Key Trends and Uncertainties

During 2025 and beyond, we expect to face the following challenges at certain of our businesses. Management expects that improved operating performance at certain businesses, growth from new businesses, and global cost reduction initiatives may lessen or offset their impact. If these favorable effects do not occur, or if the challenges described below and elsewhere in this section impact us more significantly than we currently anticipate, or if volatile foreign currencies and commodities move more unfavorably, then these adverse factors (or other adverse factors unknown to us) may have a material impact on our operating margin, net income attributable to The AES Corporation, and cash flows. We continue to monitor our operations and address challenges as they arise. For the risk factors related to our business, see Item 1.—Businessand Item 1A.—Risk Factors of our 2024 Form 10-K.

Operational

Trade Restrictions and Supply Chain— In April 2022, the U.S. Department of Commerce (“Commerce”) initiated an investigation into whether imports into the U.S. of solar cells and panels from Cambodia, Malaysia, Thailand, and Vietnam (“Southeast Asia”) were circumventing antidumping and countervailing duty (“AD/CVD”) orders on solar cells and panels from China. In August 2023, Commerce rendered final affirmative findings of circumvention with respect to all four countries, which resulted in the imposition of AD and CVD duties on certain imported cells and panels from Southeast Asia. Commerce’s determination and related matters remain the subject of ongoing litigation before the U.S. Court of International Trade and the U.S. Court of Appeals for the Federal Circuit.

In 2024, Commerce and the U.S. International Trade Commission (“U.S. ITC”) initiated new AD/CVD investigations on solar cells and panels imported from Southeast Asia. On April 18, 2025, Commerce rendered final affirmative determinations and AD/CVD rates with respect to all four countries. On June 13, 2025, the U.S. ITC issued its determination that imports from Malaysia and Vietnam have injured the U.S. industry and that imports from Cambodia and Thailand threaten injury. Commerce then issued orders on June 24, 2025, implementing the AD/CVD rates, which will be subject to annual review by Commerce. We do not expect these AD/CVD orders will have a negative impact on our business.

Separately, the U.S. maintains a global safeguard tariff (currently 14% ad valorem) on solar cells and modules pursuant to the Section 201 Safeguard Action on crystalline silicon photovoltaic products, which became effective in February 2018. On June 21, 2024, President Biden issued Proclamation 10779, revoking the exclusion of bifacial panels from safeguard relief previously proclaimed in Proclamation 10339, and reinstating the tariff on bifacial panels under the Section 201 Safeguard Action, subject to certain qualifications. These global tariffs are expected to expire in February 2026.

68 | The AES Corporation | September 30, 2025 Form 10-Q

The U.S. also maintains Section 301 tariffs on certain Chinese made lithium-ion batteries and related components utilized for energy storage systems, with such tariff currently set at 7.5% and increasing to 25% effective January 1, 2026. There are also ongoing AD/CVD investigations with respect to exports by China of natural and synthetic graphite used to make lithium-ion battery anode material. Final ITC and Commerce AD/CVD determinations in these investigations are expected in the first quarter of 2026 and could result in price increases.

Additionally, the Uyghur Forced Labor Prevention Act (“UFLPA”) seeks to block the import of products made with forced labor in certain areas of China, at any point in the supply chain, and may lead to certain suppliers being blocked from importing solar cells and panels into the U.S. While this has impacted the U.S. market, AES has managed this issue without significant impact to our projects. Further forced labor designations of entities under the UFLPA may impact our suppliers’ ability or willingness to meet their contractual agreements or to continue to supply cells or panels into the U.S. market on terms that we deem satisfactory.

The Trump Administration has threatened or imposed tariffs on a wide range of countries and products. On February 10, 2025, President Trump signed Executive Orders modifying existing Section 232 tariffs on steel and aluminum imports to expand their scope and impose 25% tariffs on both products. The President raised these rates to 50% effective June 4, 2025. At this time, we do not expect the modifications to tariffs on steel and aluminum to have a material impact on our business.

On February 1, 2025, President Trump issued an Executive Order declaring a national emergency under the International Emergency Economic Powers Act (“IEEPA”) with respect to U.S. importation of fentanyl. The President imposed a 10% additional tariff on imports from China, effective February 4, 2025. Effective March 4, 2025, this tariff was increased to 20%.

On April 2, 2025, President Trump issued an Executive Order pursuant to IEEPA imposing an indefinite, baseline reciprocal 10% tariff on almost all goods imported into the U.S., effective April 5, 2025, and individualized higher IEEPA tariffs (11% to 50%) starting April 9, 2025 on goods originating from 57 countries with trade surpluses with the U.S. On April 9, 2025, the U.S. government issued a further Executive Order increasing the IEEPA reciprocal tariff on China to 125% effective April 10, 2025. Concurrently, the U.S. government announced a temporary suspension of the country-specific reciprocal tariff measures targeting most U.S. trading partners for a 90-day period, or until July 9, 2025, which was later extended until August 1, 2025. Effective May 14, 2025, the IEEPA reciprocal tariff rate applicable to China was lowered to 10%. IEEPA reciprocal tariffs, at various levels, have now gone into effect for most U.S. trading partners.

Several trading partners (including the EU, Japan, South Korea, and the UK) have reached bilateral trade agreements with the U.S. The ultimate outcome of any reciprocal or other tariffs with countries that have not yet reached such trade agreements with the U.S. is uncertain. Also, the Supreme Court will hold oral argument on November 5, 2025, on the legality of the IEEPA tariffs, following lower court decisions declaring the tariffs unlawful.

In July 2025, Commerce initiated an investigation to determine the effects on national security of imports of polysilicon and its derivatives, pursuant to Section 232 of the Trade Expansion Act of 1962 (“Section 232”). In August 2025, Commerce initiated a separate investigation under Section 232 to determine the effects on national security of imports of wind turbines and their parts and components. The outcomes of these investigations are uncertain.

We expect the tariffs on imports from China will increase overall costs for materials and parts that are imported to build and maintain renewable energy plants for the U.S. industry. However, AES has already shifted its supply chain outside of China for the vast majority of final products used to build and maintain renewable energy plants in the U.S. We expect limited impact to projects scheduled to become operational in 2025 through 2027 due to the recently announced tariffs on China.

The impact of new tariffs, reciprocal tariffs, or Commerce investigations, the impact of any additional adverse Commerce determinations or other tariff disputes or litigation, the impact of the UFLPA, potential future disruptions to the renewable energy supply chain and their effect on AES’ U.S. project development and construction activities remain uncertain. AES will continue to monitor developments and take prudent steps towards maintaining a robust supply chain for our renewable energy projects. To that end, we have accelerated imports into the U.S. and increased our contracting for U.S. domestically manufactured solar panels, batteries, wind turbines, trackers, and other equipment, significantly mitigating the potential impacts from reciprocal tariffs or other tariffs.

More specifically, we have contracted and imported into the U.S. all of the solar panels that are necessary to complete our U.S. backlog of solar projects scheduled to finish construction and become operational in 2025. For our U.S backlog of solar projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted for most of our panel supply needs, with the majority of such panels being manufactured in the U.S. and

69 | The AES Corporation | September 30, 2025 Form 10-Q

most of the remaining panels have already been imported into the U.S. As for solar projects that are expected to become operational by 2027, based on current assessments and the ramp-up of domestic manufacturing, we anticipate limited purchases of imported PV modules. These imports are expected to be largely insulated from AD/CVD measures and potential Section 232 outcomes, as they are expected to be manufactured using U.S. polysilicon. Imports will exclude modules from countries currently subject to AD/CVD orders or investigations.

Additionally, we have contracted and imported into the U.S. all the batteries needed for our U.S. energy storage projects scheduled to be completed in 2025.

For our U.S. backlog of storage projects scheduled to finish construction and become operational in 2026 or 2027, we have contracted all our battery needs, with almost all of such batteries coming from U.S. or Korean suppliers. We are also well advanced in contracting U.S. domestically manufactured battery modules to support the remainder of our U.S. energy storage growth through 2027.

For our U.S. backlog of wind projects scheduled to be completed in 2025 through 2026, we have contracted and received delivery of all turbines, and for our 2027 backlog of U.S. wind projects, we are fully contracted with U.S. suppliers and suppliers with primarily U.S. manufactured turbines.

Operational Sensitivity to Dry Hydrological Conditions— Our hydroelectric generation facilities are sensitive to changes in the weather, particularly the level of water inflows into generation facilities. Dry hydrological conditions in Panama, Colombia, and Chile can present challenges for our businesses in these markets. Low inflows can result in low reservoir levels, reduced generation output, and subsequently possible increased prices for electricity. If our hydroelectric generation facilities cannot generate sufficient energy to meet contractual arrangements, we may need to purchase energy to fulfill our obligations, which could have an adverse impact on AES. As mitigation, AES has invested in thermal, wind, and solar generation assets, which have a complementary profile to hydroelectric plants. These plants are expected to have increased generation in low hydrology scenarios, offsetting possible impacts described from hydro assets.

La Niña conditions have emerged towards the end of Q3 2025 in the equatorial Pacific, following a period of ENSO-neutral conditions earlier in the year. According to the Climate Prediction Center (“CPC”) and the International Research Institute for Climate and Society (“IRI”), La Niña is expected to persist through the Northern Hemisphere winter (December 2025 to February 2026), with a transition back to ENSO-neutral conditions likely in early 2026. While the developing La Niña is forecasted to be weak, it may still produce regionally significant effects in some areas.

In Panama, total system inflows have remained near historical averages, with the Bayano and Fortuna reservoirs however experiencing above-average levels due to abundant rainfall in the northern basins. These favorable conditions have supported strong hydroelectric generation, reduced reliance on thermal generation, and enabled potential surplus energy sales into the spot market. Additionally, reduced dispatch of natural gas-fired units may create opportunities for gas reallocation to international markets.

In Colombia, the January to July 2025 period was the wettest since 1977 at key monitoring sites. Reservoir levels remained elevated through Q3, with Chivor and other major reservoirs above seasonal norms. Although August saw a slight decline in rainfall and a rise in spot prices, overall system storage remained robust. The onset of La Niña may bring additional rainfall in Q4, further supporting hydroelectric output and mitigating drought-related risks.

In Chile, 2025 is expected to be the third driest year on record. While winter precipitation and snowpack were near average, prolonged drought has kept reservoir levels low, broadly in line with last year’s levels. A weak La Niña may slow snowmelt; however, it is not expected to meaningfully alter near-term hydrological conditions.

The exact behavior pattern and strength of weather transitions (from/to La Niña or El Niño) is unknown and therefore the impacts could vary from those described above, and may include impacts to our businesses beyond hydrology, including with respect to power generation from other renewable sources of energy and demand. Even if rainfall and water inflows remain in line with historical averages, in some cases, market prices and generation above or below the average could present due to a variety of factors related to demand, market dynamics, or regulatory impacts. Impacts may be material to our results of operations.

Macroeconomic and Political

During the past few years, some countries where our subsidiaries conduct business have experienced macroeconomic and political changes. In the event these trends continue, there could be an adverse impact on our businesses.

70 | The AES Corporation | September 30, 2025 Form 10-Q

U.S. Tax Law Reform & Renewable Energy Tax Credits— On July 4, 2025, the U.S. enacted H.R. 1 (the “2025 Act”). The legislation significantly revised the laws governing U.S. renewable energy tax credits and the U.S. taxation of certain foreign earnings, which may impact our effective tax rate in future periods and could be material. In addition, the 2025 Act included amendments to, and extensions of, various other U.S. corporate income tax provisions including the determination of limitation on interest expense deductions. Any impact may change as U.S. Treasury and Internal Revenue Service (“IRS”) issue additional guidance, which may be material.

The U.S. Inflation Reduction Act of 2022 (the “IRA”) included provisions that benefited the U.S. clean energy industry, including increases, extensions, direct transfers, and/or new tax credits for onshore and offshore wind, solar, storage, and hydrogen projects. We account for U.S. renewables projects according to U.S. GAAP, which, when partnering with tax-equity investors to monetize tax benefits, utilizes the HLBV method. This method recognizes the value of the tax credit that benefits the tax equity investors at the time of its creation, which for projects utilizing the investment tax credit, begins in the quarter the renewables project is placed in service. For projects utilizing the production tax credit, this value is recognized over 10 years as the facility produces energy.

The 2025 Act amends the phase out of wind and solar ITC and PTC tax credits. Wind and solar renewables projects that begin construction within 12 months of the enactment of the 2025 Act remain eligible for 100% of the credit without the 2027 placed-in-service deadline, provided that, under current Treasury guidance, the projects are placed in service no more than four calendar years after the calendar year when construction began. Renewables projects that begin construction after 12 months of the enactment must be placed in service no later than 2027. Renewables projects that began construction by the end of 2024 are not impacted by the 2025 Act. The 2025 Act does not impose tighter timelines for energy storage projects to qualify for the ITC and PTC, and it allows energy storage projects to receive the full ITC or PTC credit if they begin construction by 2033.

The 2025 Act also imposes a restriction precluding credits for renewables projects, including storage, claiming the ITC or PTC credit that start construction after December 31, 2025 and receive material assistance from a prohibited foreign entity, effectively limiting the percentage of total project costs that may be derived from products that are mined, produced or manufactured in China, with varying permissible percentages depending on the calendar year and applicable renewable technology for the project. This restriction also precludes credit eligibility for projects that start construction after December 31, 2024 that are classified as a prohibited foreign entity, including projects over which a specified foreign entity is deemed to exercise formal or effective control.

Further, President Trump issued an Executive Order on July 7, 2025 that directed the Secretary of the Treasury to take action to enforce the provisions of the 2025 Act related to issuing updated guidance defining the start of construction for claiming the ITC and PTC and implementing the Foreign Entity of Concern (“FEOC”) Restrictions (the “Treasury Action”). The Executive Order also directed the Secretary of the Interior to take action to review its regulations, guidance, policies, and practices for any preferential treatment of wind and solar projects and eliminate those preferences within 45 days (the “Interior Action”).

On August 15, 2025, the Department of Treasury issued updated guidance defining the start of construction for purposes of claiming the ITC and PTC. AES does not expect the modifications to the start of construction guidance to materially impact its projects. The Department of Treasury did not issue guidance implementing the FEOC restrictions, however, guidance is expected to be released within the coming months, which may be material.

We expect the vast majority of our renewables project backlog to continue to qualify for the ITC and PTC. However, the Treasury Action may impose additional burdens in qualifying for the ITC and PTC.

In response to the Executive Order, the Department of Interior issued a memorandum requiring any “decisions, actions, consultations, and other undertakings” for wind or solar projects under Department of Interior jurisdiction to go through an additional three-phase approval process ending with approval from the Secretary of the Interior.

Our U.S. wind and solar projects are developed on private land and are designed in a manner that minimizes the potential of a federal nexus. However, due to the broad language of the memorandum, there may be some impact to projects developed on private land.

In 2024, we realized $1,313 million of earnings from Tax Attributes, comprised of $1,293 million from the Renewables SBU and $20 million from the Utilities SBU. In 2025, we expect an increase in earnings from Tax Attributes, mainly from our U.S. renewables business that is in line with the growth in that business. For the nine months ended September 30, 2025, we recognized $988 million in Tax Attributes.

The enactment of the 2025 Act requires that substantial guidance be published by the U.S. Department of Treasury and other government agencies. While we have taken significant measures to protect against the impact of changes under the 2025 Act to the IRA, including by implementing a program designed to ensure our backlog of

71 | The AES Corporation | September 30, 2025 Form 10-Q

U.S. renewables projects satisfy IRS safe harbor requirements for qualifying for the ITCs and PTCs, the impacts of the 2025 Act, the Treasury Action, the Interior Action or future actions that have the effect of modifying or repealing the ITCs and PTCs or adversely impacting renewable energy projects may be material to our results of operations.

Net CFC Tested Income (“NCTI”) — The 2025 Act amended the Global Intangible Low Taxed Income (“GILTI”) provision by eliminating the reduction to foreign earnings subject to GILTI by an allowable economic return on investment beginning January 1, 2026. The GILTI provision was also renamed to the NCTI provision. Additionally, the 2025 Act modified the U.S. foreign tax credit provisions beginning January 1, 2026. Although the new NCTI rules provide for a reduced 14 percent effective tax rate on captured foreign income, by way of a 40 percent deduction, companies with a U.S. net operating loss or otherwise insufficient taxable income will not benefit from the lower effective tax rate and may not be able to utilize foreign tax credits. The new NCTI rules may subject a portion of our foreign earnings to current U.S. taxation in the future and could be material.

Limitation on Interest Expense Deductions — The 2025 Act retroactively amended the existing limitation on the deductibility of net interest expense beginning January 1, 2025. As amended, the deduction will be limited to interest income, plus 30% of tax basis EBITDA. Previously, the limitation was based on 30% of tax basis Earnings Before Interest and Taxes (“EBIT”). We expect the amendment to increase the current period permitted interest deductions and reduce the amount of disallowed interest expense subject to an indefinite carryforward. The limitation continues to be inapplicable to interest expense attributable to regulated utility property.

Global Tax— The macroeconomic and political environments in the U.S. and in some countries where our subsidiaries conduct business have changed in recent years. This could result in significant impacts to future tax law. In the U.S., the IRA included a 15% corporate alternative minimum tax (“CAMT”) based on adjusted financial statement income. In June 2025, the IRS released interim guidance for CAMT and announced its intention to revise regulations that were proposed in September 2024. The impact to the Company in 2025 is not expected to be material. We will continue to monitor the issuance of CAMT revised guidance.

The Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. In June 2025, the Group of Seven (“G7”) nations issued a statement that they will work together to modify the Pillar 2 system in a manner that will fully exclude domestic and foreign profits of US-parented groups from Pillar 2’s Undertaxed Profits Rule and Income Inclusion Rule. We will continue to monitor the issuance of draft legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments and new interpretive guidance.

Inflation— In the markets in which we operate, there have been higher rates of inflation recently. While most of our contracts in our international businesses that are denominated in a currency other than the U.S. dollar are indexed to inflation, in general, our U.S.-based generation contracts are not indexed to inflation. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of some of our development projects that could negatively impact their competitiveness. Our utility businesses do allow for recovering of operations and maintenance costs through the regulatory process, which may have timing impacts on recovery.

Interest Rates— In the U.S. and other markets in which we operate, there has been a rise in interest rates since 2021, and interest rates are expected to remain volatile in the near term.

As discussed in Item 3.—Quantitative and Qualitative Disclosures about Market Risk, although most of our existing corporate and subsidiary debt is at fixed rates, an increase in interest rates can have several impacts on our business. For any existing debt under floating rate structures and any future debt refinancings, rising interest rates will increase future financing costs. In most cases in which we have floating rate debt, it is short term in nature or indexed to inflation, which helps mitigate the impact of rising rates. For future debt refinancings, AES actively manages a hedging program to reduce uncertainty and exposure to future interest rates. For new business, higher interest rates increase the financing costs for new projects under development and which have not yet secured financing.

AES typically seeks to incorporate expected financing costs into our new PPA pricing such that we maintain our target investment returns, but higher financing costs may negatively impact our returns or the competitiveness of some of our development projects. Additionally, we typically seek to enter into interest rate hedges shortly after signing PPAs to mitigate the risk of rising interest rates prior to securing long-term financing.

Argentina — In July 2024, the Argentine government enacted Law 27,742, known as Ley Bases, declaring a one-year public emergency in administrative, economic, financial, and energy matters. It grants the President delegated powers and initiates broad state reforms to deregulate the economy, including labor reform, the Incentive

72 | The AES Corporation | September 30, 2025 Form 10-Q

Regime for Large Investments, modifications to non-income tax measures, and the privatization of state-owned energy companies. Additionally, the Ministry of Energy issued Resolution 150/2024, repealing certain regulations from previous years that involved excessive state and CAMMESA intervention in the Wholesale Electricity Market (“MEM”).

On January 28, 2025, the Energy Secretariat issued Resolution 21/2025 to reform the MEM and is intended to ensure secure energy supply and stable consumer costs.

On April 11, 2025, the Central Bank of Argentina started a new economic program supported by a $20 billion agreement with the International Monetary Fund. Of this amount, $15 billion will be available in 2025. The key points of the program include (a) a removal of exchange restrictions for individuals and (b) foreign shareholders can distribute profits starting from 2025 and deadlines for foreign trade payments are relaxed.

On July 4, 2025, the Argentine government issued Decree 450/25, initiating a 24-month transition period to reform and deregulate the country’s electricity market. The decree encourages free contracting between private entities and fosters competition in electricity generation and commercialization. Subsequently, on October 20, 2025, the Ministry of Economy and the Secretariat of Energy issued Resolution 400/25, which became effective on November 1, 2025, and provides a new framework introducing more competitive price signals, decentralizing fuel management, and reducing subsidies.

These changes may have a profound impact on the sector, influencing our operations and financial results. It is not yet possible to predict the impact of these regulations in our consolidated results of operations, cash flows, and financial condition.

Puerto Rico — As discussed in Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties of the 2024 Form 10-K, our subsidiaries in Puerto Rico have long-term PPAs with state-owned PREPA, which has been facing economic challenges that could result in a material adverse effect on our business in Puerto Rico. Despite the Title III protection, PREPA has been making substantially all of its payments to the generators in line with historical payment patterns.

The Puerto Rico Oversight, Management, and Economic Stability Act (“PROMESA”) was enacted to create a structure for exercising federal oversight over the fiscal affairs of U.S. territories and created procedures for adjusting debt accumulated by the Puerto Rico government and, potentially, other territories (“Title III”). PROMESA also expedites the approval of key energy projects and other critical projects in Puerto Rico.

PROMESA allowed for the establishment of an Oversight Board with broad powers of budgetary and financial control over Puerto Rico. The Oversight Board filed for bankruptcy on behalf of PREPA under Title III in July 2017. As a result of the bankruptcy filing, AES Ilumina’s non-recourse debt of $20 million continues to be in technical default and is classified as current as of September 30, 2025.

In 2022, a mediation commenced to resolve the PREPA Title III case. On March 19, 2025, the judge presiding over the case entered an order to permit the filing of an amended plan of adjustment and litigation of specific issues, including administrative expense claim by non-settling bondholders. The stay of plan confirmation and bondholder rights-related litigation was extended without a termination date, and the non-settling bondholders' motion to lift the stay was denied. The PROMESA oversight board filed an amended plan of adjustment and disclosure statement for PREPA on March 28, 2025. The mediation period was extended through October 31, 2025.

Considering the information available as of the date hereof, management believes the carrying amount of our long-lived assets in Puerto Rico of $920 million is recoverable as of September 30, 2025.

Decarbonization Initiatives

Our strategy involves shifting towards clean energy platforms, including renewable energy, energy storage, LNG, and modernized grids. It is designed to position us for continued growth while reducing our carbon intensity and to be in support of our mission of accelerating the future of energy, together. We have made significant progress on our exit of coal generation, and by year-end 2025, we intend to have exited the substantial majority of our coal facilities that we owned in 2022. Due to a number of factors, including grid and market dynamics, we will continue to work towards exiting coal in the limited markets where we have coal generation. We currently anticipate these efforts will continue beyond 2027. We expect to further reduce the carbon intensity of our operations as we add more long-term contracted renewables to the grid each year.

In addition, initiatives have been announced by regulators, including in Chile, Puerto Rico, Bulgaria, and offtakers in recent years, with the intention of reducing GHG emissions generated by the energy industry. In parallel,

73 | The AES Corporation | September 30, 2025 Form 10-Q

the shift towards renewables has caused certain customers to migrate to other low-carbon energy solutions and this trend may continue.

Although we cannot currently estimate the financial impact of these decarbonization initiatives, new legislative or regulatory programs further restricting carbon emissions or other initiatives to voluntarily exit coal generation could require material capital expenditures, result in a reduction of the estimated useful life of certain coal facilities, or have other material adverse effects on our financial results.

For further information about the risks associated with decarbonization initiatives, see Item 1A.—Risk Factors—Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in the 2024 Form 10-K.

Regulatory

FERC, RTOs, and Interconnection Prioritization— FERC approved one-time queue jumping proposals in PJM, MISO, and SPP over the course of the year. Limited additions to each RTO’s queue are not expected to materially impact the projects already in our backlog; however, they could create uncertainty around network upgrade costs and the timing of integration of future projects in each RTO’s queue. See Item 1A.—Risk Factors - Our development projects are subject to substantial uncertainties included in the 2024 Form 10-K for further details.

AES Maritza PPA Review— DG Comp is conducting a preliminary review of whether AES Maritza’s PPA with NEK is compliant with the European Union's State Aid rules. No formal investigation has been launched by DG Comp to date. AES Maritza has previously engaged in discussions with the DG Comp case team and the Government of Bulgaria to attempt to reach a negotiated resolution of the DG Comp’s review (“PPA Discussions”). There are no active PPA Discussions at present, but those discussions could resume at any time. The PPA continues to remain in place. However, there can be no assurance that, in the context of DG Comp’s preliminary review or any future PPA Discussions, the other parties will not seek a prompt termination of the PPA.

We do not believe termination of the PPA is justified. Nevertheless, the PPA Discussions involved a range of potential outcomes, including but not limited to the termination of the PPA and payment of some level of compensation to AES Maritza. Any negotiated resolution would be subject to mutually acceptable terms, lender consent, and DG Comp approval. At this time, we cannot predict whether and when the PPA Discussions might resume or the outcome of any such discussions. Nor can we predict how DG Comp might resolve its review if the PPA Discussions do not resume or if any such discussions fail to result in an agreement concerning the agency's review. AES Maritza believes that its PPA is legal and in compliance with all applicable laws, and it will take all actions necessary to protect its interests, whether through negotiated agreement or otherwise. However, there can be no assurance that this matter will be resolved favorably; if it is not, there could be a material adverse effect on the Company’s financial condition, results of operations, and cash flows. As of September 30, 2025, the carrying value of our long-lived assets at Maritza is $336 million.

AES Ohio Smart Grid Phase 2 Filing — In February 2024, AES Ohio filed a Smart Grid Phase 2 with the PUCO proposing a ten-year investment plan to begin after Smart Grid Phase 1 ends. On September 13, 2024, AES Ohio reached a settlement with the PUCO Staff and other parties on the pending Smart Grid Phase 2 Application and an evidentiary hearing was held on October 29, 2024. A fundamental premise of the application was the continued availability of rider recovery of Smart Grid investments through the plan period. However, with the recent enactment of Sub. H.B. 15 described below, which prohibits AES Ohio from applying for a new electric security plan which includes certain rider recovery mechanisms, as well as the near-term financial uncertainty created by the statute, AES Ohio withdrew its Smart Grid Phase 2 Application on May 23, 2025. This withdrawal will provide AES Ohio flexibility as to the timing and scope of Smart Grid investments to continue to deliver their benefits to customers.

AES Ohio Distribution Rate Case— On November 29, 2024, AES Ohio filed a new distribution rate case with the PUCO. The investments reflected in the distribution rate case include investments to enhance the safety, reliability, and resilience of the distribution system. The application is based on a date certain of September 30, 2024 and a test period of June 1, 2024 to May 31, 2025. On June 27, 2025 the PUCO Staff submitted their Report and Recommendations. On August 13, 2025, AES Ohio entered into an unopposed Stipulation and Recommendation (the “Settlement”) with various intervening parties and the Staff of the PUCO. The Settlement provides for updated base rates for electric distribution service customers in AES Ohio’s service territory and among other matters includes: (i) an increase to its annual distribution revenue requirement of $168 million, which incorporates certain investments that are currently recovered through the Distribution Investment Rider; (ii) a return

74 | The AES Corporation | September 30, 2025 Form 10-Q

on equity of 9.999% and a cost of long-term debt of 4.49% on a distribution rate base of $1.25 billion and based on a capital structure of 53.87% equity and 46.13% long-term debt; and (iii) the net recovery of certain expenditures by AES Ohio, primarily related to one-time costs supporting the implementation of AES Ohio’s customer billing system upgrade. During the third quarter of 2025, AES Ohio recorded a net deferral of $8.4 million for previously recognized costs related to this recovery. The settlement is subject to, and conditioned upon, approval by the PUCO.

AES Ohio Legislation— On April 30, 2025, the Ohio legislature passed a new energy legislation (H.B. 15) that was signed by the Governor and became effective on August 14, 2025. The legislation allows Ohio's electric utilities to file three-year forecasted base distribution rate cases, which would replace electric security plans and associated recovery riders. Among other provisions, the legislation eliminates the Legacy Generation Resource (LGR) Rider, which previously allowed for recovery of net OVEC costs and revenues. Changes to the regulatory framework from this legislation, including the recovery of future net OVEC costs and revenues, could be material to our results of operations, financial condition, and cash flows.

AES Ohio Smart Grid Comprehensive Settlement — On October 23, 2020, AES Ohio entered into a Stipulation and Recommendation (the Settlement) with the staff of the PUCO, various customers and organizations representing customers of AES Ohio, and certain other parties with respect to, among other matters, AES Ohio's applications pending at the PUCO for (i) approval of AES Ohio's plan to modernize its distribution grid (Smart Grid Phase 1), (ii) findings that AES Ohio passed the SEET for 2018 and 2019, and (iii) findings that AES Ohio's ESP 1 satisfies the SEET and the more favorable in the aggregate (MFA) regulatory test. On June 16, 2021, the PUCO issued their opinion and order accepting the stipulation as filed. The OCC appealed the final PUCO order with respect to the 2018 and 2019 SEET to the Ohio Supreme Court on December 6, 2021. Oral arguments regarding this appeal were held on April 2, 2025. The Ohio Supreme Court reversed the PUCO's opinion and order with respect to the methodology used by the PUCO to support its findings related to the 2018 and 2019 SEET and remanded the case to the PUCO to conduct further analysis of the SEET for those years. AES Ohio filed testimony with the PUCO proposing a refund of $1.6 million based on analysis by its external financial consultant. The PUCO commenced an evidentiary hearing on this issue on October 28, 2025, and a PUCO decision is pending.

AES Indiana Rate Case Filing— On June 3, 2025, AES Indiana filed a petition with the IURC for authority to increase its basic rates and charges. On October 15, 2025, AES Indiana entered into a Stipulation and Settlement Agreement (the “Settlement Agreement”) with most parties in AES Indiana’s pending regulatory rate review at the IURC. This Settlement Agreement provides for updated base rates for electric services in AES Indiana’s territory and is subject, and conditioned upon, approval by the IURC. Among other things, the Settlement Agreement proposes an increase in AES Indiana’s revenue of $90.7 million and provides a return on common equity of 9.75% and cost of long-term debt of 5.34%, on a rate base of approximately $5.5 billion for AES Indiana’s 2027 electric service base rates. AES Indiana expects to receive an order from the IURC during the second quarter of 2026. The partial Settlement Agreement also includes a commitment to not implement additional base rate increases, following the implementation of new base rates under the settlement, until at least January of 2030 and to not start a second TDSIC Plan before January of 2028.

Foreign Exchange Rates

We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

The overall economic climate in Argentina has been volatile, resulting in increased risk that a further significant devaluation of the Argentine peso against the USD, similar to the devaluations experienced by the country in 2018, 2019, and 2023, may occur. A continued trend of peso devaluation could result in increased inflation, a deterioration of the country’s risk profile, and other adverse macroeconomic effects that could significantly impact our results of operations. For additional information, refer to Item 3.—Quantitative and Qualitative Disclosures About Market Risk.

Impairments and Realizability

Long-lived Assets and Current Assets Held-for-Sale — During the nine months ended September 30, 2025, the Company recognized asset impairment expense of $152 million. See Note 16—Asset Impairment Expense included in Item 1.—Financial Statementsof this Form 10-Q for further information. After recognizing this impairment expense, the carrying value of long-lived assets and current assets held-for-sale that were assessed for impairment totaled $33 million at September 30, 2025.

Events or changes in circumstances that may necessitate recoverability tests and potential impairments of

75 | The AES Corporation | September 30, 2025 Form 10-Q

long-lived assets may include, but are not limited to, adverse changes in the regulatory environment, unfavorable changes in power prices or fuel costs, increased competition due to additional capacity in the grid, technological advancements, declining trends in demand, evolving industry expectations to transition away from fossil fuel sources for generation, or an expectation it is more likely than not the asset will be disposed of before the end of its estimated useful life.

Tax Asset Realizability— Certain AES Chilean businesses have recorded net deferred tax assets ("DTA") of $245 million relating primarily to net operating loss carryforwards, which are not subject to expiration. Their realization is dependent on generating sufficient taxable income. At this time, management believes it is more likely than not that all of the DTA will be realized; however, it could be reduced by way of valuation allowance in the near term if estimates of future taxable income are reduced.

Environmental

The Company is subject to numerous environmental laws and regulations in the jurisdictions in which it operates. The Company faces certain risks and uncertainties related to these environmental laws and regulations, including existing and potential GHG legislation or regulations, and actual or potential laws and regulations pertaining to water discharges, waste management (including disposal of coal combustion residuals) and certain air emissions, such as SO 2, NOx, particulate matter, mercury, and other hazardous air pollutants, and species and habitat protections. Such risks and uncertainties could result in increased capital expenditures or other compliance costs which could have a material adverse effect on certain of our U.S. or international subsidiaries and our consolidated results of operations. For further information about these risks, see Item 1A.—Risk Factors—Our operations are subject to significant government regulation and could be adversely affected by changes in the law or regulatory schemes; Several of our businesses are subject to potentially significant remediation expenses, enforcement initiatives, private party lawsuits and reputational risk associated with CCR; Our businesses are subject to stringent environmental laws, rules and regulations; and Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in the 2024 Form 10-K.

CSAPR — CSAPR addresses the “good neighbor” provision of the CAA, which prohibits sources within each state from emitting any air pollutant in an amount which will contribute significantly to any other state’s nonattainment, or interference with maintenance of, any NAAQS. The CSAPR required significant reductions in SO 2 and NOx emissions from power plants in many states in which subsidiaries of the Company operate. The Company is required to comply with the CSAPR in certain states, including Indiana and Maryland. The CSAPR is implemented, in part, through a market-based program under which compliance may be achievable through the acquisition and use of emissions allowances created by the EPA. The Company complies with CSAPR through operation of existing controls and purchases of allowances on the open market, as needed.

In October 2016, the EPA published a final rule to update the CSAPR to address the 2008 ozone NAAQS (“CSAPR Update Rule”). The CSAPR Update Rule found that NOx ozone season emissions in 22 states (including Indiana and Maryland) affected the ability of downwind states to attain and maintain the 2008 ozone NAAQS, and, accordingly, the EPA issued federal implementation plans that both updated existing CSAPR NOx ozone season emission budgets for electric generating units (“EGUs”) within these states and implemented these budgets through modifications to the CSAPR NOx ozone season allowance trading program. Implementation started in the 2017 ozone season (May-September 2017). Affected facilities receive fewer ozone season NOx allowances in 2017 and later, possibly resulting in the need to purchase additional allowances. Following legal challenges to the CSAPR Update Rule, on April 30, 2021, the EPA issued the Revised CSAPR Update Rule. The Revised CSAPR Update Rule required affected EGUs within certain states (including Indiana and Maryland) to participate in a new trading program, the CSAPR NOx Ozone Season Group 3 trading program. These affected EGUs received fewer NOx Ozone Season allowances beginning in 2021.

On June 5, 2023, the EPA published a final Federal Implementation Plan ("FIP") to address air quality impacts with respect to the 2015 Ozone NAAQS. The rule establishes a revised CSAPR NOx Ozone Season Group 3 trading program for 22 states, including Indiana and Maryland, and became effective during 2023. The FIP also includes enhancements to the revised Group 3 trading program, which include a dynamic budget setting process beginning in 2026, annual recalibration of the allowance bank to reflect changes to affected sources, a daily backstop emissions rate limit for certain coal-fired EGUs beginning in 2024, and a secondary emissions limit prohibiting certain emissions associated with state assurance levels. It is too early to determine the impact of the final FIP, but it may result in the need to purchase additional allowances or make operational adjustments. On June 27, 2024, the U.S. Supreme Court issued an order granting a stay of the EPA’s 2023 FIP pending resolution of legal challenges to the FIP. On November 6, 2024, the EPA published an Interim Final Rule in the Federal Register in

76 | The AES Corporation | September 30, 2025 Form 10-Q

response to the U.S. Supreme Court’s stay of its FIP addressing interstate transport for the 2015 ozone national ambient air quality standards. The effective date is November 6, 2024. The Interim Final Rule stays the effectiveness of the Good Neighbor FIP and revises the CSAPR regulations to continue application of the states’ respective trading programs.

While the Company's additional CSAPR compliance costs to date have been immaterial, the future availability of and cost to purchase allowances to meet the emission reduction requirements is uncertain at this time, but it could be material.

Mercury and Air Toxics Standard — In April 2012, the EPA’s rule to establish maximum achievable control technology standards for hazardous air pollutants regulated under the CAA emitted from coal and oil-fired electric utilities, known as “MATS”, became effective and AES facilities implemented measures to comply, as applicable. On May 7, 2024, the EPA published a final rule to revise MATS for coal and oil-fired EGUs. The final rule became effective on July 8, 2024. The final rule lowers certain emissions limits and revises certain other aspects of MATS. The MATS RTR Rule is subject to legal challenges. On October 4, 2024, the U.S. Supreme Court denied emergency stay applications. On June 17, 2025, the EPA published a proposed rule to repeal the majority of the May 7, 2024 final rule revising MATS.

Further rulemakings and/or proceedings are possible; however, in the meantime, MATS remains in effect. We currently cannot predict the outcome of the regulatory or judicial process, or its impact, if any, on our MATS compliance planning or ultimate costs.

Climate Change Regulation — The final NSPS for CO 2 emissions from new, modified, and reconstructed fossil-fuel-fired power plants were published in the Federal Register on October 23, 2015. Several states and industry groups challenged the NSPS for CO 2 in the D.C. Circuit Court. On December 20, 2018, the EPA published proposed revisions to the final NSPS for new, modified, and reconstructed coal-fired electric utility steam generating units. The EPA proposed that the Best System of Emissions Reduction (“BSER”) for these units is highly efficient generation that would be equivalent to supercritical steam conditions for larger units and sub-critical steam conditions for smaller units, and not partial carbon capture and sequestration (“CCS”), which had been the BSER for these units in the 2015 final NSPS. The EPA did not include revisions for natural-gas combined cycle or simple cycle units in the December 20, 2018 proposal. Challenges to the GHG NSPS remain held in abeyance at this time. On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements. The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018.

On July 8, 2019, the EPA published the final Affordable Clean Energy (“ACE”) Rule which would have established CO 2 emission rules for existing power plants under CAA Section 111(d) and would have replaced the EPA's 2015 Clean Power Plan Rule (“CPP”). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance while the EPA developed a replacement rule. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule and proposed New Source Performance Standards (“NSPSs”) that would establish emissions guidelines in the form of CO 2 emissions limitations for certain existing EGUs and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines. Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. On May 9, 2024, the EPA published the final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024. Existing EGUs are those that were constructed prior to January 8, 2014. Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO 2 depending on the date that coal operations cease. Specific standards for performance for EGUs will be established through a State Plan (or a Federal Plan if a state were to not submit an approvable plan). The May 2024 rule is subject to legal challenges. On October 16, 2024, the U.S. Supreme Court denied emergency stay applications.

On June 17, 2025, the EPA published a proposed rule to repeal the May 9, 2024 final rules for new and existing EGUs in addition to 2015 greenhouse gas NSPSs for certain new EGUs. In this proposed rule, the EPA

77 | The AES Corporation | September 30, 2025 Form 10-Q

also offered an alternative proposal to repeal a narrower set of greenhouse gas requirements which would include the repeal of requirements for existing EGUs and requirements based on carbon capture and sequestration for new EGUs. On August 1, 2025, the EPA published a proposed rule to rescind the 2009 greenhouse gas endangerment finding which concluded that greenhouse gases endanger public health and welfare.

The impact of the rules, the results of further proceedings, and potential future greenhouse gas emissions regulations remain uncertain but could be material.

Waste Management — On October 19, 2015, an EPA rule regulating CCR under the Resource Conservation and Recovery Act as nonhazardous solid waste became effective. The rule established nationally applicable minimum criteria for the disposal of CCR in new and currently operating landfills and surface impoundments, including location restrictions, design and operating criteria, groundwater monitoring, corrective action and closure requirements, and post-closure care. The primary enforcement mechanisms under this regulation would be actions commenced by the states and private lawsuits. On December 16, 2016, the Water Infrastructure Improvements for the Nation Act ("WIIN Act") was signed into law. This includes provisions to implement the CCR rule through a state permitting program, or if the state chooses not to participate, a possible federal permit program. If this rule is finalized before Indiana or Puerto Rico establishes a state-level CCR permit program, AES CCR units in those locations could eventually be required to apply for a federal CCR permit from the EPA. The EPA has indicated that it will implement a phased approach to amending the CCR Rule, which is ongoing. On August 28, 2020, the EPA published final amendments to the CCR Rule titled "A Holistic Approach to Closure Part A: Deadline to Initiate Closure," that, among other amendments, required certain CCR units to cease waste receipt and initiate closure by April 11, 2021. The CCR Part A Rule also allowed for extensions of the April 11, 2021 deadline if the EPA determines certain criteria are met. Facilities seeking such an extension were required to submit a demonstration to the EPA by November 30, 2020. On January 11, 2022, the EPA released the first in a series of proposed determinations regarding CCR Part A Rule demonstrations and compliance-related letters notifying certain other facilities of their compliance obligations under the federal CCR regulations. The determinations and letters include interpretations regarding implementation of the CCR Rule. On April 8, 2022, petitions for review were filed challenging these EPA actions. The petitions are consolidated in Electric Energy, Inc. v. EPA. On June 28, 2024, the D.C. Circuit dismissed the challenges. It is too early to determine the direct or indirect impact of these letters or any determinations that may be made.

On May 18, 2023, the EPA published a proposed rule that would expand the scope of CCR units regulated by the CCR Rule to include inactive surface impoundments at inactive generating facilities as well as additional inactive and closed landfills and certain other accumulations of CCR. On May 8, 2024, the EPA published final revisions to the CCR rule whichare effective on November 8, 2024. The final revisions expand the scope of CCR units regulated by the CCR rule to include legacy surface impoundments, inactive surface impoundments, and CCR management units. On July 22, 2025, the EPA published both a direct final rule and a proposed rule that, if finalized, would extend certain deadlines for CCR management units associated with its May 8, 2024 revisions to the CCR Rule. On September 4, 2025, the EPA withdrew the direct final rule due to receipt of adverse comment. It istoo early to determine the potential impact from the July 22, 2025 proposed revisions to the CCR Rule.

On February 20, 2020, the EPA published a proposed rule to establish a federal CCR permit program that would operate in states without approved CCR permit programs. If this rule is finalized before Indiana establishes a final state-level CCR permit program, AES Indiana could eventually be required to apply for a federal CCR permit from the EPA. On December 21, 2022, the Indiana Department of Environmental Management (“IDEM”) published in the Indiana Register a Second Notice of Comment Period for its proposed CCR rulemaking which would include regulation of CCR through a state permitting program. On August 7, 2024, in response to changes to Indiana statute, as well as comments received during the Second Notice of Comment Period, IDEM published a Continuation of the Second Notice of Comment Period for proposed amendments to the draft rule language for a State CCR Permitting Program.

The CCR rule, current or proposed amendments to or interpretations of the CCR rule, the results of groundwater monitoring data, or the outcome of CCR-related litigation could have a material impact on our business, financial condition, and results of operations. AES Indiana would seek recovery of any resulting expenditures; however, there is no guarantee we would be successful in this regard.

Cooling Water Intake— The Company's facilities are subject to a variety of rules governing water use and discharge. In particular, the Company's U.S. facilities are subject to the CWA Section 316(b) rule issued by the EPA effective in 2014 that seeks to protect fish and other aquatic organisms drawn into cooling water systems at power plants and other facilities. These standards require affected facilities to choose among seven Best Technology Available (“BTA”) options to reduce fish impingement. In addition, certain facilities must conduct studies to assist

78 | The AES Corporation | September 30, 2025 Form 10-Q

permitting authorities to determine whether and what site-specific controls, if any, would be required to reduce entrainment of aquatic organisms. It is possible that this process, which includes permitting and public input, could result in the need to install closed-cycle cooling systems (closed-cycle cooling towers) or other technology. Finally, the standards require that new units added to an existing facility to increase generation capacity are required to reduce both impingement and entrainment. It is not yet possible to predict the total impacts of this final rule at this time, including any challenges to such final rule and the outcome of any such challenges. However, if additional capital expenditures are necessary, they could be material.

Certain AES Southland OTC units were required to be retired to provide interconnection capacity and/or emissions credits prior to startup of new (air cooled) generating units, and the remaining AES OTC generating units in California have been or will be shut down and permanently retired by the applicable OTC Policy compliance dates for the respective units. The California State Water Resources Board (“SWRCB”) OTC Policy currently requires the shutdown and permanent retirement of the remaining OTC generating units at AES Huntington Beach, LLC and AES Alamitos, LLC by December 31, 2026, as extended in support of grid reliability. This extension compliance date is contingent upon the facilities participating in the Strategic Reserve established by AB 205.

Power plants are required to comply with the more stringent of state or federal requirements. At present, the California state requirements are more stringent and have earlier compliance dates than the federal EPA requirements, and are therefore applicable to the Company's California assets. The Company anticipates that compliance with CWA Section 316(b) regulations and associated costs could have a material impact on our consolidated financial condition or results of operations.

Water Discharges— In June 2015, the EPA and the U.S. Army Corps of Engineers ("the Agencies") published a rule defining federal jurisdiction over waters of the U.S., known as the "Waters of the U.S." (“WOTUS”) rule. WOTUS defines the geographic reach and authority of the Agencies to regulate streams, wetlands, and other water bodies under the CWA. There have been multiple Supreme Court decisions and dueling regulatory definitions over the past several years concerning the proper standard for how to properly determine whether a wetland or stream that is not navigable is considered a WOTUS. On May 25, 2023, the U.S. Supreme Court rendered a decision (“Decision”) in the case of Sackett v. Environmental Protection Agency, addressing the definition of WOTUS with regards to the CWA. This decision provides a clear standard that substantially restricts the Agencies' ability to regulate certain types of wetlands and streams. Specifically, under this decision, wetlands that do not have a continuous surface connection with traditional interstate navigable water are not considered a WOTUS and therefore are not federally jurisdictional.

On September 8, 2023, the Agencies published final rule amendments in the Federal Register to amend the final “Revised Definition of ‘Waters of the United States’” rule. This final rule conforms the definition to the definition adopted in the Decision. The Agencies have amended key aspects of the regulatory text to conform the rule to the Decision.

Due to ongoing litigation, the definition of WOTUS (as amended on September 8, 2023) is not operative in certain jurisdictions. In the jurisdictions involved in the litigation the amended 2023 Rule is subject to a preliminary injunction, and the Agencies interpret WOTUS consistent with the pre-2015 regulatory regime and the Supreme Court’s decision in Sackett. In the remaining states the Agencies implement the definition in the January 2023 Rule, as amended in September 2023.

On March 12, 2025, the Agencies issued a joint guidance memorandum for implementing “continuous surface connection” consistent with the Decision and related issues. The Federal Register notice was published on March 24, 2025 outlining a process to gather recommendations for implementation of WOTUS. It is too early to determine whether the outcome of litigation or current or future revisions to rules interpreting federal jurisdiction over WOTUS may have a material impact on our business, financial condition, or results of operations.

In November 2015, the EPA published its final ELG rule to reduce toxic pollutants discharged into waters of the U.S. by steam-electric power plants through technology applications. These effluent limitations for existing and new sources include dry handling of fly ash, closed-loop or dry handling of bottom ash, and more stringent effluent limitations for flue gas desulfurization wastewater. AES Indiana Petersburg has installed a dry bottom ash handling system in response to the CCR rule and wastewater treatment systems in response to the NPDES permits in advance of the ELG compliance date. Other U.S. businesses already include dry handling of fly ash and bottom ash and do not generate flue gas desulfurization wastewater. Following the 2019 U.S. Court of Appeals vacatur and remand of portions of the 2015 ELG rule related to leachate and legacy water, on March 29, 2023, the EPA published a proposed rule revising the 2020 Reconsideration Rule. On May 9, 2024, the EPA published a final rule which became effective on July 8, 2024. The final rule established more stringent best available technology limits for flue gas desulfurization wastewater, bottom ash transport water, and combustion residual leachate and established

79 | The AES Corporation | September 30, 2025 Form 10-Q

a new set of definitions and new limits for combustion residual leachate and legacy wastewater. The May 2024 rule is subject to legal challenges. On October 10, 2024, the Eighth Circuit Court denied stay applications. On October 2, 2025, the EPA published a proposed rule that, if finalized, would extend certain ELG deadlines and allow facilities to choose between compliance alternatives. On the same date, the EPA also published a direct final rule to extend the deadline for power plants to file a notice of planned participation for the permanent cessation of coal from December 31, 2025, to December 31, 2031, pending any significant adverse comment. It is too early to determine whether any outcome of these proposed rules, litigation or future revisions to the ELG rule might have a material impact on our business, financial condition, and results of operations.

U.S. Executive Actions Affecting Environmental Regulations — On January 20, 2025, President Trump issued an Executive Order directing Agencies to, among other tasks, review regulations issued under the prior administration to determine whether they should be suspended, revised, or rescinded. President Trump also issued a Memorandum directing agencies to refrain from proposing or issuing any rules until the current administration has reviewed and approved those rules. In accordance with these and other Executive Orders, on March 12, 2025, the EPA released a list of environmental regulations that will be targeted for reconsideration and other deregulatory action. These and other actions, including other Executive Orders and directives from the administration, may have an impact on regulations and permitting processes that may affect our business, financial condition, or results of operations.