relate to the Mong Duong loan receivable, payment deferrals granted to mining customers as part of our green blend agreements in Chile, and the sale of the Redondo Beach land. These are included in Loan receivable and Other noncurrent assetsin the accompanying Condensed Consolidated Balance Sheets. See Note 5—Financing Receivablesfor further information.

  1. DERIVATIVE INSTRUMENTS AND HEDGING ACTIVITIES

For further information on the Company’s derivative and hedge accounting policies, see Note 1—General and Summary of Significant Accounting Policies—Derivatives and Hedging Activities of Item 8.—Financial Statements and Supplementary Data in the 2025 Form 10-K. See Note 3—Fair Value for additional disclosures related to derivative instruments.

Volume of Activity—The following tables present the Company’s maximum notional (in millions) over the remaining contractual period by type of derivative as of September 30, 2026, and the dates through which the maturities for each type of derivative range:

Interest Rate and Foreign Currency DerivativesMaximum Notional Translated to USDLatest Maturity (1)
Interest rate$8,8632058
Foreign currency:
Chilean peso2552029
Colombian peso2322029
Euro572028
Mexican peso302027
Commodity DerivativesMaximum NotionalLatest Maturity (2)
Natural Gas (in MMBtu)532029
Power (in MWhs) (2)342040

(1)Maturity dates are consistent for both designated and non-designated positions.

(2)Includes one contract designated as a cash flow hedge with a final maturity date in 2038.

Accounting and Reporting— Assets and Liabilities—The following tables present the fair value of the Company’s derivative assets and liabilities as of the dates indicated (in millions):

Fair ValueSeptember 30, 2026December 31, 2025
AssetsDesignatedNot DesignatedTotalDesignatedNot DesignatedTotal
Interest rate derivatives$702$14$716$279$—$279
Foreign currency derivatives426111324
Commodity derivatives41591634182186
Total assets$710$175$885$294$195$489
Liabilities
Interest rate derivatives$1$2$3$59$—$59
Foreign currency derivatives4465042428
Commodity derivatives3610514146151197
Total liabilities$41$153$194$109$175$284
September 30, 2026December 31, 2025
Fair ValueAssetsLiabilitiesAssetsLiabilities
Current$433$97$261$154
Noncurrent45297228130
Total$885$194$489$284

21 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Earnings and Other Comprehensive Income (Loss)—The following table presents the pre-tax gains (losses) recognized in AOCL and earnings on the Company’s derivative instruments for the periods indicated (in millions):

Three Months Ended September 30, · Nine Months Ended September 30,
2026 · 2025 · 2026 · 2025
Cash flow hedges
Gains (losses) recognized in AOCL
Interest rate derivatives$541$2$618$(183)
Foreign currency derivatives(4)(1)266
Commodity derivatives(3)5155
Total$534$6$659$(172)
Gains (losses) reclassified from AOCL into earnings
Interest rate derivatives — Interest expense$—$2$(4)$11
Foreign currency derivatives — Foreign currency transaction gains (losses)—136
Commodity derivatives — Cost of sales—Non-Regulated(2)(3)1—
Total$(2)$—$—$17
Gains reclassified from AOCL to earnings due to change in forecast$—$—$—$8
Not designated as hedging instruments
Gains (losses) recognized in earnings related to
Interest rate derivatives — Interest expense$13$(2)$13$(2)
Foreign currency derivatives — Foreign currency transaction gains (losses)(6)(4)(12)(13)
Commodity derivatives — Revenue—Non-Regulated(4)907051
Commodity derivatives — Cost of sales—Non-Regulated25(26)33(40)
Total$28$58$104$(4)

Reclassifications from AOCL to earnings are forecasted to increase pre-tax income from continuing operations by $64 million for the twelve months ended September 30, 2027, primarily related to Interest rate derivatives.

  1. FINANCING RECEIVABLES

Receivables with contractual maturities of greater than one year are considered financing receivables. The following table presents long-term financing receivables, excluding lease receivables and amounts classified as held for sale, by country as of the dates indicated (in millions):

September 30, 2026December 31, 2025
Gross ReceivableAllowanceNet ReceivableGross ReceivableAllowanceNet Receivable
Vietnam$707$17$690$774$19$755
Chile57—5761—61
U.S.552431511932
Other6—67—7
Total$825$41$784$893$38$855

Vietnam —AES has recorded loan receivables of $781 million as of September 30, 2026 pertaining to our Mong Duong plant in Vietnam. During the nine months ended September 30, 2026 and September 30, 2025, the Company collected $83 million and $91 million, respectively. The plant was constructed under a BOT contract and sold to the Vietnamese government, while we remain the operator for the duration of the 25-year PPA. Mong Duong was reclassified from held-for-sale to held and used as of May 31, 2025 and therefore $91 million was classified in Other current assets, and $690 million in Loan receivableon the Condensed Consolidated Balance Sheet as of September 30, 2026. See Note 14—Revenue and Note 18—Held-for-Sale and Dispositions for further information.

Chile —AES Andes has recorded non-current receivables pertaining to payment deferrals granted to mining customers as part of our green blend agreements.

U.S. — AES has recorded non-current receivables pertaining to the sale of the Redondo Beach land. The anticipated collection period extends beyond September 30, 2027.

  1. ALLOWANCE FOR CREDIT LOSSES

The following table represents the rollforward of the allowance for credit losses for the periods indicated (in millions):

22 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Nine Months Ended September 30, 2026Accounts ReceivableFinancing ReceivablesOther (1)Total
CECL reserve balance at beginning of period$39$38$6$83
Current period provision314—35
Write-offs charged against allowance(34)——(34)
Recoveries collected—(1)—(1)
CECL reserve balance at end of period$36$41$6$83
Nine Months Ended September 30, 2025Accounts ReceivableFinancing ReceivablesOther (1)Total
CECL reserve balance at beginning of period$52$15$29$96
Reclassification from held-for-sale to held and used—21(21)—
Current period provision383—41
Write-offs charged against allowance(43)——(43)
Recoveries collected(4)(1)(1)(6)
Foreign exchange——(1)(1)
CECL reserve balance at end of period$43$38$6$87

(1)Primarily relates to credit losses allowance on Argentina receivables as of September 30, 2026 and September 30, 2025.

Following the implementation of customer billing system upgrades at our utilities in 2023 and 2024, a temporary pause in customer disconnections, certain collections efforts, and write-off processes contributed to increased provisions and allowance for credit losses throughout 2025. AES Indiana and AES Ohio reinstituted customer disconnections and write-off processes in March and June 2025, respectively. The resumption of these activities resulted in increased write-offs.

  1. INVESTMENTS IN AND ADVANCES TO AFFILIATES

Summarized Financial Information —The following table summarizes financial information of the Company’s 50%-or-less-owned affiliates and majority-owned unconsolidated subsidiaries that are accounted for using the equity method (in millions):

50%-or-less Owned Affiliates (1)Majority-Owned Unconsolidated Subsidiaries (2)
Nine Months Ended September 30,2026202520262025
Revenue$2,450$2,046$—$—
Operating income (loss)9368(1)—
Net loss(156)(148)(1)(2)
Net loss attributable to affiliates(158)(155)(1)(2)

(1)The summarized financial information of Uplight is not included in the table above for the nine months ended September 30, 2026 as the equity method of accounting was suspended during the fourth quarter of 2025.

(2)The summarized financial information of Alto Maipo is not included in the table above as the Company is not the primary beneficiary, the fair value of the investment is insignificant, and the investment in Alto Maipo is not material to the financial results of the Company.

Uplight — In March 2026, the Company entered into an agreement to sell its 25% ownership interest and convertible note in Uplight for up to $40 million, including $10 million at closing and up to an additional $30 million contingent upon specified events. The transaction closed in August 2026 and the Company received $10 million. Prior to its sale, Uplight was reported in the New Energy Technologies SBU reportable segment.

Fluence —In May 2026, the Company redeemed 10,066,414 common units of Fluence Energy, LLC. Fluence Energy, Inc. settled this redemption through the issuance of an equivalent number of shares of its Class A common stock. In conjunction with this redemption, the Company executed a public sale of the Class A shares, resulting in net proceeds of $207 million after expenses, and a pre-tax gain on sale of $186 million, recorded in Gain on disposal and sale of business interests. As a result of this transaction, AES' ownership interest decreased from 28% to 22%. As the Company still does not control but has significant influence over Fluence after the transaction, it continues to be accounted for as an equity method investment. Fluence is reported in the New Energy Technologies SBU reportable segment.

JK Projects — In May 2026, the Company completed the contribution of two of the Jemeiwaa Ka’I wind projects (“JK Projects”), JK1 and JK2, to a trust, receiving proceeds of $25 million. After closing the transaction, the Company retained 51% ownership in the trust, which is considered a VIE and accounted for as an equity method investment. As the Company lacks the power to make significant decisions without the consent of all parties, it does not meet the criteria to be considered the primary beneficiary and therefore does not consolidate the entity. The

23 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Company recorded its retained interest in the trust at fair value of $27 million. See Note 18—Held-for-Sale and Dispositionsfor further information. The JK Projects are reported in the Renewables SBU reportable segment.

El Salvador —In April 2026, the Company acquired the remaining 50% ownership interests in the Bosforo and Cuscatlan solar projects for a total of $44 million. The transactions were accounted for as asset acquisitions as the projects did not meet the definition of a business. Prior to the transactions, the Company’s investments in Bosforo and Cuscatlan were accounted for under the equity method; however, as a result of the transactions, both are now consolidated by AES. Bosforo and Cuscatlan are reported in the Utilities SBU reportable segment.

Alto Maipo — The Company holds a 99% ownership interest in Alto Maipo SpA (“Alto Maipo”), a hydroelectric plant in Chile. In May 2022, Alto Maipo emerged from bankruptcy in accordance with Chapter 11 of the U.S. Bankruptcy Code. Alto Maipo, as restructured, is considered a VIE. As the Company lacks the power to make significant decisions, it does not meet the criteria to be considered the primary beneficiary of Alto Maipo and therefore does not consolidate the entity. The Company has elected the fair value option to account for its investment in Alto Maipo as management believes this approach will better reflect the economics of its equity interest. As of September 30, 2026 and December 31, 2025, the fair value is insignificant. Alto Maipo is reported in the Renewables SBU reportable segment.

Barry— The Company holds a 100% ownership interest in AES Barry Ltd. ("Barry"), a dormant entity in the U.K. that disposed of its generation and other operating assets. Due to a debt agreement, no material financial or operating decisions can be made without the banks' consent, and the Company does not control Barry. As of September 30, 2026 and December 31, 2025, Other noncurrent liabilities included $43 million and $44 million, respectively, related to this debt agreement. Barry is reported in the Energy Infrastructure SBU reportable segment.

Dominican Republic Renewables — In June 2025, the Company completed the sale of 50% of its interests in AES DR Renewables Holdings, S.L. and its subsidiaries (collectively “Dominican Republic Renewables”) for $103 million and received cash proceeds for the sale of $100 million in July 2025. The Company retained a 50% ownership interest in Dominican Republic Renewables after the sale. However, the Company’s ownership in Dominican Republic Renewables is held through AES Hispanola Holdings II BV, a 65%-owned consolidated subsidiary, resulting in an AES effective ownership of 33%. The business was deconsolidated and accounted for as an equity method investment. The Company recorded its retained interest in Dominican Republic Renewables at fair value of $103 million, using the market approach. See Note 18—Held-for-Sale and Dispositionsfor further information. Dominican Republic Renewables is reported in the Renewables SBU reportable segment.

  1. OBLIGATIONS

Recourse Debt — Recourse debt represents debt that the Parent Company has an obligation to settle. This can be debt issued directly by the Parent Company or debt issued by a subsidiary under which the Parent Company has explicit commitments such as guarantees, indemnities, letters of credit, or agreements to settle if the subsidiary defaults.

Unsecured Term Loan — In September 2026, the Company executed a $300 million unsecured delayed draw term loan agreement, with an option to borrow until January 2027 and maturity date 364 days after the funding date. As of September 30, 2026, AES had no outstanding drawings under the loan agreement.

Senior Notes due 2029 and 2033 —In June 2026, the Company issued $600 million aggregate principal of 5.20% senior notes due in 2029 and $400 million aggregate principal of 5.75% senior notes due in 2033. The Company used the net proceeds from this offering to repay existing indebtedness, including its senior unsecured term loan of $500 million due in December 2026, and for general corporate purposes.

Senior Notes due 2028 and 2032 — In March 2026, the Company entered into supplemental indentures with respect to its Senior Notes due 2028 and its Senior Notes due 2032 (together, the “Notes”). The supplemental indentures amend the indentures governing each series to provide that the Merger will not constitute a “Change of Control” under those indentures. The amendments will become operative only upon the consummation of the Merger and the payment of the consent fee with respect to each series of the Notes.

Senior Unsecured Term Loan due December 2026 —In October 2025, the Company executed a $300 million senior unsecured term loan agreement, maturing in December 2026. In March 2026, the Company and the lender executed an amendment providing lender consent to the consummation of the Merger. In September 2026, the Company fully repaid $300 million under the loan agreement.

Senior Unsecured Term Loan due December 2026 —In June 2025, the Company executed a $500 million senior unsecured term loan agreement, maturing in June 2026. In November 2025, the Company executed an

24 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

amendment extending the maturity date of the loan agreement to December 2026. In March 2026, the Company and the lender executed an amendment providing lender consent to the consummation of the Merger. In June 2026, AES used the net proceeds of its senior notes issuance to fully repay this term loan.

Senior Notes due 2032 —In March 2025, the Company issued $800 million aggregate principal of 5.80% senior notes due in 2032. The Company used the proceeds from this issuance to purchase via tender offer a portion of its 3.30% senior notes due in 2025. As a result of the latter transaction, the Company recognized a gain on extinguishment of debt of $2 million.

Commercial Paper Program — In March 2023, the Company established a commercial paper program under which the Company may issue unsecured commercial paper notes (the “Notes”) up to a maximum aggregate face amount of $750 million outstanding at any time. In April 2025, the Company executed agreements to increase the maximum aggregate face amount to $1.5 billion outstanding at any time. The maturities of the Notes may vary but will not exceed 397 days from the date of issuance. The proceeds of the Notes will be used for general corporate purposes. The Notes will be sold on customary terms in the U.S. commercial paper market on a private placement basis. The commercial paper program is backed by the Company's $1.8 billion in revolving credit facilities, and the Company cannot issue commercial paper in an aggregate amount exceeding the then available capacity under its revolving credit facilities. During the nine months ended September 30, 2026, the Company borrowed approximately $44.6 billion and repaid approximately $44.7 billion under the commercial paper program, with average daily outstanding borrowings of $727 million. As of September 30, 2026, the Company had no outstanding borrowings under the commercial paper program.

Revolving Credit Facilities — In August 2026, AES executed amendments to extend the maturity dates of its existing revolving credit facilities. The $300 million senior unsecured revolving credit facility matures in December 2027. Of the $1.5 billion aggregate commitment under its other revolving credit facility, $1.4 billion matures in August 2028 and $48 million matures in August 2027. Previously, in March 2026, the Company had executed amendments to each facility which modified certain change of control provisions to permit direct or indirect ownership of the Company by Global Infrastructure Management, LLC, EQT Fund Management S.à r.l., Qatar Investment Authority, and certain investment vehicles affiliated with any of the foregoing or with funds, accounts, or other entities managed, advised, or controlled by any of the foregoing. As of September 30, 2026, AES had $560 million in outstanding borrowings under its revolving credit facilities.

Non-Recourse Debt — Non-recourse debt represents debt issued by one of our subsidiaries and is only required to be repaid solely from the subsidiary's assets. Repayments of the loans, and interest thereon, are secured solely by the capital stock, physical assets, contracts, and cash flows of one of our subsidiaries, and the Parent Company is not otherwise liable for such debt. Non-recourse debt balances on the Condensed Consolidated Balance Sheet include$2 billion of current and$12.8 billion of noncurrent non-recourse debt related to VIEs as of September 30, 2026.

During the nine months ended September 30, 2026, the Company’s following subsidiaries had significant debt issuances (in millions):

SubsidiaryIssuances (1)
AES Clean Energy2,007
AES Pacifico Chile597
AES España550
AES Andes400

(1)These amounts do not include revolving credit facility activity at the Company’s subsidiaries.

AES España —In July 2026, AES España issued $500 million aggregate principal of 7.75% senior notes due August 2033. The net proceeds of this issuance were used to repay existing indebtedness, including the full repayment of $300 million outstanding on its senior notes due 2028 and partial repayment of $200 million outstanding of local bonds due 2027. As a result of the refinancing, the Company recognized a loss on extinguishment of debt of $2 million.

AES Andes —In July 2026, AES Andes entered into a $400 million syndicated term loan facility maturing in July 2031. The Company used proceeds from the issuance to repay $360 million of existing indebtedness, including amounts outstanding under its 2021 and 2022 credit facilities. As a result of the transaction, the Company recognized a loss on extinguishment of debt of $1 million.

In March 2025, AES Andes issued $400 million aggregate principal of 6.25% senior notes due in 2032. The net proceeds from the issuance were used to redeem the remaining $228 million aggregate principal of its 6.35% junior

25 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

subordinated notes due in 2079 and to repay other existing indebtedness. As a result of the latter transaction, the Company recognized a loss on extinguishment of debt of $3 million.

AES Pacifico Chile — During the years ended December 31, 2025 and 2024, several renewables development projects owned by AES Pacifico Chile executed project financing agreements with aggregate commitments of up to $1.7 billion to support the development and construction of wind and solar plants. As of September 30, 2026, there were $1.4 billion in borrowings under the agreements, maturing in 2027, 2029, and 2030.

AES Clean Energy— In May 2026, Four Horizons Seller, LLC and Four Horizons FinCo, LLC, subsidiaries of AES Clean Energy Development, executed a construction, tax equity bridge, and letter of credit financing agreement for commitments of up to $2.2 billion. As of September 30, 2026, there were $644 million in borrowings maturing in 2029.

In December 2024, Bellefield 2 Seller, LLC executed a construction, tax equity bridge, and letter of credit financing agreement for commitments of up to $1.7 billion. As of September 30, 2026, there were $1.4 billion in borrowings maturing in 2026 and 2027.

AES Clean Energy Development, AES Renewable Holdings, and sPower, an equity method investment, collectively referred to as the Issuers, entered into a Master Indenture agreement in 2022 whereby long-term notes will be issued from time to time to finance or refinance operating wind, solar, and energy storage projects that are owned by the Issuers. Each of the Issuers is considered a “Co-Issuer” and will be jointly and severally liable with each other Co-Issuer for all obligations under the facility. In July 2026, the Co-Issuers issued $1.2 billion in 6.83% notes due May 2051 under the Master Indenture. Proceeds from the issuance were used to repay outstanding construction debt, resulting in a $10 million loss on debt extinguishment. As of September 30, 2026, the aggregate principal outstanding for the Co-Issuers was $4.4 billion. As a result of the notes issued in 2026 and net of repayments, AES Clean Energy Development and AES Renewable Holdings recorded, in aggregate, an increase in liabilities of $1.1 billion, resulting in an aggregate carrying amount of notes at consolidated subsidiaries of $3.6 billion as of September 30, 2026.

AES Clean Energy Development, AES Renewable Holdings, and sPower, collectively referred to as the Borrowers, executedtwo Credit Agreements for revolving credit facilities in 2021 and subsequent amendments in the following years for aggregate commitments of up to $4 billion with maturity dates in May and June 2028. Each of the Borrowers is considered a “Co-Borrower” and will be jointly and severally liable with each other Co-Borrower for all obligations under the facilities. As a result of increases in commitments used and net of repayments, AES Clean Energy Development and AES Renewable Holdings recorded, in aggregate, an increase in liabilities of $1.6 billion in 2026, resulting in total commitments used under the revolving credit facilities, as of September 30, 2026, of $3.2 billion at consolidated subsidiaries. As of September 30, 2026, the aggregate commitments used under the revolving credit facilities for the Co-Borrowers was $3.3 billion.

AES Ohio — In August 2025, AES Ohio issued $375 million aggregate principal of 4.55% First Mortgage Bonds due August 2030. The net proceeds from this issuance were used to repay existing indebtedness, including its unsecured $150 million term loan due in October 2025 and $195 million outstanding under its revolving credit agreement maturing in March 2030, and for general corporate purposes at AES Ohio.

AES Indiana — In August 2025, AES Indiana issued $350 million aggregate principal of 5.05% First Mortgage Bonds due August 2035. The net proceeds from this issuance were used to repay existing indebtedness, including the remaining $300 million outstanding on its unsecured term loan due in October 2025 and $30 million outstanding under its revolving credit agreement maturing in March 2030, and for general corporate purposes at AES Indiana.

AES El Salvador — In July 2025, our distribution companies operating in El Salvador entered into a credit agreement for $341 million, bearing interest at 3-month SOFR plus 3.50%, maturing in 2032. The net proceeds were used to repay existing indebtedness of $206 million, with the remainder used for dividend distributions. As a result of the refinancing, the Company recognized a loss on extinguishment of $1 million.

Marahu— The Marahu project is currently constructing the Salinas and Jobos renewables projects in Puerto Rico, including both solar and energy storage facilities. In July 2025, the Marahu project executed a tax credit transfer bridge loan agreement for total commitments of $230 million, at interest rates of SOFR plus a margin of 1.25% to 2.25%, maturing in April 2027. As of September 30, 2026, there was $215 million in borrowings under the agreement.

In October 2024, the Marahu project obtained a loan guarantee for $861 million from the U.S. Department of Energy and began drawing on the loan in the first quarter of 2025. As of September 30, 2026, there was $875 million, inclusive of paid-in-kind interest, in outstanding borrowings, maturing in 2049.

26 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

AES Puerto Rico —On June 1, 2023, AES Puerto Rico was unable to pay principal and interest obligations on its Series A Bond Loans due to insufficient funds resulting from financial difficulties at the business. AES Puerto Rico signed forbearance and standstill agreements with its noteholders in July 2023 because of the insufficiency of funds to meet these obligations. On March 5, 2024, AES Puerto Rico and its noteholders executed a financial restructuring, under which the $156 million (including interest) of 6.625% Series A Bond Loans due 2026 was exchanged for $112 million of 6.625% senior secured bonds due January 2028 and $44 million of preferred shares in AES Puerto Rico. The preferred shares bear interest at 3.125% and contain an option whereby AES may call the preferred shares to be converted into 99.9% of the ordinary shares of AES Puerto Rico between December 30, 2025 and December 30, 2027, or would have the option to settle the preferred shares in cash. AES Puerto Rico is required to make mandatory prepayments through cash sweeps based on excess cash (as defined in the loan agreements) available from operations on the senior secured bonds and preferred shares interest. The financial restructuring was accounted for as a troubled debt restructuring in accordance with ASC 470-60, “Troubled Debt Restructurings by Debtors”as AES Puerto Rico was experiencing financial difficulties and the lenders granted a concession. No gain was recognized as a result of this transaction. As of September 30, 2026, cash settlement of the preferred shares is contingent, as the amounts would not be required to be settled in cash if the option to settle the preferred shares with common shares is exercised.

Non-Recourse Debt Covenants, Restrictions, and Defaults — The terms of the Company's non-recourse debt include certain financial and nonfinancial covenants. These covenants are limited to subsidiary activity and vary among the subsidiaries. These covenants may include, but are not limited to, maintenance of certain reserves and financial ratios, minimum levels of working capital, and limitations on incurring additional indebtedness.

As of September 30, 2026 and December 31, 2025, approximately $521 million and $531 million, respectively, of restricted cash was maintained in accordance with certain covenants of the non-recourse debt agreements. Of these amounts, $410 million and $451 million, respectively, were included within Restricted cash and $111 million and $80 million, respectively, were included within Debt service reserves and other deposits in the accompanying Condensed Consolidated Balance Sheets. As of September 30, 2026 and December 31, 2025, approximately $155 million and $153 million, respectively, of the restricted cash balances were for collateral held to cover potential liability for current and future insurance claims being assumed by AGIC, AES' captive insurance company. Of total restricted cash and debt service reserves of $715 million, $393 million related to VIEs as of September 30, 2026.

Various lender and governmental provisions restrict the ability of certain of the Company's subsidiaries to transfer their net assets to the Parent Company. Such restricted net assets of subsidiaries amounted to approximately $2.1 billion at September 30, 2026.

The following table summarizes the Company’s subsidiary non-recourse debt in default (in millions) as of September 30, 2026. Due to the defaults, these amounts are included in the current portion of non-recourse debt unless otherwise indicated:

SubsidiaryPrimary Nature of DefaultDebt in DefaultNet Assets
AES Ilumina (Puerto Rico)Covenant$18$34

The above default is not a payment default, but is instead a technical default triggered by failure to comply with covenants or other requirements contained in the non-recourse debt documents of the applicable subsidiary.

The AES Corporation’s recourse debt agreements include cross-default clauses that will trigger if a subsidiary provides 20% or more of the Parent Company’s total cash distributions from businesses for the four most recently completed fiscal quarters and has an outstanding principal in excess of $200 million in default. As of September 30, 2026, the Company’s subsidiaries hadno defaults which resulted in a cross-default under the recourse debt of the Parent Company. In the event the Parent Company is not in compliance with the financial covenants of its revolving credit facility, restricted payments will be limited to regular quarterly shareholder dividends at the then-prevailing rate. Payment defaults and bankruptcy defaults would preclude the making of any restricted payments.

Supplier Financing Arrangements— With some purchases, the Company enters into supplier financing arrangements with the goal of securing improved payment terms. The Company confirms supplier invoices to an intermediary financial institution who will pay the supplier directly or reimburse the Company for payments made to the supplier. These arrangements are included in Supplier financing arrangements on the Condensed Consolidated Balance Sheets in Current liabilities as the amounts are all due in less than a year; the related interest expense is recorded on the Condensed Consolidated Statements of Operations within Interest expense.

The Company had total outstanding balances of $461 million as of September 30, 2026. These agreements ranged from less than $1 million to $56 million with a weighted average interest rate of 6.46%. Of the amounts

27 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

outstanding under supplier financing arrangements as of September 30, 2026, $286 million were guaranteed, including $56 million guaranteed by the Parent Company and $230 million guaranteed by subsidiaries.

The Company had total outstanding balances of $616 million as of December 31, 2025. These agreements ranged from less than $1 million to $51 million with a weighted average interest rate of 6.72%. Of the amounts outstanding under supplier financing arrangements as of December 31, 2025, $391 million were guaranteed, including $204 million guaranteed by the Parent Company and $187 million guaranteed by subsidiaries.

  1. COMMITMENTS AND CONTINGENCIES

Guarantees, Letters of Credit, and Surety Bonds — In connection with certain project financings (including tax equity transactions), acquisitions and dispositions, power purchases, EPC contracts, tax credit transfers, and other agreements, the Parent Company and its subsidiaries have expressly undertaken limited obligations and commitments, most of which will only be effective or will be terminated upon the occurrence of future events. In the normal course of business, the Parent Company and its subsidiaries have entered into various agreements, mainly guarantees and letters of credit, to provide financial or performance assurance to third parties on behalf of AES businesses. It is unlikely that the Parent Company or its subsidiaries would be required to perform or otherwise incur any material losses associated with guarantees of subsidiaries' or affiliates' obligations. These agreements are entered into primarily to support or enhance the creditworthiness otherwise achieved by a business on a stand-alone basis, thereby facilitating the availability of sufficient credit to accomplish their intended business purposes. Most of the contingent obligations relate to future performance commitments which the Company expects to fulfill within the normal course of business. Our tax equity and tax credit transfer guarantees typically consist of standard indemnifications of tax equity partners or tax credit purchasers in the event that an adverse determination arises due to a recapture event, tax controversy, or any breach by the AES project company of the representations in the shared equity agreement. The expiration dates of these guarantees vary from less than 1 year to no more than 25 years.

The following table summarizes the Parent Company’s consolidated contingent contractual obligations as of September 30, 2026. Amounts presented in the following table represent the Parent Company’s current undiscounted exposure to guarantees and the range of maximum undiscounted potential exposure per individual agreement. The maximum exposure is not reduced by the amounts, if any, that could be recovered under the recourse or collateralization provisions in the guarantees.

Parent Company Contingent Contractual ObligationsMaximum Exposure(in millions)Number of AgreementsMaximum Exposure Range for Each Agreement (in millions)
Guarantees and commitments (1)$5,12524< $1 — 894
Letters of credit under bilateral agreements25410< $1 — 64
Letters of credit under the unsecured credit facilities1749< $1 — 60
Letters of credit under the revolving credit facility814< $1 — 4
Total$5,56157

(1)Excludes payment obligation and commercial transaction arrangements entered into by the Parent Company on behalf of its consolidated subsidiaries, which relate to the Company's own future performance.

The following table summarizes our subsidiaries’ consolidated contingent contractual obligations as of September 30, 2026. These contingent contractual obligations are issued at the subsidiary level and are non-recourse to the Parent Company. Amounts presented in the following table represent our subsidiaries' current undiscounted exposure to guarantees and the range of maximum undiscounted potential exposure per individual agreement. The maximum exposure is not reduced by the amounts, if any, that could be recovered under the recourse or collateralization provisions in the guarantees.

Subsidiary Contingent Contractual ObligationsMaximum Exposure (in millions)Number of AgreementsMaximum Exposure Range for Each Agreement (in millions)
Guarantees and commitments$3,98342< $1 — 569
Letters of credit under subsidiary credit facilities2,052379< $1 — 85
Surety bonds86105< $1 — 10
Total$6,121526

Contingencies

Environmental— The Company periodically reviews its obligations as they relate to compliance with environmental laws, including site restoration and remediation. As of both September 30, 2026 and December 31, 2025, the Company recognized liabilities of $1 million for projected environmental remediation costs. These

28 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

amounts are reported on the Condensed Consolidated Balance Sheets within Accrued and other liabilities and Other noncurrent liabilities. Due to the uncertainties associated with environmental assessment and remediation activities, future costs of compliance or remediation could be higher or lower than the amount currently accrued. Moreover, where no liability has been recognized, it is reasonably possible that the Company may be required to incur remediation costs or make expenditures in amounts that could be material but could not be estimated as of September 30, 2026. Unasserted claims are not included in the range of potential losses related to environmental matters until it is probable that a claim will be asserted and there is a reasonable possibility that the outcome will be unfavorable. In aggregate, the Company estimates the range of potential losses related to environmental matters, where estimable, to be between $1 million and $5 million. The amounts considered reasonably possible do not include the amounts accrued, as discussed above.

Litigation— The Company is involved in certain claims, suits, and legal proceedings in the normal course of business. The Company accrues for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company has recognized aggregate liabilities for all claims of approximately $15 million and $22 million as of September 30, 2026 and December 31, 2025, respectively. These amounts are reported on the Condensed Consolidated Balance Sheets within Accrued and other liabilities and Other noncurrent liabilities. A significant portion of these accrued liabilities relate to regulatory matters and commercial disputes in international jurisdictions. There can be no assurance that these accrued liabilities will be adequate to cover all existing and future claims or that we will have the liquidity to pay such claims as they arise.

Where no accrued liability has been recognized, it is reasonably possible that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material but could not be estimated as of September 30, 2026. The material contingencies where a loss is reasonably possible primarily include disputes with offtakers, suppliers and EPC contractors; alleged breaches of contract; alleged violation of laws and regulations; income tax and non-income tax matters with tax authorities (including but not limited to tax disputes in Brazil and El Salvador); and regulatory matters. In aggregate, the Company estimates the range of potential losses, where estimable, related to these reasonably possible material contingencies to be between $98 million and $172 million. Included in this range is a reasonably possible legal contingency for environmental remediation costs related to Sul, a business the Company disposed of in 2016, estimated to be approximately R$15 million to R$60 million ($3 million to $12 million). The amounts considered reasonably possible do not include the amounts accrued, as discussed above. These material contingencies do not include income tax-related contingencies which are considered part of our uncertain tax positions.

  1. LEASES

LESSOR— The Company has operating leases for certain generation contracts that contain provisions to provide capacity to a customer, which is a stand-ready obligation to deliver energy when required by the customer. Capacity obligations are generally considered lease elements as they cover the majority of available output from a facility. The allocation of contract payments between the lease and non-lease elements is made at the inception of the lease. Lease receipts from such contracts are recognized as lease revenue on a straight-line basis over the lease term, whereas variable lease receipts are recognized when earned.

The following table presents lease revenue from operating leases in which the Company is the lessor, recognized in Revenue on the Condensed Consolidated Statements of Operations for the periods indicated (in millions):

Three Months Ended September 30,Nine Months Ended September 30,
Operating Lease Revenue2026202520262025
Non-variable lease revenue$39$84$173$241
Variable lease revenue29287471
Total lease revenue$68$112$247$312

29 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

The following table presents the underlying gross assets and accumulated depreciation of operating leases included in Property, plant, and equipment, neton the Condensed Consolidated Balance Sheets as of the dates indicated (in millions):

Property, Plant, and Equipment, NetSeptember 30, 2026December 31, 2025
Gross assets$1,910$1,923
Less: Accumulated depreciation(276)(231)
Net assets$1,634$1,692

The option to extend or terminate a lease is based on customary early termination provisions in the contract, such as payment defaults, bankruptcy, or lack of performance on energy delivery. The Company has not recognized any early terminations as of September 30, 2026. Certain leases may provide for variable lease payments based on usage or index-based (e.g., the U.S. Consumer Price Index) adjustments to lease payments.

The following table shows the future lease receipts as of September 30, 2026 for the remainder of 2026 through 2030 and thereafter (in millions):

Future Cash Receipts for
Sales-Type Leases · Operating Leases
2026$17$19
20276364
2028631
2029631
203063—
Thereafter945—
Total$1,214$85
Less: Imputed interest(621)
Present value of total lease receipts$593

Battery Storage Lease Arrangements — The Company constructs and operates projects consisting only of a stand-alone BESS facility, as well as projects that pair a BESS with solar energy systems. These projects allow more flexibility on when to provide energy to the grid. The Company enters into PPAs for the full output of the facility which allow customers the ability to determine when to charge and discharge the BESS. Generally, these arrangements include both lease and non-lease elements under ASC 842, with the BESS component typically constituting a sales-type lease. Losses recognized on the commencement of sales-type leases primarily relate to the exclusion of the value of ITCs from the fair value of the renewable asset, which is used in the determination of the rate implicit in the lease. This results in a higher discount rate, which reduces the lease receivable to an amount below the carrying value of the associated lease asset, resulting in a pre-tax loss on commencement.

The following table presents variable lease revenue, interest income, and net losses on commencement of sales-type leases in which the Company is the lessor, for the periods indicated (in millions):

Three Months Ended September 30,Nine Months Ended September 30,
Sales-Type Leases2026202520262025
Variable lease revenue$—$1$1$2
Interest income2173619
Net losses on commencement of sales-type leases (1)—(13)(44)(221)

(1)Gains and losses are recognized in Other income and Other expense, respectively, in the Condensed Consolidated Statements of Operations. See Note 15—Other Income and Expense for further information.

  1. REDEEMABLE STOCK OF SUBSIDIARIES

Noncontrolling interests with redemption features that are not solely within the control of the issuer are classified as temporary equity and are included in Redeemable stock of subsidiaries on the Condensed Consolidated Balance Sheets. Generally, these instruments are initially measured at fair value and are subsequently adjusted for income and dividends allocated to the noncontrolling interest. Subsequent measurement varies depending on whether the instrument is probable of becoming redeemable. For those securities that are currently redeemable or where it is probable that the instrument will become redeemable, any changes from the carrying value to redemption value are recognized in temporary equity against Retained earnings or Additional paid-in capitalin the absence of retained earnings. When the instrument is not probable of becoming redeemable, no adjustment to the carrying value is recognized.

30 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

The following table is a reconciliation of changes in redeemable stock of subsidiaries for the periods indicated (in millions):

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
Balance at the beginning of the period$3,052$2,179$2,824$938
Net income (loss)25(65)(12)(32)
Other comprehensive income (loss)—(4)—(4)
Adjustments to redemption value of redeemable stock of subsidiaries1271217
Reclassification of redeemable stock of subsidiaries to noncontrolling interests(3)(51)(3)(107)
Distributions to holders of redeemable stock of subsidiaries(30)(23)(133)(64)
Acquisitions of redeemable stock of subsidiaries——(1)—
Contributions from holders of redeemable stock of subsidiaries44—107168
Sales of redeemable stock of subsidiaries—2194689
Issuance of preferred shares in subsidiaries—77112517
Balance at the end of the period$3,100$2,122$3,100$2,122

The following table summarizes the Company’s redeemable stock of subsidiaries balances as of the dates indicated (in millions):

September 30, 2026December 31, 2025
IPALCO common stock$1,034$1,003
AES Ohio common stock652595
AES Global Insurance preferred stock456472
Bellefield 2 Equity Holdings preferred stock269249
AES Clean Energy tax equity partnerships249228
Desarrollos Renovables preferred stock22578
AES DevCo HoldCo preferred stock215199
Total redeemable stock of subsidiaries$3,100$2,824

Desarrollos Renovables — On August 5, 2025, AES Pacifico, our wholly-owned subsidiary in Chile, executed a renewables partnership agreement with Global Infrastructure Management, LLC (“GIP”) for the sale of a 49% ownership interest in AES Desarrollos Renovables SpA (“Desarrollos Renovables”) for total consideration of $77 million. Under the partnership agreement, AES Pacifico will contribute a specified pipeline of renewable development projects to Desarrollos Renovables, and GIP may make additional contributions to maintain its 49% ownership interest. At the execution date, AES Pacifico contributed the Andes Solar III and Punta del Sol renewable development projects to Desarrollos Renovables. In March 2026, AES Pacifico contributed the Cristales, Pampas, and Atacama Solar renewables projects to Desarrollos Renovables, and GIP contributed an additional $112 million to maintain its 49% ownership interest, resulting in an increase to Redeemable stock of subsidiaries. AES Pacifico retained a 51% ownership interest in Desarrollos Renovables. The partnership agreement contains certain redemption features that expire upon certain agreed-upon project milestones being achieved. While not currently in effect, the redemption features are not solely in AES’ control. As a result, the noncontrolling ownership interest is considered temporary equity. The Company has concluded it is probable that these projects will reach the specified milestones. Therefore, the noncontrolling ownership interests are not probable of becoming redeemable and subsequent adjustments to the carrying value were not required. Desarrollos Renovables is reported in the Renewables SBU reportable segment.

AES Clean Energy Tax Equity Partnerships— The majority of solar projects in the U.S. have been financed with tax equity structures, in which tax equity investors receive a portion of the economic attributes of the facilities, including tax attributes, which vary over the life of the projects. The substance of such arrangements is that of a preferred structure, whereby tax equity investors are granted preferential returns in the form of significant earnings and tax allocations from the partnership, until a specified internal rate of return is achieved.

In some cases, these agreements contain certain partnership rights, though not currently in effect, which may enable the tax equity investor to exit in the future. As a result, the noncontrolling ownership interest is considered temporary equity. Some of these tax equity partnership agreements have redemption features dependent upon the passage of time, therefore the noncontrolling ownership interests are probable of becoming redeemable. As of September 30, 2026 and 2025, the redemption value of the noncontrolling interest associated with one of the tax equity partnerships exceeded the carrying value; as such, an adjustment of $12 million and $7 million, respectively, was recorded to Redeemable stock of subsidiarieson the Condensed Consolidated Balance Sheets to increase the carrying value to the redemption value. Certain other tax equity partnership agreements have redemption features that expire upon certain agreed-upon project milestones being achieved. The Company has concluded it is probable

31 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

that these projects will reach the specified milestones, therefore the noncontrolling ownership interests are not probable of becoming redeemable and subsequent adjustments to the carrying value were not required.

During the nine months ended September 30, 2026 and 2025, AES Clean Energy, through multiple transactions, sold noncontrolling interests in project companies to tax equity investors, resulting in increases to Redeemable stock of subsidiariesof $194 million and $152 million, respectively, net of transaction costs.

During the nine months ended September 30, 2026 and 2025, certain renewables development projects with redemption features were placed in service, resulting in the expiration of the redemption features. As a result, noncontrolling ownership interests of $3 million and $69 million, respectively, were reclassified from Redeemable stock of subsidiariesto Noncontrolling interestson the Condensed Consolidated Balance Sheets. AES Clean Energy is reported in the Renewables SBU reportable segment.

AES Global Insurance— On April 30, 2025, the Company sold minority interests in AES Global Insurance Company, LLC (“AGIC”), AES’ captive insurance company, and AGIC Holdings, LLC (together with AGIC, the “AGIC Companies”) in exchange for $450 million in total proceeds for Class B units representing 17.5% and 18.0%, respectively, of each entity’s total outstanding units, for a combined ownership (directly and indirectly) of AGIC’s total outstanding units of 32.4% by the Class B Member. The Company continues to own Class A units for the remaining economic interest in the AGIC Companies. The Class B units provide for target distribution amounts for the Class B Member, with a call option for AES for years 2030 through 2035 to redeem these units at pre-agreed redemption prices.

As the agreement contains certain redemption features that may require future redemption of the Class B units and are not solely in AES’ control, the noncontrolling interest is considered temporary equity. The contractual target rate of return increases the redemption price on the Class B units and the annual distributions reduce the applicable redemption price. Annual dividends are subject to regulatory and the AGIC Companies Boards’ approval. Through March 31, 2045, the AGIC Companies Boards will approve distributions to the Class B Member to the extent that there is sufficient cash generated from operations each annual period. After March 31, 2045, all dividends are discretionary if the Class B units remain outstanding. It is probable that the AGIC Companies’ performance will generate sufficient cash to require distributions to be made to the Class B Member of an amount that would redeem the instrument after the call option period. Therefore, the noncontrolling interest is probable of becoming redeemable and the carrying value of the Class B units will be adjusted to equal the redemption value each reporting period. As of September 30, 2025, the redemption value of the noncontrolling ownership interest of $464 million exceeded the carrying value; as such, an adjustment of $10 million was recorded to Redeemable stock of subsidiaries on the Condensed Consolidated Balance Sheets to increase the carrying value to the Class B units’ redemption value. As of September 30, 2026, the redemption value of the noncontrolling ownership interest of $456 million equaled the carrying value; as such, no adjustment to the carrying value was necessary. The AGIC Companies are reported in Corporate and Other.

As part of the transaction, it is required that either (i) the AGIC Companies achieve a minimum distribution target to the Class B Member ranging from $146 million to $199 million over pre-defined periods of time ranging from three to five years (the “distribution period”) or (ii) AGIC achieves an average cash basis quarterly net income threshold for the period comprising the relevant distribution period and the four quarters immediately prior to the start of such distribution period. AES can make disproportionate distributions to the Class B Member to meet the minimum distribution target for the distribution period. If, at the end of a distribution period, (1) such cash basis net income threshold is not met and (2) the minimum distribution target for such distribution period is not achieved, AES would be required to address the shortfall by issuing AES common stock (“Shortfall Stock”) to AGIC for the net difference between actual and targeted distributions. Distributions of cash from the sale of Shortfall Stock are subject to regulatory approval and at the discretion of AES.

AES Ohio— On April 4, 2025, DPL sold an indirect equity interest in AES Ohio of approximately 30% to Astrid Holdings LP, a wholly-owned subsidiary of La Caisse, for total proceeds of approximately $544 million, resulting in an increase to Redeemable stock of subsidiaries of $538 million, net of transaction costs. The Company also recognized an increase to additional paid-in capital and a reduction to retained earnings of $188 million for the excess of the fair value of the shares over the share of the net assets sold. The agreement contains certain redemption features that, while not currently in effect, are not solely in AES’ control. As a result, the noncontrolling ownership interest is considered temporary equity. The Company has concluded that the likelihood of an event that would allow La Caisse to redeem its interest under the terms of the shareholder agreement is not probable, but would require redemption at fair value. Therefore, as of September 30, 2026, the noncontrolling ownership interest is not probable of becoming redeemable and subsequent adjustments to the carrying value were not required. AES Ohio is reported in the Utilities SBU reportable segment.

32 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

AES Indiana Pike County BESS— The redemption feature of the tax equity partnership agreement was contingent upon the underlying assets being placed in service by a guaranteed date. In March 2025, the Pike County BESS project was placed in service, resulting in the expiration of the redemption feature. As a result, the noncontrolling ownership interest of $38 million was reclassified from Redeemable stock of subsidiariesto Noncontrolling interests on the Condensed Consolidated Balance Sheets. AES Indiana is reported in the Utilities SBU reportable segment.

  1. EQUITY

Equity Transactions with Noncontrolling Interests

Marahu— In June 2026, the Company sold a preferred membership interest in CleanFlex Puerto Rico Partners, LLC (“Marahu”) to TotalEnergies (“Total”), resulting in a $169 million increase to NCI. Marahu is a holding company over the Jobos and Salinas renewables development projects in Puerto Rico, and is reported in the Renewables SBU reportable segment.

Cochrane —In May 2025, the Company acquired the remaining 40% of the common shares in Empresa Electrica Cochrane SpA (“Cochrane”), a coal-fired plant in Chile, from a third-party investor for $89 million, increasing AES’ ownership in Cochrane to 96.7%. This transaction resulted in a $40 million decrease in Parent Company Stockholder’s Equity due to a decrease in additional paid-in-capital of $23 million and a reclassification of accumulated other comprehensive losses from NCI to AOCL of $17 million.

In February 2026, AES Andes acquired all of the outstanding preferred shares in Cochrane for $29 million, increasing AES’ effective ownership in Cochrane to 99.6%. Cochrane is reported in the Energy Infrastructure SBU reportable segment.

AES Indiana Petersburg Energy Center —In February 2026, AES Indiana sold additional noncontrolling interests in the Petersburg Energy Center project to the tax equity investor, resulting in a $120 million increase to NCI. AES Indiana is reported in the Utilities SBU reportable segment.

AES Clean Energy Tax Equity Partnerships —The majority of solar projects in the U.S. have been financed with tax equity structures, in which tax equity investors receive a portion of the economic attributes of the facilities, including tax attributes, which vary over the life of the projects. The substance of such arrangements is that of a preferred structure, whereby tax equity investors are granted preferential returns in the form of significant earnings and tax allocations from the partnership, until a specified internal rate of return is achieved.

During the nine months ended September 30, 2026 and 2025, AES Clean Energy Development and AES Renewable Holdings, through multiple transactions, sold noncontrolling interests in project companies to tax equity investors, resulting in increases to NCI of $68 million and $434 million, respectively. During the third quarter of 2025, AES Renewable Holdings completed buyouts of tax equity partners at Buffalo Gap I, Buffalo Gap II, and Buffalo Gap III, resulting in a decrease to NCI of $28 million and a decrease to additional paid-in capital of $42 million. AES Clean Energy Development and AES Renewable Holdings are reported in the Renewables SBU reportable segment.

AES Indiana Pike County BESS —In March 2025, as a result of the Pike County BESS project being placed in service, the noncontrolling ownership interest of $38 million was reclassified from Redeemable stock of subsidiariesto Noncontrolling interests on the Condensed Consolidated Balance Sheets. See Note 11—Redeemable Stock of Subsidiaries for further information. Subsequently, AES Indiana sold additional noncontrolling interests to the tax equity investor, resulting in a $150 million increase to NCI. AES Indiana is reported in the Utilities SBU reportable segment.

Chile Renovables— In December 2023, Chile Renovables issued $275 million of preferred shares to Global Infrastructure Management, LLC (“GIP”), the proceeds of which are being used to fund the development of an additional pipeline of renewables projects. Under the terms of the operating agreement, GIP receives an escalating specified internal rate of return up until the point the projects reach commercial operations. As each project reaches commercial operations, the preferred shares convert to common stock and GIP may make additional contributions to maintain its 49% ownership interest. In February 2025, the Andes Solar 2a BESS project reached commercial operations. The preferred shares were converted to common stock and GIP made additional contributions of $14 million, resulting in an increase to NCI of $17 million and a decrease to additional paid-in capital of $3 million. In December 2025, Chile Renovables issued an additional $16 million of preferred shares to GIP, the proceeds of which were used to fund the development of the Bolero BESS project. In August 2026, the Bolero BESS project reached commercial operations. The preferred shares were converted to common stock and GIP made additional contributions of $54 million, resulting in an increase to NCI of $56 million and a decrease to additional paid-in capital

33 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

of $2 million. As the Company maintained control after these transactions, Chile Renovables continues to be consolidated by the Company within the Renewables SBU reportable segment.

The following table summarizes the net income (loss) attributable to The AES Corporation and all transfers (to) from noncontrolling interests for the periods indicated (in millions):

Nine Months Ended September 30,
20262025
Net income attributable to The AES Corporation$1,466$590
Transfers (to) from noncontrolling interest:
Increase (decrease) in The AES Corporation's paid-in capital for sale of subsidiary shares(8)180
Additional paid-in-capital transferred to redeemable stock of subsidiaries (1)—(188)
Decrease in The AES Corporation's paid-in capital for acquisition of subsidiary shares(1)(62)
Net transfers (to) from noncontrolling interest(9)(70)
Change from net income attributable to The AES Corporation and transfers (to) from noncontrolling interests$1,457$520

(1)See Note 11—Redeemable Stock of Subsidiaries for further information on increase in paid-in capital transferred to redeemable stock of subsidiaries.

Accumulated Other Comprehensive Loss—The following table summarizes the changes in AOCL by component, net of tax and NCI, for the nine months ended September 30, 2026 (in millions):

Foreign currency translation adjustments, netChange in fair value of derivatives, netPension adjustments, netChange in fair value option liabilities, netTotal
Balance at the beginning of the period$(1,168)$483$(16)$3$(698)
Other comprehensive income before reclassifications17435——452
Amount reclassified to earnings—(7)—(3)(10)
Other comprehensive income17428—(3)442
Reclassification from NCI due to share repurchases—1——1
Balance at the end of the period$(1,151)$912$(16)$—$(255)

Reclassifications out of AOCL are presented in the following table. The Company’s accounting policy for releasing the income tax effects from AOCL occurs on a portfolio basis. Amounts for the periods indicated are in millions and those in parentheses indicate debits to the Condensed Consolidated Statements of Operations:

AOCL Components · Three Months Ended September 30, · Nine Months Ended September 30,
2026 · 2025 · 2026 · 2025
Change in fair value of derivatives, net
Non-regulated revenue$(2)$—$3$—
Non-regulated cost of sales—(4)(4)(2)
Interest expense—2(2)12
Foreign currency transaction losses—136
Income (loss) from continuing operations before taxes and equity in earnings of affiliates(2)(1)—16
Income tax benefit(1)—(3)(12)
Net equity in earnings (losses) of affiliates—2—2
Net income (loss)(3)1(3)6
Less: Net loss attributable to noncontrolling interests and redeemable stock of subsidiaries3—104
Net income (loss) attributable to The AES Corporation—1710
Change in fair value option liabilities, net
Gain on disposal and sale of business interests3—3—
Net income (loss) attributable to The AES Corporation3—3—
Total reclassifications out of AOCL for the period, net of income tax and noncontrolling interests$3$1$10$10

Common Stock Dividends — The Parent Company paid dividends of $0.17595 per outstanding share to its common stockholders during the first, second, and third quarters of 2026 for dividends declared in December 2025, February 2026, and July 2026, respectively.

On October 8, 2026, the Board of Directors declared a quarterly common stock dividend of $0.17595 per share payable on November 13, 2026 to shareholders of record at the close of business on October 30, 2026.

34 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

  1. SEGMENTS

The segment reporting structure uses the Company’s management reporting structure as its foundation to reflect how the Company manages the businesses internally. The management reporting structure is composed offour SBUs, mainly organized by technology, led by our Chief Executive Officer, who is our Chief Operating Decision Maker. Using the accounting guidance on segment reporting, the Company determined that itsfour operating segments are aligned with itsfour reportable segments corresponding to its SBUs. In March 2026, the Company announced changes in its internal management structure, including a change in its President. These changes did not result in a change to our Chief Operating Decision Maker or to the Company’s operating or reportable segments.

Renewables —Solar, wind, energy storage, and hydro generation facilities;

Utilities —AES Indiana, AES Ohio, and AES El Salvador regulated utilities and their generation facilities;

Energy Infrastructure —Natural gas, LNG, coal, pet coke, diesel, and oil generation facilities; and

New Energy Technologies —Investments in Fluence, Maximo, the AI Fund, and other new and innovative energy technology businesses.

Our Renewables, Utilities, and Energy Infrastructure SBUs participate in our generation business line, in which we own and/or operate power plants to generate and sell power to customers, such as utilities, industrial users, and other intermediaries. Our Utilities SBU participates in our utilities business line, in which we own and/or operate utilities to generate or purchase, distribute, transmit, and sell electricity to end-user customers in the residential, commercial, industrial, and governmental sectors within a defined service area. In certain circumstances, our utilities also generate and sell electricity on the wholesale market. Our New Energy Technologies SBU includes investments in new and innovative technologies to support leading-edge greener energy solutions.

Included in “Corporate and Other” are the results of AES Global Insurance Company, LLC ("AGIC"), AES' captive insurance company, corporate overhead costs which are not directly associated with the operations of ourfour reportable segments, and certain intercompany charges such as self-insurance premiums which are fully eliminated in consolidation.

The Company uses Adjusted EBITDA as its primary segment performance measure. Adjusted EBITDA, a non-GAAP measure, is defined by the Company as earnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, adjusted for the impact of NCI and interest, taxes, depreciation, amortization, and accretion of AROs of our equity affiliates, and adding back interest income recognized under service concession arrangements; excluding gains or losses of both consolidated entities and entities accounted for under the equity method due to (a) unrealized gains or losses pertaining to derivative transactions, equity securities, and financial assets and liabilities measured using the fair value option; (b) unrealized foreign currency gains or losses; (c) gains, losses, benefits, and costs associated with dispositions and acquisitions of business interests, including early plant closures, and gains and losses recognized at commencement of sales-type leases; (d) losses due to impairments; (e) gains, losses, and costs due to the early retirement of debt or troubled debt restructuring; (f) costs directly associated with a major restructuring program, including, but not limited to, workforce reduction efforts; and (g) costs directly associated with the Merger, including, but not limited to, advisory, legal, and employee-related costs.

The Company has concluded Adjusted EBITDA better reflects the underlying business performance of the Company and is the most relevant measure considered in the Company's internal evaluation of the financial performance of its segments. Additionally, given its large number of businesses and overall complexity, the Company concluded that Adjusted EBITDA is a more transparent measure that better assists investors in determining which businesses have the greatest impact on the Company's results. The Chief Operating Decision Maker uses Adjusted EBITDA to allocate resources and capital for each segment in the annual budget and forecasting process, including making decisions on where to reinvest profits to support segment growth. On a monthly basis, the Chief Operating Decision Maker reviews variances in budget versus actual Adjusted EBITDA and monitors changes in forecasted Adjusted EBITDA to assess the underlying operating performance and analyze risks and opportunities at each segment.

Revenue and Adjusted EBITDA are presented before inter-segment eliminations, which includes the effect of intercompany transactions with other segments except for charges for certain management fees and the write-off of intercompany balances, as applicable. All intra-segment activity has been eliminated within the segment. Inter-segment activity has been eliminated within the total consolidated results.

35 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

The following tables present financial information by segment for the periods indicated (in millions):

Three Months Ended September 30, 2026
Renewables SBU · Utilities SBU · Energy Infrastructure SBU · New Energy Technologies SBU · Total
Revenue$1,104$1,256$1,536$1$3,897
Corporate and other29
Eliminations(54)
Total Revenue$3,872
Less:
Total cost of sales excluding depreciation, amortization, and accretion of AROs (1)5538481,1408
Other segment items (2)551127413
Segment Adjusted EBITDA$496$296$322$(20)$1,094
Reconciliation to income from continuing operations before taxes:
Corporate and other(14)
Eliminations10
Interest expense(361)
Interest income71
Depreciation, amortization, and accretion of AROs(413)
Adjusted for:
Noncontrolling interests and redeemable stock of subsidiaries282
Income tax (expense) benefit, interest (expense) income, and depreciation, amortization, and accretion of AROs from equity affiliates(36)
Interest income recognized under service concession arrangements(13)
Unrealized derivatives, equity securities, and financial assets and liabilities losses(14)
Unrealized foreign currency gains8
Disposition/acquisition losses(4)
Impairment losses(69)
Loss on extinguishment of debt and troubled debt restructuring(10)
Merger costs(14)
Income from continuing operations before taxes$517

(1)Segment-level total cost of sales excluding depreciation, amortization, and accretion of AROs is considered regularly provided to the Chief Operating Decision Maker. Total cost of sales excluding depreciation, amortization, and accretion of AROs includes items such as fuel cost, electricity purchases, transmission charges, supplies, salaries and wages, consulting costs, IT costs, market fees, insurance, and lease expense.

Renewables SBU— business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

Energy Infrastructure SBU— service concession interest income, business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

36 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Three Months Ended September 30, 2025
Renewables SBU · Utilities SBU · Energy Infrastructure SBU · New Energy Technologies SBU · Total
Revenue$817$1,105$1,483$—$3,405
Corporate and other32
Eliminations(86)
Total Revenue$3,351
Less:
Total cost of sales excluding depreciation, amortization, and accretion of AROs (1)4587751,1103
Other segment items (2)639072—
Segment Adjusted EBITDA$296$240$301$(3)$834
Reconciliation to income from continuing operations before taxes:
Corporate and other(10)
Eliminations6
Interest expense(348)
Interest income76
Depreciation, amortization, and accretion of AROs(365)
Adjusted for:
Noncontrolling interests and redeemable stock of subsidiaries238
Income tax (expense) benefit, interest (expense) income, and depreciation, amortization, and accretion of AROs from equity affiliates(39)
Interest income recognized under service concession arrangements(15)
Unrealized derivatives, equity securities, and financial assets and liabilities gains20
Unrealized foreign currency losses(2)
Disposition/acquisition losses(5)
Impairment losses(61)
Loss on extinguishment of debt and troubled debt restructuring(1)
Income from continuing operations before taxes$328

(1)Segment-level total cost of sales excluding depreciation, amortization, and accretion of AROs is considered regularly provided to the Chief Operating Decision Maker. Total cost of sales excluding depreciation, amortization, and accretion of AROs includes items such as fuel cost, electricity purchases, transmission charges, supplies, salaries and wages, consulting costs, IT costs, market fees, insurance, and lease expense.

Renewables SBU— business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

Energy Infrastructure SBU— service concession interest income, business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

37 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Nine Months Ended September 30, 2026
Renewables SBU · Utilities SBU · Energy Infrastructure SBU · New Energy Technologies SBU · Total
Revenue$2,863$3,410$4,288$1$10,562
Corporate and other97
Eliminations(185)
Total Revenue$10,474
Less:
Total cost of sales excluding depreciation, amortization, and accretion of AROs (1)1,5312,3383,23614
Other segment items (2)19829010742
Segment Adjusted EBITDA$1,134$782$945$(55)$2,806
Reconciliation to income from continuing operations before taxes:
Corporate and other(16)
Eliminations25
Interest expense(1,082)
Interest income201
Depreciation, amortization, and accretion of AROs(1,280)
Adjusted for:
Noncontrolling interests and redeemable stock of subsidiaries713
Income tax (expense) benefit, interest (expense) income, and depreciation, amortization, and accretion of AROs from equity affiliates(121)
Interest income recognized under service concession arrangements(40)
Unrealized derivatives, equity securities, and financial assets and liabilities losses(34)
Unrealized foreign currency gains16
Disposition/acquisition gains152
Impairment losses(103)
Loss on extinguishment of debt and troubled debt restructuring(30)
Merger costs(41)
Income from continuing operations before taxes$1,166

(1)Segment-level total cost of sales excluding depreciation, amortization, and accretion of AROs is considered regularly provided to the Chief Operating Decision Maker. Total cost of sales excluding depreciation, amortization, and accretion of AROs includes items such as fuel cost, electricity purchases, transmission charges, supplies, salaries and wages, consulting costs, IT costs, market fees, insurance, and lease expense.

Renewables SBU— business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

Energy Infrastructure SBU— service concession interest income, business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

38 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Nine Months Ended September 30, 2025
Renewables SBU · Utilities SBU · Energy Infrastructure SBU · New Energy Technologies SBU · Total
Revenue$2,127$3,068$4,109$—$9,304
Corporate and other111
Eliminations(283)
Total Revenue$9,132
Less:
Total cost of sales excluding depreciation, amortization, and accretion of AROs (1)1,3462,1923,2086
Other segment items (2)842179239
Segment Adjusted EBITDA$697$659$809$(45)$2,120
Reconciliation to income from continuing operations before taxes:
Corporate and other(23)
Eliminations5
Interest expense(1,042)
Interest income215
Depreciation, amortization, and accretion of AROs(1,056)
Adjusted for:
Noncontrolling interests and redeemable stock of subsidiaries625
Income tax (expense) benefit, interest (expense) income, and depreciation, amortization, and accretion of AROs from equity affiliates(120)
Interest income recognized under service concession arrangements(44)
Unrealized derivatives, equity securities, and financial assets and liabilities losses(112)
Unrealized foreign currency gains1
Disposition/acquisition losses(172)
Impairment losses(7)
Loss on extinguishment of debt and troubled debt restructuring(13)
Restructuring costs(88)
Income from continuing operations before taxes$289

(1)Segment-level total cost of sales excluding depreciation, amortization, and accretion of AROs is considered regularly provided to the Chief Operating Decision Maker. Total cost of sales excluding depreciation, amortization, and accretion of AROs includes items such as fuel cost, electricity purchases, transmission charges, supplies, salaries and wages, consulting costs, IT costs, market fees, insurance, and lease expense.

Renewables SBU— business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

Energy Infrastructure SBU— service concession interest income, business development costs, miscellaneous gains and losses in Other income and Other expense, realized foreign currency gains and losses, earnings from equity affiliates, and adjustment for noncontrolling interest expense.

39 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

The Company uses long-lived assets as its measure of segment assets. Long-lived assets include amounts recorded in Property, plant, and equipment, netand right-of-use assets for operating leases recorded in Other noncurrent assets on the Condensed Consolidated Balance Sheets.

Long-Lived AssetsSeptember 30, 2026December 31, 2025
Renewables SBU$27,305$23,945
Utilities SBU10,3419,464
Energy Infrastructure SBU4,5144,726
New Energy Technologies SBU2723
Corporate and Other3329
Long-Lived Assets42,22038,187
Current assets6,7136,502
Investments in and advances to affiliates8911,004
Debt service reserves and other deposits12489
Goodwill342342
Other intangible assets2,0212,040
Deferred income taxes388397
Loan receivable690755
Other noncurrent assets, excluding right-of-use assets for operating leases2,6582,452
Total Assets$56,047$51,768
Depreciation, Amortization, and Accretion of AROsThree Months Ended September 30,Nine Months Ended September 30,
(in millions)2026202520262025
Renewables SBU$191$146$564$413
Utilities SBU137133410388
Energy Infrastructure SBU8084294248
New Energy Technologies SBU1—21
Corporate and Other42106
Total$413$365$1,280$1,056
Capital ExpendituresThree Months Ended September 30,Nine Months Ended September 30,
(in millions)2026202520262025
Renewables SBU$1,066$1,416$3,749$3,472
Utilities SBU4083691,123861
Energy Infrastructure SBU32248877
New Energy Technologies SBU1245
Corporate and Other24127
Total$1,509$1,815$4,976$4,422
Interest IncomeThree Months Ended September 30,Nine Months Ended September 30,
(in millions)2026202520262025
Renewables SBU$30$26$79$67
Utilities SBU3288
Energy Infrastructure SBU3439103121
New Energy Technologies SBU—2—6
Corporate and Other471113
Total$71$76$201$215
Interest ExpenseThree Months Ended September 30,Nine Months Ended September 30,
(in millions)2026202520262025
Renewables SBU$127$123$392$373
Utilities SBU8272238226
Energy Infrastructure SBU6271187221
New Energy Technologies SBU————
Corporate and Other9082265222
Total$361$348$1,082$1,042

40 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Net Equity in Earnings (Losses) of AffiliatesThree Months Ended September 30,Nine Months Ended September 30,
(in millions)2026202520262025
Renewables SBU$10$4$(14)$(11)
Utilities SBU—236
Energy Infrastructure SBU101198
New Energy Technologies SBU(10)(3)(36)(47)
Corporate and Other2(3)(2)(11)
Total$12$1$(30)$(55)
  1. REVENUE

The following table presents our revenue from contracts with customers and other revenue for the periods indicated (in millions):

Three Months Ended September 30, 2026
Renewables SBUUtilities SBUEnergy Infrastructure SBUNew Energy Technologies SBUCorporate, Other and EliminationsTotal
Non-Regulated Revenue
Revenue from contracts with customers$1,065$33$1,483$—$(25)$2,556
Other non-regulated revenue (1)39—531—93
Total non-regulated revenue1,104331,5361(25)2,649
Regulated Revenue
Revenue from contracts with customers—1,215———1,215
Other regulated revenue—8———8
Total regulated revenue—1,223———1,223
Total revenue$1,104$1,256$1,536$1$(25)$3,872
Three Months Ended September 30, 2025
Renewables SBUUtilities SBUEnergy Infrastructure SBUNew Energy Technologies SBUCorporate, Other and EliminationsTotal
Non-Regulated Revenue
Revenue from contracts with customers$756$22$1,312$—$(54)$2,036
Other non-regulated revenue (1)611171——233
Total non-regulated revenue817231,483—(54)2,269
Regulated Revenue
Revenue from contracts with customers—1,075———1,075
Other regulated revenue—7———7
Total regulated revenue—1,082———1,082
Total revenue$817$1,105$1,483$—$(54)$3,351

41 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

Nine Months Ended September 30, 2026
Renewables SBUUtilities SBUEnergy Infrastructure SBUNew Energy Technologies SBUCorporate, Other and EliminationsTotal
Non-Regulated Revenue
Revenue from contracts with customers$2,668$77$4,075$—$(88)$6,732
Other non-regulated revenue (1)19512131—410
Total non-regulated revenue2,863784,2881(88)7,142
Regulated Revenue
Revenue from contracts with customers—3,307———3,307
Other regulated revenue—25———25
Total regulated revenue—3,332———3,332
Total revenue$2,863$3,410$4,288$1$(88)$10,474
Nine Months Ended September 30, 2025
Renewables SBUUtilities SBUEnergy Infrastructure SBUNew Energy Technologies SBUCorporate, Other and EliminationsTotal
Non-Regulated Revenue
Revenue from contracts with customers$2,014$65$3,770$—$(172)$5,677
Other non-regulated revenue (1)1133339——455
Total non-regulated revenue2,127684,109—(172)6,132
Regulated Revenue
Revenue from contracts with customers—2,978———2,978
Other regulated revenue—22———22
Total regulated revenue—3,000———3,000
Total revenue$2,127$3,068$4,109$—$(172)$9,132

(1) Other non-regulated revenue primarily includes lease and derivative revenue not accounted for under ASC 606.

Contract Balances —The timing of revenue recognition, billings, and cash collections results in accounts receivable and contract liabilities. The contract liabilities from contracts with customers were $200 million and $374 million as of September 30, 2026 and December 31, 2025, respectively.

During the nine months ended September 30, 2026 and 2025, we recognized revenue of $227 million and $22 million, respectively, that was included in the corresponding contract liability balance at the beginning of the periods.

A significant financing arrangement exists for our Mong Duong plant in Vietnam. The plant was constructed under a BOT contract and sold to the Vietnamese government, while we remain the operator for the duration of the 25-year PPA. The performance obligation to construct the facility was substantially completed in 2015. Contract consideration related to the construction, but not yet collected through the 25-year PPA, was reflected on the Condensed Consolidated Balance Sheet. As of September 30, 2026 and December 31, 2025, the loan receivable balance was $781 million and $862 million, respectively. Of these amounts, $91 million and $107 million were classified in Other current assets, and $690 million and $755 million in Loan receivableon the Condensed Consolidated Balance Sheets, respectively.

Remaining Performance Obligations —The transaction price allocated to remaining performance obligations represents future revenue for unsatisfied (or partially unsatisfied) performance obligations at the end of the reporting period. As of September 30, 2026, the aggregate amount of transaction price allocated to remaining performance obligations was $195 million, primarily consisting of fixed consideration in development services contracts in the U.S., of which $79 million has been collected. We expect to recognize revenue of approximately $64 million in the remainder of 2026, $127 million in 2027, and the remainder thereafter.

  1. OTHER INCOME AND EXPENSE

Other income generally includes gains on insurance recoveries in excess of property damage, gains on asset sales and liability extinguishments, favorable judgments on contingencies, allowance for funds used during construction, gains on contingent consideration remeasurement, and other income from miscellaneous transactions. Other expense generally includes losses on asset sales and dispositions, losses on legal contingencies, losses on

42 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

remeasurement of contingent consideration, losses at commencement of sales-type leases, and losses from other miscellaneous transactions. The components are summarized as follows (in millions):

Three Months Ended September 30, · Nine Months Ended September 30,
2026 · 2025 · 2026 · 2025
Other IncomeGain on remeasurement of contingent consideration (1)$12$1$32$25
AFUDC (US Utilities)4192
Dividend income on investments1154
Gain on sale and disposal of assets2—51
Gain on write-off of contingent liabilities (2)—10—10
Other income261015
Total other income$21$19$61$57
Other ExpenseLoss on commencement of sales-type leases (3)$—$13$44$221
Loss on remeasurement of contingent consideration (1)1753947
Loss on sale and disposal of assets661114
Legal contingencies and settlements1—52
Non-service pension and other postretirement costs1236
Loss on remeasurement of investment (4)———48
Other——835
Total other expense$25$26$110$373

(1)Related to certain remeasurements of contingent consideration, primarily on projects acquired at AES Clean Energy. See Note 3—Fair Value for further information about remeasurement to fair value.

(2) For the period ended September 30, 2025, related to the write-off of contingent consideration for a renewables development project at AES Andes. See Note 16—Asset Impairment Expense for further information.

(3) Related to losses recognized at commencement of sales-type leases at AES Clean Energy. See Note 10—Leases for further information.

(4)For the period ended September 30, 2025, related to the remeasurement of our existing investment in 5B, accounted for using the measurement alternative. See Note 3—Fair Value for further information.

  1. ASSET IMPAIRMENT EXPENSE

The following table presents our asset impairment expense (reversals) for the periods indicated (in millions):

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
AES Clean Energy Development Projects$90$15$128$132
Mong Duong———(226)
AES Andes Development Project—16—16
Other1—54
Total$91$31$133$(74)

AES Clean Energy Development Projects— AES Clean Energy Development has a pipeline of U.S. renewables projects that are in various stages of development and construction. In some cases, if development efforts are not successful, the Company may abandon a particular project, writing off all the intangible assets and capitalized development costs incurred. The fair value of each abandoned project with no salvage value is determined to be zero as there are no future projected cash flows.

The Company recognized $128 million and $132 million of pre-tax asset impairment expense related to the write-off of projects that were determined to be no longer viable during the nine months ended September 30, 2026 and 2025, respectively. The $90 million of pre-tax impairment expense recorded during the three months ended September 30, 2026 was primarily related to a review of project budgets and the strategic evaluation of certain development-stage assets, resulting in the write-down of projects that no longer meet our investment criteria. Of the pre-tax impairment expense recorded during the nine months ended September 30, 2025, $51 million was related to right-sizing our development company as part of the restructuring program initiated in February 2025. See Note 21—Restructuring for further information. AES Clean Energy Development is reported in the Renewables SBU reportable segment.

AES Andes Development Project— In September 2025, the Company determined that a renewables development project at AES Andes was no longer viable. The Company recognized pre-tax impairment expense of $16 million related to the write-off of intangible assets and capitalized development costs as the fair value of the

43 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

project was determined to be zero. In addition, the Company recognized a $10 million gain in Other income due to the write-off of contingent consideration associated with the original acquisition of the project. See Note 15—Other Income and Expense for further information. AES Andes is reported in the Renewables SBU reportable segment.

Mong Duong — In November 2023, the Company entered into an agreement to sell its entire 51% ownership interest in Mong Duong 2, a coal-fired plant in Vietnam, and 51% equity interest in Mong Duong Finance Holdings B.V., an SPV accounted for as an equity affiliate (collectively "Mong Duong"). The carrying amount of the Mong Duong disposal group, which primarily consisted of our loan receivable from the sale of the power plant to the Vietnamese government, in subsequent periods exceeded the expected sales proceeds and as a result, the Company recognized pre-tax impairment expense of $17 million during the three months ended March 31, 2025.

As of May 31, 2025, due to delays in closing the transaction and the pending expiration of the agreement in November 2025, the Company determined Mong Duong no longer met the held-for-sale criteria. As such, the Mong Duong asset group was reclassified as held and used. The loan receivable was remeasured at amortized cost and non-loan assets were each individually remeasured at the lower of (i) carrying value before being classified as held for sale, adjusted for any depreciation expense or impairment losses that would have been recognized had the assets been continuously classified as held and used, or (ii) fair value at the date of the subsequent determination that held-for-sale criteria was no longer met. As a result, the Company recorded a $243 million increase in the carrying value of the Mong Duong asset group due to the derecognition of a $239 million valuation allowance on the loan receivable accounted for under ASC 310, which had been recognized in Asset impairment expense between December 31, 2023 and March 31, 2025 while Mong Duong was classified as held-for-sale, and the elimination of $4 million in net estimated costs to sell from the measurement of the asset group. See Note 18—Held-for-Sale and Dispositions for further information. Mong Duong is reported in the Energy Infrastructure SBU reportable segment.

  1. INCOME TAXES

The Company’s provision for income taxes is based on the estimated annual effective tax rate, plus discrete items. The effective tax rates for the three and nine months ended September 30, 2026 were both (2)%. The effective tax rates for the three and nine months ended September 30, 2025 were (69)% and (12)%, respectively. The difference between the Company’s effective tax rates for the 2026 and 2025 periods and the U.S. statutory tax rate of 21% related primarily to foreign tax rate differentials, the impacts of foreign currency fluctuations at certain foreign subsidiaries, nondeductible expenses, valuation allowance, the impacts of U.S. investment tax credits (“ITCs”), and noncontrolling interest in our U.S. subsidiaries.

For the three and nine months ended September 30, 2026, the Company recognized discrete tax benefit of approximately $43 million due to release of valuation allowance at the Bolero BESS project. Further, for the three and nine months ended September 30, 2026, the Company recognized discrete tax expense of approximately $19 million and $56 million, respectively, resulting from allocations of losses to tax equity investors on renewables projects.

For the nine months ended September 30, 2026, the Company recognized approximately $42 million of discrete tax expense as a result of the public sale of the Fluence Class A shares. Additionally, the Company recognized discrete tax benefit of approximately $54 million associated with this Fluence sell-down transaction due to release of valuation allowance on U.S. capital losses. See Note 7—Investments in and Advances to Affiliates for additional information regarding the Fluence sell-down transaction. Further, for the nine months ended September 30, 2026, the Company recorded discrete tax benefit of approximately $20 million associated with the merger of Cochrane into AES Andes.

For the three and nine months ended September 30, 2025, the Company recognized discrete tax expense of approximately $39 million and $83 million, respectively, resulting from allocations of losses to tax equity investors on renewables projects.

  1. HELD-FOR-SALE AND DISPOSITIONS

Held-for-Sale

JK Projects —In April 2025, the Company executed an agreement to contribute the Jemeiwaa Ka’I wind projects (“JK Projects”) to two trusts. In May 2026, the Company completed the contribution of two of the JK Projects, JK1 and JK2, to one of the trusts. See Dispositions below and Note 7—Investments in and Advances to Affiliates for further information.

44 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

As of September 30, 2026, the contribution of the remaining JK Projects has not been completed and they continue to be classified as held-for-sale but do not meet the criteria to be reported as discontinued operations. These projects are expected to be contributed to the trusts in late 2026 or early 2027. Since the fair value less costs to sell exceeded the carrying value of the disposal group, no impairment was recorded. On a consolidated basis, the carrying value of the remaining JK Projects held-for-sale as of September 30, 2026 was $12 million, consisting primarily of intangible assets. The JK Projects are reported in the Renewables SBU reportable segment.

Mong Duong —In November 2023, the Company entered into an agreement to sell its entire 51% ownership interest in Mong Duong 2, a coal-fired plant in Vietnam, and 51% equity interest in Mong Duong Finance Holdings B.V., an SPV accounted for as an equity affiliate (collectively "Mong Duong"). As a result, Mong Duong was classified as held-for-sale but did not meet the criteria to be reported as discontinued operations. The sale was subject to regulatory approval, and due to delays in closing the transaction and the pending expiration of the agreement, the Company determined the sale was no longer probable and that Mong Duong no longer met the held-for-sale criteria as of May 31, 2025. As a result, Mong Duong was classified as held and used as of September 30, 2026. The Company recorded an increase in the carrying value of the Mong Duong asset group primarily due to the derecognition of a $239 million valuation allowance on the loan receivable accounted for under ASC 310, which had been recognized in Asset impairment expense between December 31, 2023 and March 31, 2025 while Mong Duong was classified as held-for-sale. The agreement expired in November 2025 and the sale did not close. See Note 16—Asset Impairment Expense for further information. Mong Duong is reported in the Energy Infrastructure SBU reportable segment.

Dispositions

JK Projects — In May 2026, the Company completed the contribution of two of the JK Projects, JK1 and JK2, to a trust, receiving proceeds of $25 million. After closing the transaction, the Company retained 51% ownership in the trust, which is accounted for as an equity method investment. The transaction resulted in a pre-tax gain on sale of $24 million reported in Gain on disposal and sale of business interests. See Note 7—Investments in and Advances to Affiliates for further information. The JK Projects are reported in the Renewables SBU reportable segment.

Dominican Republic Renewables — In June 2025, the Company completed the sale of 50% of its interest in AES DR Renewables Holdings, S.L. and its subsidiaries (collectively “Dominican Republic Renewables”), whose main objective is the operation and administration of energy generation assets from primary energy resources. Of the sale price of $103 million, the Company received cash proceeds of $100 million in July 2025. The Company retained a 50% ownership interest in Dominican Republic Renewables after the sale and the business was deconsolidated and accounted for as an equity method investment. The transaction resulted in a pre-tax gain on sale of $70 million reported in Gain on disposal and sale of business interests, of which $37 million was related to remeasurement of the Company’s retained interest to its fair value. See Note 7—Investments in and Advances to Affiliates for further information. Dominican Republic Renewables is reported in the Renewables SBU reportable segment.

Ventanas — In January 2025, the Company completed the sale of its 100% ownership interest in Empresa Electrica Ventanas SpA and Nucleo SpA (collectively “Ventanas”), owner of a coal-fired energy generation facility in Chile, for $5 million. An immaterial loss on sale was recognized as a result of this transaction. The sale did not meet the criteria to be reported as discontinued operations. Prior to its sale, Ventanas was reported in the Energy Infrastructure SBU reportable segment.

  1. ACQUISITIONS

Crossvine — On May 16, 2025, the Company completed the acquisition of 100% of the membership interests in Crossvine Solar 1, LLC, which is developing an 85 MW solar generation facility and an 85 MW battery storage project in Indiana, for total consideration of $78 million. The nature of the assets acquired is largely intangible, consisting mainly of a project development intangible valued at $64 million. The transaction was accounted for as an asset acquisition of a variable interest entity that did not meet the definition of a business. Crossvine is reported in the Utilities SBU reportable segment.

AES Clean Energy Solar Project Acquisitions — On April 4, 2025, the Company closed on the acquisition of 100% of the membership interests in Homer Solar Energy Center, LLC, Moraine Solar Energy Center, LLC, and Tracy Solar Energy Center, LLC, which hold early-stage development solar energy projects in New York, with a capacity of 303 MW. The total fair value of the consideration was $30 million, including contingent consideration of $8 million. The contingent consideration will be updated quarterly with any prospective changes in fair value recorded through earnings. The fair value of the consideration paid was attributed mainly to a project development

45 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

intangible asset. The transaction was accounted for as an asset acquisition of variable interest entities that did not meet the definition of a business. These projects are reported in the Renewables SBU reportable segment.

  1. EARNINGS PER SHARE

Basic and diluted earnings per share are based on the weighted average number of shares of common stock and potential common stock outstanding during the period. Potential common stock, for purposes of determining diluted earnings per share, includes the effects of dilutive RSUs and stock options. The effect of such potential common stock is computed using the treasury stock method.

The following table is a reconciliation of the numerator and denominator of the basic and diluted earnings per share computation for income from continuing operations for the three and nine months ended September 30, 2026 and 2025, where income represents the numerator and weighted-average shares represent the denominator.

Three Months Ended September 30,20262025
(in millions, except per share data)IncomeShares$ per ShareIncomeShares$ per Share
BASIC EARNINGS PER SHARE
Income from continuing operations attributable to The AES Corporation common stockholders$553713$0.77$676712$0.95
Increase in redemption value of redeemable stock of subsidiaries(9)—(0.01)(5)—(0.01)
Income available to The AES Corporation common stockholders$544713$0.76$671712$0.94
EFFECT OF DILUTIVE SECURITIES
Restricted stock units—2——2—
DILUTED EARNINGS PER SHARE$544715$0.76$671714$0.94
Nine Months Ended September 30,20262025
(in millions, except per share data)IncomeShares$ per ShareIncomeShares$ per Share
BASIC EARNINGS PER SHARE
Income from continuing operations attributable to The AES Corporation common stockholders$1,466713$2.05$627712$0.88
Increase in redemption value of redeemable stock of subsidiaries(9)—(0.01)(15)—(0.02)
Income available to The AES Corporation common stockholders$1,457713$2.04$612712$0.86
EFFECT OF DILUTIVE SECURITIES
Restricted stock units—2——2—
DILUTED EARNINGS PER SHARE$1,457715$2.04$612714$0.86

Adjustments to Redemption Value — For the three and nine months ended September 30, 2026, income from continuing operations available to AES common stockholders included a $9 million adjustment related to the increase of the carrying value of redeemable stock of subsidiaries at AES Clean Energy Development.

For the three months ended September 30, 2025, income from continuing operations available to AES common stockholders included a $5 million adjustment related to the increase of the carrying value of redeemable stock of subsidiaries at AES Clean Energy Development.

For the nine months ended September 30, 2025, income from continuing operations available to the AES common stockholders included $10 million and $5 million adjustments related to the increase of the carrying value of redeemable stock of subsidiaries at the AGIC Companies and AES Clean Energy Development, respectively.

The Company has elected to administer these entire non-fair value redemption adjustments consistent with the treatment of dividends in the earnings per share calculation. While the adjustments impacted net income available to AES common stockholders and earnings per share, they did not impact Net income in the Condensed Consolidated Statement of Operations. See Note 11—Redeemable Stock of Subsidiaries for further information.

Anti-Dilutive Securities — The calculation of diluted earnings per share excluded 3 million outstanding stock awards for both the three and nine months ended September 30, 2026 and 2 million outstanding stock awards for both three and nine months ended September 30, 2025, respectively, which would be anti-dilutive. These stock awards could potentially dilute basic earnings per share in the future.

AES Global Insurance — As described in Note 11—Redeemable Stock of Subsidiaries, on April 30, 2025, the Company sold noncontrolling interests in the AGIC Companies. It is required that either (i) the AGIC Companies achieve a minimum distribution target to the Class B Member ranging from $146 million to $199 million over pre-defined periods of time ranging from three to five years (the “distribution period”) or (ii) AGIC achieves an average cash basis quarterly net income threshold for the period comprising the relevant distribution period and the four

46 | Notes to Condensed Consolidated Financial Statements | September 30, 2026 and 2025

quarters immediately prior to the start of such distribution period. AES can make disproportionate distributions to the Class B Member to meet the minimum distribution target for the distribution period. If, at the end of a distribution period, (1) such cash basis net income threshold is not met and (2) the minimum distribution target for such distribution period is not achieved, AES would be required to address the shortfall by issuing AES common stock (“Shortfall Stock”) to AGIC for the net difference between actual and targeted distributions. If AES is required to issue Shortfall Stock, the amount will be based upon the number of shares multiplied by the then current share price to equal the net difference between actual and targeted distributions. Distributions of cash from the sale of Shortfall Stock are subject to regulatory approval and at the discretion of AES.

As part of the quarterly diluted earnings per share calculation, AES evaluates whether (1) average cash basis quarterly net income in a given quarter exceeds the threshold or (2) aggregate distributions made to the investor for the related distribution period exceed such target distribution amount. If either condition is met, no Shortfall Stock will be included in the diluted earnings per share calculation. As of September 30, 2026, the average cash basis quarterly net income condition was met, and therefore, no shares are included in the calculation of diluted EPS.

  1. RESTRUCTURING

In February 2025, the Company approved and initiated a restructuring program to streamline our organization given the significantly lower number of countries that we operate in. Additionally, we right-sized our development company to focus on executing on the backlog and pursuing larger but fewer projects to better serve our core customers. No restructuring charges were recognized during the nine months ended September 30, 2026. From inception, the cumulative amount of restructuring costs incurred to date as of September 30, 2026 was $54 million.

During the nine months ended September 30, 2025, pre-tax restructuring charges related to employee severance costs were $53 million, of which $39 million was classified within Cost of sales and $14 million was classified as General and administrative expenseson the Condensed Consolidated Statements of Operations. For the nine months ended September 30, 2025, $20 million was recognized at the Energy Infrastructure SBU, $17 million at the Renewables SBU, $5 million at the Utilities SBU, $1 million at the New Energy Technologies SBU, and $10 million at Corporate and Other.

During the nine months ended September 30, 2025, AES Clean Energy Development also recognized $51 million of pre-tax asset impairment expense as a result of the restructuring program. See Note 16—Asset Impairment Expense for further information. AES Clean Energy Development is reported in the Renewables SBU reportable segment.

As of December 31, 2025, $5 million of pre-tax restructuring charges were reflected within Accrued and other liabilitieson the Condensed Consolidated Balance Sheets. During the nine months ended September 30, 2026, the Company made cash payments of $5 million. As of September 30, 2026, no pre-tax restructuring charges were reflected within Accrued and other liabilitieson the Condensed Consolidated Balance Sheets.

  1. DISCONTINUED OPERATIONS

Sul —In 2016, the Company completed the sale of Sul, its wholly-owned distribution company in Brazil, with its historical operating results reported as discontinued operations. In August 2025, an arbitration tribunal awarded the buyer an estimated $37 million in alleged damages plus interest, as well as potential future damages, under a dispute related to representations and warranties in the 2016 share purchase agreement, which the Company recognized as a loss from disposal of discontinued businesses.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.